Changes related to "750.7 Non-Hydraulic Considerations"

Jump to: navigation, search

This is a list of changes made recently to pages linked from a specified page (or to members of a specified category). Pages on your watchlist are bold.

Recent changes options
Legend:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide minor edits | Show bots | Hide anonymous users | Hide registered users | Hide my edits

Show new changes starting from 03:32, 21 July 2019
   
Page name:

19 July 2019

 m   13:07  751.1 Preliminary Design‎‎ (2 changes | history) . . (+37). . [Smithk‎ (2×)]
 m   13:07 (cur | prev) . . (+37). . Smithk (Talk | contribs) (751.1.2.21 Substructure Type)
 m   12:27 (cur | prev) . . (0). . Smithk (Talk | contribs) (751.1.2.21 Substructure Type: Per BR, updated guidance about galvanization for 50-ft pile lengths. By changing 30 ft to 50 ft, pile suppliers can keep galvanized piles in stock thus expediting construction when additional pile lengths are required)

15 July 2019

 m   15:11  751.1 Preliminary Design‎ (diff | hist) . . (-794). . Smithk (Talk | contribs) (Per BR, deleted the reference to paint removal since this BSP is no longer used and it is covered in the spec book.)