Search results

Jump to navigation Jump to search

Page title matches

  • |[[media:235.8 Glide Clearance.doc|Glide Clearance]] |[[media:235.8 County Map Location.doc|County Map Section]]
    0 members (0 subcategories, 0 files) - 12:07, 26 March 2024

Page text matches

  • |[[:Category:235 Preliminary Plans|EPG 235 Preliminary Plans]]
    8 members (0 subcategories, 0 files) - 11:38, 2 March 2021
  • <categorytree mode=all>235 Preliminary Plans</categorytree> <categorytree mode=all>237 Contract Plans</categorytree>
    0 members (0 subcategories, 0 files) - 12:33, 18 December 2020
  • ...project. Do not wait to submit the RES, for example, until the preliminary plans are sent for approval. When changes to a project occur, do not wait to send ...ew any projects that may take longer to clear than others. The preliminary plans RES is the most important RES submittal for Environmental and Historic Pres
    10 KB (1,551 words) - 09:32, 2 February 2024
  • ...Plans#235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)|EPG 235.2.3 Municipal Agreements and County Agreements]]. The agency responsible fo
    3 KB (367 words) - 11:00, 20 March 2020
  • * [[media:124.2.4 Check List for Preliminary Plans.docx|Preliminary Plan Review checklist]] * [[media:124 Design Review Final Plans.doc|Final Plan Review checklist]]
    0 members (0 subcategories, 0 files) - 13:50, 19 December 2023
  • ...ocess, it becomes necessary to develop a [[:Category:235 Preliminary Plans#235.2.3 Project Agreements|project agreement]] if elements of the project are t :1. Preliminary Engineering (PE)
    9 KB (1,398 words) - 10:40, 3 March 2023
  • ...e ||No|| [[:Category:235 Preliminary Plans#235.2.3 Project Agreements|EPG 235.2.3]] ...e|| No || [[:Category:235 Preliminary Plans#235.2.3 Project Agreements|EPG 235.2.3]]
    18 KB (2,289 words) - 13:42, 10 May 2023
  • |[[:Category:237 Contract Plans|<center>'''Return to<br/>EPG 237 Contract Plans'''</center>]] ...Distribution of Preliminary Plans]]|| ||1-03.6 Distribution of Preliminary Plans and Drawings
    26 KB (3,071 words) - 08:38, 11 March 2022
  • |[[media:235.8 Glide Clearance.doc|Glide Clearance]] |[[media:235.8 County Map Location.doc|County Map Section]]
    0 members (0 subcategories, 0 files) - 12:07, 26 March 2024
  • ...riteria, basic geometric details and recommendations upon which the detail plans are to be developed. ...y:235 Preliminary Plans|Preliminary Plans Approved]]''' - Date preliminary plans are completed. All changes resulting from the Design Hearing and VE Study
    0 members (0 subcategories, 0 files) - 16:42, 21 September 2023
  • ...EPG 235.2.3 Project Agreements]]. These agreements must be in place by the Plans, Specs and Estimates (PS&E) deadline for the project. MoDOT has legal liabi
    1 member (0 subcategories, 0 files) - 14:50, 6 April 2021
  • ...n agreement with the MHTC and receive Commission approval of the project’s plans and specifications <u>before imposition of the tax or fee to fund any porti * The MHTC must appoint an advisor to the TDD and approve modifications to plans, specifications and project description.
    56 KB (8,709 words) - 13:18, 18 February 2022
  • ...lor:black; background-color: #EBEBEB;">[+/-] Project Closeout and As-Built Plans</div> ...modot.org/forms/CM/As_Built_Final_Plans_Checklist_SL_District.pdf As Built Plans Checklist - SL District]
    0 members (0 subcategories, 0 files) - 15:15, 17 April 2024
  • ...ype of excavation included in the project during the [[237.9 Submission of Plans and Supporting Documents#237.9.8 Pre-Bid Conferences|pre-bid conference]]'' ...nt management system and eProjects SharePoint site. The submittal of paper plans is not allowed unless specifically approved by Design. The district will be
    43 KB (6,735 words) - 12:29, 5 February 2024
  • ...y:235 Preliminary Plans|preliminary plan]], right of way certification, or plans, specifications, and estimate (PS&E). In general, it is best to identify a
    21 KB (3,103 words) - 12:36, 18 September 2023
  • ...nly require the preparation of a combined conceptual study and preliminary plans. ...] (RES) requesting project screening and early constraint identification. Preliminary screening may have been completed in order to obtain a CE classification fr
    0 members (0 subcategories, 0 files) - 09:36, 2 February 2024
  • ==616.3.1 Temporary Traffic Control Plans (MUTCD Section 6C.01)== ...tant auxiliary provisions that cannot conveniently be specified on project plans can easily be incorporated into Special Provisions within the TTC plan.
    44 KB (6,776 words) - 10:56, 22 October 2021
  • ...of the soil in its natural state throughout the area where the contractor plans to start grading. :*Plans and special provisions for any special equipment or construction procedures
    0 members (0 subcategories, 0 files) - 13:00, 10 May 2022
  • In pre-timed operation, signal sequence is controlled by signal plans, which define the order of the signal intervals that are displayed. The amo ====902.5.5.2.2 Determine Timing Plans to Use====
    302 KB (45,956 words) - 10:51, 12 April 2024
  • ...ocation payment offers withdrawn, normally due to a change in construction plans which eliminates the need for a previously designated right of way parcel, As soon as plans are developed to the point that it is both possible and desirable to obtain
    713 KB (112,088 words) - 11:51, 9 August 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)