Search results

Jump to navigation Jump to search

Page title matches

  • |[[media:235.8 Glide Clearance.doc|Glide Clearance]] |[[media:235.8 County Map Location.doc|County Map Section]]
    0 members (0 subcategories, 0 files) - 12:07, 26 March 2024

Page text matches

  • |[[:Category:235 Preliminary Plans|EPG 235 Preliminary Plans]]
    8 members (0 subcategories, 0 files) - 11:38, 2 March 2021
  • <categorytree mode=all>235 Preliminary Plans</categorytree>
    0 members (0 subcategories, 0 files) - 12:33, 18 December 2020
  • ...tage of the project. Do not wait to submit the RES, for example, until the preliminary plans are sent for approval. When changes to a project occur, do not wait t ...desktop review any projects that may take longer to clear than others. The preliminary plans RES is the most important RES submittal for Environmental and Histori
    10 KB (1,551 words) - 09:32, 2 February 2024
  • ...Plans#235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)|EPG 235.2.3 Municipal Agreements and County Agreements]]. The agency responsible fo
    3 KB (367 words) - 11:00, 20 March 2020
  • * [[media:124.2.4 Check List for Preliminary Plans.docx|Preliminary Plan Review checklist]] * [[media:124 Design Review Final Plans.doc|Final Plan Review checklist]]
    0 members (0 subcategories, 0 files) - 08:25, 6 May 2024
  • ...ocess, it becomes necessary to develop a [[:Category:235 Preliminary Plans#235.2.3 Project Agreements|project agreement]] if elements of the project are t :1. Preliminary Engineering (PE)
    9 KB (1,398 words) - 10:40, 3 March 2023
  • ...e ||No|| [[:Category:235 Preliminary Plans#235.2.3 Project Agreements|EPG 235.2.3]] ...e|| No || [[:Category:235 Preliminary Plans#235.2.3 Project Agreements|EPG 235.2.3]]
    18 KB (2,289 words) - 09:39, 7 May 2024
  • ...Plans|235.7 Distribution of Preliminary Plans]]|| ||1-03.6 Distribution of Preliminary Plans and Drawings ==Chapter II, Preliminary Design==
    26 KB (3,071 words) - 08:38, 11 March 2022
  • |[[media:235.8 Glide Clearance.doc|Glide Clearance]] |[[media:235.8 County Map Location.doc|County Map Section]]
    0 members (0 subcategories, 0 files) - 12:07, 26 March 2024
  • ...or interchange layouts, bypasses and pertinent topographic features. The preliminary plan develops and conveys basic design criteria, basic geometric details an |'''[[:Category:235 Preliminary Plans|Preliminary Plans Approved]]''' - Date preliminary plans are completed. All changes resulting from the Design Hearing and VE
    0 members (0 subcategories, 0 files) - 16:42, 21 September 2023
  • ...ilable in [[:Category:235 Preliminary Plans#235.2.3 Project Agreements|EPG 235.2.3 Project Agreements]]. These agreements must be in place by the Plans, S
    1 member (0 subcategories, 0 files) - 14:50, 6 April 2021
  • Preliminary plans and specifications must be submitted and approved prior to MoDOT ente ...s. [[:Category:235 Preliminary Plans|EPG 235 Preliminary Plans]] addresses preliminary design.
    56 KB (8,709 words) - 13:18, 18 February 2022
  • * [[media:124.2.4 Check List for Preliminary Plans.docx|Preliminary Plans Check List]] * [[media:Preliminary_Plans_Proposal_Review.dotx|Preliminary Plans Proposal Review]]
    0 members (0 subcategories, 0 files) - 08:14, 6 May 2024
  • ...and are accurate. The coordinate geometry database should not include any preliminary alignments used in the development of the plans. ...bility review by the project team during [[:Category:235 Preliminary Plans#235.5 Field Checks|plan development]]. Pre-bid conferences are required for al
    43 KB (6,742 words) - 08:21, 6 May 2024
  • ...8 Conceptual Studies|conceptual study]], [[:Category:235 Preliminary Plans|preliminary plan]], right of way certification, or plans, specifications, and estimate
    21 KB (3,103 words) - 12:36, 18 September 2023
  • ...vement may only require the preparation of a combined conceptual study and preliminary plans. ...] (RES) requesting project screening and early constraint identification. Preliminary screening may have been completed in order to obtain a CE classification fr
    0 members (0 subcategories, 0 files) - 09:36, 2 February 2024
  • ...trol set-ups shall be shown for each work activity within the work zone. A preliminary field check with district construction and traffic is recommended to ensure |60 to 70||235|| 840|| 60<sup>7</sup>|| 120<sup>7</sup>
    44 KB (6,776 words) - 10:56, 22 October 2021
  • ...place and not used. Examples are shown in [[media:235 Sample Preliminary Plans.pdf|Sample Plans]]. Plans for all projects should be prepared to reuse mate ...and noted as "No Clearing" or "N. C." (see [[media:235 Sample Preliminary Plans.pdf|Sample Plans]]). This area should provide sufficient clearance for equi
    0 members (0 subcategories, 0 files) - 13:00, 10 May 2022
  • ...ilable in [[:Category:235 Preliminary Plans#235.2.3 Project Agreements|EPG 235.2.3 Project Agreements]]. All agreements are reviewed by the Chief Counsel' ...align="center"|147||align="center"|176||align="center"|205||align="center"|235||align="center"|264||align="center"|293||align="center"|323||align="center"
    302 KB (45,956 words) - 10:51, 12 April 2024
  • :In some instances, for example, when an "FHA 235" loan is involved, a part of the relocatees' mortgage interest payment will '''Stage #1: MoDOT/FHWA Preliminary Approval of District Functional Replacement Request'''
    713 KB (112,088 words) - 11:51, 9 August 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)