Search results

Jump to navigation Jump to search

Page title matches

Page text matches

  • ...equirements for Bituminous Construction|constructed]], and [[:Category:470 Bituminous Asphalt Maintenance|maintained]] to provide adequate support for loads impo ...this mix type can be found in [[:Category:402 Bituminous Surface Leveling|Bituminous Surface Leveling]].
    0 members (0 subcategories, 0 files) - 14:58, 18 August 2020
  • ==404.1 Construction Inspection for Sec 404== ===404.1.1 Description (Sec 404.1)===
    0 members (0 subcategories, 0 files) - 07:55, 4 June 2021
  • ===401.1.1 Plant Mix Bituminous Base (PMBB) Course=== Use of PMBB courses should be limited to bituminous bases beneath Plant Mix Bituminous Pavement (PMBP) surface mixtures on full depth light duty pavements, as bas
    0 members (0 subcategories, 0 files) - 09:24, 19 April 2023
  • ...ction sheets for the project. Minimum thicknesses are 1 in. for Plant Mix Bituminous Surface mixtures, 1 1/2 in. for BP-2 mixtures and 2 in. for BP-1 mixtures. ...for Contract Leveling Course Projects table below is a guide for selecting bituminous mixtures for contract leveling course projects. If the district elects to u
    0 members (0 subcategories, 0 files) - 14:30, 20 April 2023
  • ...inspector’s primary responsibility is to assure the acceptable quality of bituminous ...n of the plant. [[:Category:404 Bituminous Mixing Plants|Bituminous Mixing Plants]] guidance goes into more detail about plant equipment.
    54 KB (8,962 words) - 11:00, 8 December 2021
  • ...e|Aggregate for Asphaltic Concrete]], [[:category:1015 Bituminous Material|Bituminous Material]] and [[:Category:1071 Asphalt Release Agents, Fiber Additives and ...f 20 seconds and the wet mixing time shall be a minimum of 35 seconds. The mixing times and/or temperatures should be adjusted if a uniform mix is not produc
    0 members (0 subcategories, 0 files) - 13:30, 16 June 2023