Difference between revisions of "133.3 Snow and Ice Control Personnel"
m (article construction) |
m (link to Snow Academy) |
||
Line 13: | Line 13: | ||
MoDOT personnel and emergency employees shall be trained before being allowed to work on their own. The following shall constitute the minimum amount of training. The training shall be conducted in two parts. The first part shall be held before bad weather is anticipated and consists of a review of our snow and ice removal policy and procedures and training on the operation of our snow and ice removal equipment. For the less experienced employees and emergency employees, the second part of the training is to be conducted during the first winter storm and should be at least 8 hours in length. During the first 4 hours, the trainee shall ride with an experienced employee observing proper operating techniques. During the second 4 hours of the shift, the trainee shall operate the equipment with the experienced operator riding along as the observer. | MoDOT personnel and emergency employees shall be trained before being allowed to work on their own. The following shall constitute the minimum amount of training. The training shall be conducted in two parts. The first part shall be held before bad weather is anticipated and consists of a review of our snow and ice removal policy and procedures and training on the operation of our snow and ice removal equipment. For the less experienced employees and emergency employees, the second part of the training is to be conducted during the first winter storm and should be at least 8 hours in length. During the first 4 hours, the trainee shall ride with an experienced employee observing proper operating techniques. During the second 4 hours of the shift, the trainee shall operate the equipment with the experienced operator riding along as the observer. | ||
Equipment training shall include but not be limited to truck, plow, spreader and loader. All necessary employment forms must be completed. | Equipment training shall include but not be limited to truck, plow, spreader and loader. All necessary employment forms must be completed. | ||
− | + | {|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="210px" align="right" | |
+ | |- | ||
+ | |'''Additional Information''' | ||
+ | |- | ||
+ | |[http://wwwi/intranet/hr/hred/documents/MoDOTSnowAcademyparticipantbook2009.pdf MoDOT Snow Academy Official Guide, Participant's Manual] | ||
+ | |} | ||
:Reason for policy: To ensure personnel are ready for snow and ice control work. | :Reason for policy: To ensure personnel are ready for snow and ice control work. | ||
Revision as of 08:46, 28 August 2009
Contents
133.3.1 Personnel from other Functional Units
Districts may use any safety sensitive personnel designated by the district engineer in emergency situations and as indicated by the particular emergency. A commercial drivers license (CDL) is required for snow and ice control work.
- Reason for policy: To ensure MoDOT has sufficient trained personnel to work on snow and ice removal.
- Effective Date: 6/1/99
- Revision Dates: 6/17/03
133.3.2 Snow and Ice Operations Training
MoDOT personnel and emergency employees shall be trained before being allowed to work on their own. The following shall constitute the minimum amount of training. The training shall be conducted in two parts. The first part shall be held before bad weather is anticipated and consists of a review of our snow and ice removal policy and procedures and training on the operation of our snow and ice removal equipment. For the less experienced employees and emergency employees, the second part of the training is to be conducted during the first winter storm and should be at least 8 hours in length. During the first 4 hours, the trainee shall ride with an experienced employee observing proper operating techniques. During the second 4 hours of the shift, the trainee shall operate the equipment with the experienced operator riding along as the observer. Equipment training shall include but not be limited to truck, plow, spreader and loader. All necessary employment forms must be completed.
Additional Information |
MoDOT Snow Academy Official Guide, Participant's Manual |
- Reason for policy: To ensure personnel are ready for snow and ice control work.
- Effective Date: 6/1/99
- Revision Dates: 6/17/03
133.3.3 Emergency Equipment Operators
MoDOT has authorized the use of emergency help during snow and ice storms. The decision to use emergency help is at the discretion of the district. Hiring of emergency snow removal help and drug and alcohol testing shall be in accordance with the Personnel Policy Manual. A CDL is required for snow and ice control work.
- Reasons for policy: To augment existing staff and to have efficient removal of ice and snow.
- Effective Date: 6/1/99
- Revision Dates: 6/17/03
133.3.4 Working Hours for Snow and Ice Control
Refer to Personnel Policy Manual, Policy Number 3000, Working Hours and Overtime.
- Effective Date: 6/1/99
- Revision Dates: 6/17/03
133.3.5 Shifts for Snow and Ice Control
Refer to Personnel Policy Manual, Policy Number 3000, Working Hours and Overtime.
- Reasons for policy: Shifts are used to establish set work times for employees, to determine overtime situations as well as to establish reimbursement for meals.
- Effective Date: 6/1/99
- Revision Dates: 6/17/03
133.3.6 On Call for Snow and Ice Control
Being on call shall require each individual employee to notify his or her supervisor of a phone number where the employee can be reached.
- Reasons for policy: 29 CFR 785.17 (Federal Regulations), hours to be worked, District Engineer's letter of October 7, 1991 (seasonal reminders) and to ensure the availability of personnel.
- Effective Date: 6/1/99
- Revision Dates: 6/17/03
133.3.7 Reimbursement for Meals
Refer to Financial Policy & Procedure Manual, Policy Number 04.02.01, Expense Reports.
- Reason for policy: To establish uniform procedures for meal reimbursement.
- Effective Date: 6/1/99
- Revision Dates: 10/14/05