Difference between revisions of "Category:135 Public Relations for Construction Activities"

From Engineering_Policy_Guide
Jump to navigation Jump to search
(info from GCM)
 
m (Moved info to other articles, per CM)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
A number of relations must be recognized and accommodated in construction activities.  [[135.1 Guidelines for Good Contractor Relationships |Good relationships with contractors]] must be maintained, as are [[135.2 Public Contacts|public contacts]] such as with residents along the highway.  Harmonious working [[135.3 Inter-Department Relations|relations among all MoDOT employees]] are very important.
+
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="240px" align="center"
 
+
|-
The contracts for highway construction projects require [[135.4 Required Notices and Posters|notices and posters to be conspicuously displayed]] on the project where employees regularly congregate in preparation for the day's work. The number of locations will depend on the contractor's operations.  Prime contractors and subcontractor are also required to submit certain [[135.5 Labor Compliance|statements of compliance]].
+
|'''This article has moved'''
 
+
|-
All federal-aid contracts contain specific requirements related to [[135.6 Equal Employment Opportunity| equal opportunities in employment]] for all persons or contain requirements of a Hometown Plan with the same objectives. These requirements are as much a contractual obligation as any other part of the standard specifications.
+
|EPG 135 Public Relations for Construction Activities has been moved to various other articles. The content was not changed, only information's location.
 +
|}

Latest revision as of 08:54, 9 August 2010

This article has moved
EPG 135 Public Relations for Construction Activities has been moved to various other articles. The content was not changed, only information's location.