Difference between revisions of "Category:616 Temporary Traffic Control"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per Traffic, Fig. 616.13 clarified)
(Per Traffic, some figures updated to reflect the new work zone speed limit policy. More to be updated.)
Line 28: Line 28:
 
|colspan="4"|'''Work Zone Figures'''
 
|colspan="4"|'''Work Zone Figures'''
 
|-
 
|-
|[[media:616 Sign and Device Legend, sep 22 09.pdf|Sign and Device Legend]]||[[media:616.0.1 Truck and Equipment Crossing.pdf|temporary truck crossing]]||[[media:616.0.2 Lane Closure.pdf|lane closure]]||[[media:616.0.3 Temporary Road Closure.pdf|temporary road closure]]
+
|[[media:616 Sign and Device Legend, sep 22 09.pdf|Sign and Device Legend]]||[[media:616.0.1 Truck and Equipment Crossing.pdf|temporary truck crossing]]||[[media:616.0.2 Lane Closure.pdf|lane closure]]||[[media:616.0.3 Temporary Road Closure Feb 2011.pdf|temporary road closure]]
 
|-
 
|-
 
||[[media:616.0.4 Shoulder Work ja 2009.pdf|shoulder work]]|||[[media:616.0.5 Lane Restriction.pdf|lane restriction]]||[[media:616.0.6 Public Road Crossing Another Road Under Construction.pdf|public road crossing another road under construction]]||[[media:616.0.7 Lane Widening or Addition.pdf|lane widening or addition]]
 
||[[media:616.0.4 Shoulder Work ja 2009.pdf|shoulder work]]|||[[media:616.0.5 Lane Restriction.pdf|lane restriction]]||[[media:616.0.6 Public Road Crossing Another Road Under Construction.pdf|public road crossing another road under construction]]||[[media:616.0.7 Lane Widening or Addition.pdf|lane widening or addition]]
 
|-
 
|-
|[[media:616.0.8 Lane Shift.pdf|lane shift]]||[[media:616.0.9 Standard Temporary.pdf|Standard Temporary Connection for Transition from Single to Dual Lane]]||[[media:616.0.10 Moving Operation on Highway Open to Traffic.pdf|moving operations on highway open to traffic]]||[[media:616.0.11 Temporary Connection at Terminus of Divided Lane Facilities.pdf|temporary connection at terminus of divided lane facilities]]
+
|[[media:616.0.8 Lane Shift Feb 2011.pdf|lane shift]]||[[media:616.0.9 Standard Temporary.pdf|Standard Temporary Connection for Transition from Single to Dual Lane]]||[[media:616.0.10 Moving Operation on Highway Open to Traffic.pdf|moving operations on highway open to traffic]]||[[media:616.0.11 Temporary Connection at Terminus of Divided Lane Facilities Feb 2011.pdf|temporary connection at terminus of divided lane facilities]]
 
|-
 
|-
||[[media:616 1.1 Traffic Control Work Zone.pdf|Traffic Control Work Zone]]||[[media:616.1.2 Sign Spacing Device Spacing.pdf|Sign Spacing Device Spacing]]||[[media:616.1.3 Intermediate Lane Closure.pdf|Intermediate Lane Closure]]||[[media:616.1.4 Begin and End of Project 0909.pdf|Beginning and End of Project]]
+
||[[media:616 1.1 Traffic Control Work Zone.pdf|Traffic Control Work Zone]]||[[media:616.1.2 Sign Spacing Device Spacing Feb 2011.pdf|Sign Spacing Device Spacing]]||[[media:616.1.3 Intermediate Lane Closure.pdf|Intermediate Lane Closure]]||[[media:616.1.4 Begin and End of Project 0909.pdf|Beginning and End of Project]]
 
|-
 
|-
|[[media:Figure 616.2.1.2 Side Road Tapers.pdf|Side Road Tapers]]||[[media:616.2.1 Road Closed Beyond mar 10.pdf|a typical detour]]||[[media:616.2.2 Two-lane Undivided Highway.pdf|other channelizing devices]]||[[media:616.2.3 Work Zone Fine Sign.pdf|WORK ZONE FINE signing sequence]]
+
|[[media:Figure 616.2.1.2 Side Road Tapers.pdf|Side Road Tapers]]||[[media:616.2.1 Road Closed Beyond mar 10.pdf|a typical detour]]||[[media:616.2.2 Two-lane Undivided Highway Feb 2011.pdf|other channelizing devices]]||[[media:616.2.3 Work Zone Fine Sign.pdf|WORK ZONE FINE signing sequence]]
 
|-
 
|-
 
|[[media:616.2.4 Signs in NarrowMedians.pdf|guidance for signs in narrow medians]]||[[media:616.2.6 One-Lane Two-way Operations b.pdf|One-Lane Two-Way Operation]]||[[media:616.13 Crossover On Divided Oct 2010.pdf|Crossovers on Divided Highways]]||[[media:238.4 Documentation Record Form C-258.doc|documentation record (Form C-258)]]
 
|[[media:616.2.4 Signs in NarrowMedians.pdf|guidance for signs in narrow medians]]||[[media:616.2.6 One-Lane Two-way Operations b.pdf|One-Lane Two-Way Operation]]||[[media:616.13 Crossover On Divided Oct 2010.pdf|Crossovers on Divided Highways]]||[[media:238.4 Documentation Record Form C-258.doc|documentation record (Form C-258)]]
 
|}
 
|}

Revision as of 07:56, 1 February 2011

616 TEMPORARY TRAFFIC CONTROL.jpg


Attention to the safety of travelers is especially important in work zones.

The workspace is the area closed to traffic and set aside for workers, equipment and material. Work zone signing items such as regulatory signs and Type III Movable Barricades and other work zone items such as Changeable Message Signs, flashing arrow panels, channelizing devices, lighting devices and signals are specially designed to minimize risk to workers and travelers. Pavement edge treatment is frequently included in work zones as are practices such as crossovers, temporary connections and detours.

The work zone duration and location of work are discussed in this article. There are many aspects to be considered when inspecting construction quality and this article provides construction inspection guidelines.

Temporary traffic control devices warn motorists of hazards, advise the proper path through the work area, delineate areas where travelers may not operate and separate them from workers and opposing traffic. Whenever worn or damaged devices appear in a work zone, the general quality of the work zone deteriorates. To avoid this, MoDOT has provided quality standards for temporary traffic control devices.

To provide uniform flagging and to train employees how to protect themselves, co-workers and travelers, MoDOT requires flagger training.

Road workers look up to see non-motorized traffic

Every day MoDOT has many work zones on Missouri's highways. MoDOT is committed to providing safe and efficient movement of both motorized and non-motorized traffic through or around temporary traffic control work zones and providing protection for workers and equipment located within these work zones. To better educate technicians and those designing and managing temporary traffic control work zones, Work Zone Technician Training, Advanced Work Zone Training, MoDOT Work Zone Guidelines and Work Zone User Training is available.

Work Zone Customer Survey
Traffic has developed the Work Zone Customer Survey to take advantage of travelers viewing MoDOT work zones. The Work Zone Customer Survey has been revised so that reviewing work zones is even easier. You can keep our work zones safe and efficient by submitting your information directly from the survey's website location or by printing, filling out and mailing the report card.

This article also provides law enforcement services, traffic control for non-motorized traffic and transit considerations.

Traffic Control for Field Operations, contains information on temporary traffic control measures.

Work Zone Figures
Sign and Device Legend temporary truck crossing lane closure temporary road closure
shoulder work lane restriction public road crossing another road under construction lane widening or addition
lane shift Standard Temporary Connection for Transition from Single to Dual Lane moving operations on highway open to traffic temporary connection at terminus of divided lane facilities
Traffic Control Work Zone Sign Spacing Device Spacing Intermediate Lane Closure Beginning and End of Project
Side Road Tapers a typical detour other channelizing devices WORK ZONE FINE signing sequence
guidance for signs in narrow medians One-Lane Two-Way Operation Crossovers on Divided Highways documentation record (Form C-258)