Difference between revisions of "106.7 Unacceptable Material"
Jump to navigation
Jump to search
(Per CM, for greater clarity,old EPG 106.7 (4526 hits) was moved to EPG 106.3 to align the EPG with Sec 106.7.) |
m (updated link) |
||
Line 1: | Line 1: | ||
− | [http://www.modot. | + | [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 106.7] has information regarding what material shall be deemed unacceptable and the appropriate action to be taken when unacceptable material arrives at the job site. |
[[category: 106 Control of Material|106.07]] | [[category: 106 Control of Material|106.07]] |
Latest revision as of 11:48, 8 June 2016
Sec 106.7 has information regarding what material shall be deemed unacceptable and the appropriate action to be taken when unacceptable material arrives at the job site.