Difference between revisions of "153.19 Multimodal"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per CCO and Brandi Baldwin, added CCO footnote)
m (Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements.)
Line 1: Line 1:
 
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 
|+  
 
|+  
! style="background:#BEBEBE" ROWSPAN="2"|Available Multimodal Boilerplate Agreements!! style="background:#BEBEBE" ROWSPAN="2"|What<font color="BEBEBE">_</font color="BEBEBE">triggers<font color="BEBEBE">_</font color="BEBEBE">the<font color="BEBEBE">_</font color="BEBEBE">use of this agreement? When is it used?!! style="background:#BEBEBE" ROWSPAN="2"|Who are the drafters?!!style="background:#BEBEBE" ROWSPAN="2"|Who needs to review the document prior to execution?<sup>1</sup>!!style="background:#BEBEBE" colspan="3"| Who signs for MoDOT?<sup>2</sup> !!style="background:#BEBEBE" ROWSPAN="2" width="80"|Is acknowledge-<br/>ment by a notary public required?
+
! style="background:#BEBEBE" ROWSPAN="2"|Available Multimodal Boilerplate Agreements<sup>1</sup>!! style="background:#BEBEBE" ROWSPAN="2"|What<font color="BEBEBE">_</font color="BEBEBE">triggers<font color="BEBEBE">_</font color="BEBEBE">the<font color="BEBEBE">_</font color="BEBEBE">use of this agreement? When is it used?!! style="background:#BEBEBE" ROWSPAN="2"|Who are the drafters?!!style="background:#BEBEBE" ROWSPAN="2"|Who needs to review the document prior to execution?<sup>2</sup>!!style="background:#BEBEBE" colspan="3"| Who signs for MoDOT?<sup>3</sup> !!style="background:#BEBEBE" ROWSPAN="2" width="80"|Is acknowledge-<br/>ment by a notary public required?
 
|-
 
|-
 
!style="background:#BEBEBE"| Executing Signature !!style="background:#BEBEBE"|Approval as to Form!!style="background:#BEBEBE"| Attestation Signature
 
!style="background:#BEBEBE"| Executing Signature !!style="background:#BEBEBE"|Approval as to Form!!style="background:#BEBEBE"| Attestation Signature
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC01_Airport_Aid_for_Capital_Improvement_(State).doc AC01_<br/>Airport_Aid_<br/>for_Capital_<br/>Improvement_(State)]|| Used to provide state grant funds for eligible airport projects.  A fully executed agreement between the Airport Sponsor and Consultant or a Recommendation to Award from the Airport Sponsor triggers its use. ||Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No
+
|AC01_<br/>Airport_Aid_<br/>for_Capital_<br/>Improvement_(State)|| Used to provide state grant funds for eligible airport projects.  A fully executed agreement between the Airport Sponsor and Consultant or a Recommendation to Award from the Airport Sponsor triggers its use. ||Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC01A_Airport_Aid_for_Capital_Improvement_(Agency_Agreement).doc AC01A_<br/>Airport_Aid_for_<br/>Capital_Improvement<br/>(Agency_Agreement)]|| Used to provide state grant funds for eligible airport projects when Airport Sponsor has requested Missouri Highways and Transportation Commission act as its agent for consultant selection.  A grant application from the Airport Sponsor and Aviation Section approval of agency relationship trigger its use. || Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No
+
|AC01A_<br/>Airport_Aid_for_<br/>Capital_Improvement<br/>(Agency_Agreement)|| Used to provide state grant funds for eligible airport projects when Airport Sponsor has requested Missouri Highways and Transportation Commission act as its agent for consultant selection.  A grant application from the Airport Sponsor and Aviation Section approval of agency relationship trigger its use. || Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC02_Airport_Aid_for_Air_Service_Promotion.doc AC02_<br/>Airport_Aid_for_<br/>Air_Service_Promotion]|| Used when deposits in the Aviation Trust Fund exceed $4.5 million and air service grants are to be issued.  Notification of air service grant award to Airport Sponsor triggers use of the agreement.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office ||Commission Secretary's Office|| No
+
|AC02_<br/>Airport_Aid_for_<br/>Air_Service_Promotion|| Used when deposits in the Aviation Trust Fund exceed $4.5 million and air service grants are to be issued.  Notification of air service grant award to Airport Sponsor triggers use of the agreement.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office ||Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC05_Supplemental_Airport_Aid_Agreement.doc AC05_<br/>Supplemental_Airport<br/>_Aid_Agreement]|| Used when additional state funds are needed for a state project.  Used when a change order is approved or final costs are submitted.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No
+
|AC05_<br/>Supplemental_Airport<br/>_Aid_Agreement|| Used when additional state funds are needed for a state project.  Used when a change order is approved or final costs are submitted.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC10A_Amendment_to_State_Block_Grant_Agreement.doc AC10_<br/>State_Block_<br/>Grant_Agreement]|| Used to provide federal grant funds for eligible airport projects.  A fully executed agreement between the Airport Sponsor and Consultant or a Recommendation to Award from the Airport Sponsor triggers its use. ||Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No
+
|AC10_<br/>State_Block_<br/>Grant_Agreement|| Used to provide federal grant funds for eligible airport projects.  A fully executed agreement between the Airport Sponsor and Consultant or a Recommendation to Award from the Airport Sponsor triggers its use. ||Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC10A_Amendment_to_State_Block_Grant_Agreement.doc AC10A_<br/>Amendment_to_State_<br/>Block_Grant_Agreement]|| Used when additional federal funds are needed for a federal project.  Used when a change order is approved or when final costs are submitted.  Frequently used to include construction and construction inspection costs for a project.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office ||No
+
|AC10A_<br/>Amendment_to_State_<br/>Block_Grant_Agreement|| Used when additional federal funds are needed for a federal project.  Used when a change order is approved or when final costs are submitted.  Frequently used to include construction and construction inspection costs for a project.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC12_Agency_Agreement.doc AC12_<br/>Agency_Agreement]|| Very rarely used.  Allows Missouri Highways and Transportation Commission to act as an agent for an Airport Sponsor for a federal project. Grant application would trigger use of agreement. ||Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No
+
|AC12_<br/>Agency_Agreement|| Very rarely used.  Allows Missouri Highways and Transportation Commission to act as an agent for an Airport Sponsor for a federal project. Grant application would trigger use of agreement. ||Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC13_Turf_Runway_Marking_Agreement.doc AC13_<br/>Turf_Runway_<br/>Marking_Agreement]|| Very rarely used.  Outlines process for installing turf runway markers at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles.  Grant application would trigger use of agreement. ||Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No
+
|AC13_<br/>Turf_Runway_<br/>Marking_Agreement|| Very rarely used.  Outlines process for installing turf runway markers at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles.  Grant application would trigger use of agreement. ||Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC14_Reflective_Airfield_Signage_Agreement.doc AC14_<br/>Reflective_Airfield<br/>_Signage_Agreement]|| Very rarely used.  Outlines process for installing reflective airfield signage at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles.  Grant application would trigger use of agreement.  || Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office ||Commission Secretary's Office ||No
+
|AC14_<br/>Reflective_Airfield<br/>_Signage_Agreement|| Very rarely used.  Outlines process for installing reflective airfield signage at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles.  Grant application would trigger use of agreement.  || Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office ||Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC15%20_Segmented_Circle_Marking_Agreement.doc AC15 _<br/>Segmented_Circle_<br/>Marking_Agreement]|| Very rarely used.  Outlines process for installing segmented circle markers at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles.  Grant application would trigger use of agreement.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office ||No
+
|AC15 _<br/>Segmented_Circle_<br/>Marking_Agreement|| Very rarely used.  Outlines process for installing segmented circle markers at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles.  Grant application would trigger use of agreement.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC17_Aviation_Project_Consultant_Agreement_(Federal_Assistance).doc AC17_<br/>Aviation_Project_<br/>Consultant_Agreement_<br/>(Federal_Assistance)]|| Used when Aviation Section contracts with a consultant to complete a study/project using federal funding.  Would be executed after receipt of a federal grant for the project.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office ||No
+
|AC17_<br/>Aviation_Project_<br/>Consultant_Agreement_<br/>(Federal_Assistance)|| Used when Aviation Section contracts with a consultant to complete a study/project using federal funding.  Would be executed after receipt of a federal grant for the project.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC18_Agreement_for_Aviation_Easement.doc AC18_<br/>Agreement_for_<br/>Aviation_Easement]|| Very rarely used.  Outlines process when an aviation easement is granted to an Airport.  Would be executed after agreement was reached upon easement acquisition.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer, but only if Missouri Highways and Transportation Commission was granting the easement ||Chief Counsel's Office ||Commission Secretary's Office|| Yes
+
|AC18_<br/>Agreement_for_<br/>Aviation_Easement|| Very rarely used.  Outlines process when an aviation easement is granted to an Airport.  Would be executed after agreement was reached upon easement acquisition.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer, but only if Missouri Highways and Transportation Commission was granting the easement ||Chief Counsel's Office ||Commission Secretary's Office|| Yes
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC19_Certificate_of_Title.doc AC19_<br/>Certificate_of_Title]|| This is not a contract; it is a certificate the FAA requires the Airport Sponsor to submit when land is purchased prior to reimbursement.  Purchase of property would trigger the preparation of the certificate.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| N/A (no MoDOT signature required)|| - || - || No
+
|AC19_<br/>Certificate_of_Title|| This is not a contract; it is a certificate the FAA requires the Airport Sponsor to submit when land is purchased prior to reimbursement.  Purchase of property would trigger the preparation of the certificate.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| N/A (no MoDOT signature required)|| - || - || No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC20_Taxi_Reflector_Agreement.doc AC20_<br/>Taxi_Reflector<br/>_Agreement]|| Very rarely used.  Outlines process for installing taxiway reflectors at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles.  Grant application would trigger use of agreement. ||Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No
+
|AC20_<br/>Taxi_Reflector<br/>_Agreement|| Very rarely used.  Outlines process for installing taxiway reflectors at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles.  Grant application would trigger use of agreement. ||Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC21_Air_Traffic_Control_Tower_Operating_Assistance_Grant.doc AC21_<br/>Air_Traffic_<br/>Control_Tower_<br/>Operating_Assistance<br/>_Grant]|| Used to provide state funds to assist with operating costs for air traffic control tower with no local match requirement.  We currently have one airport in the state eligible for this grant program (Cape Girardeau).  Grant application would trigger use of agreement.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|AC21_<br/>Air_Traffic_<br/>Control_Tower_<br/>Operating_Assistance<br/>_Grant|| Used to provide state funds to assist with operating costs for air traffic control tower with no local match requirement.  We currently have one airport in the state eligible for this grant program (Cape Girardeau).  Grant application would trigger use of agreement.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC21A_Air_Traffic_%20Control_Tower_Operating_Assistance_Grant_with_Local_Match.doc AC21A_<br/>Air_Traffic_<br/>Control_Tower_<br/>Operating_Assistance<br/>_Grant_with_<br/>Local_Match]|| Used to provide state funds to assist with operating costs for air traffic control tower that includes a local match requirement.  We currently have two airports in the state eligible for this program (Jefferson City and Joplin).  Grant application would trigger use of agreement. ||Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|AC21A_<br/>Air_Traffic_<br/>Control_Tower_<br/>Operating_Assistance<br/>_Grant_with_<br/>Local_Match|| Used to provide state funds to assist with operating costs for air traffic control tower that includes a local match requirement.  We currently have two airports in the state eligible for this program (Jefferson City and Joplin).  Grant application would trigger use of agreement. ||Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC22_Amendment_to_AC21.doc AC22_<br/>Amendment_to_AC21]|| Very rarely used.  Amends prior Air Traffic Control Tower Agreement (AC21).|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office ||No
+
|AC22_<br/>Amendment_to_AC21|| Very rarely used.  Amends prior Air Traffic Control Tower Agreement (AC21).|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC23_Consultant_Services_Agreement-State_Funds_Only.doc AC23_<br/>Consultant_Services<br/>_Agreement-State<br/>_Funds_Only]|| Used when Aviation Section contracts with a consultant to be on call to perform various studies/projects for the Aviation Section using state Aviation Trust Funds.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office ||No
+
|AC23_<br/>Consultant_Services<br/>_Agreement-State<br/>_Funds_Only|| Used when Aviation Section contracts with a consultant to be on call to perform various studies/projects for the Aviation Section using state Aviation Trust Funds.|| Airport Project Technician, Administrator of Aviation|| Chief Counsel's Office, Airport Sponsor ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC23-MOU_-_Memorandum_of_Understanding.doc AC23-MOU_-<br/>_Memorandum_of<br/>_Understanding]|| Used when Aviation Section designates specific study/project for on call consultant to perform for the Aviation Section using state Aviation Trust Funds.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No
+
|AC23-MOU_-<br/>_Memorandum_of<br/>_Understanding|| Used when Aviation Section designates specific study/project for on call consultant to perform for the Aviation Section using state Aviation Trust Funds.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/AVIATION/AC25_Airport_Aid_Agreement_for_Aircraft_Rescue_and_Firefighting_Training_Assistance.doc AC25_<br/>Airport_Aid_<br/>Agreement_for_<br/>Aircraft_Rescue_<br/>and_Firefighting_<br/>Training_Assistance]|| Used when a Part 139 Airport Sponsor utilizes University of Missouri Fire and Rescue Training Institute for firefighting training.  Grant application would trigger use of agreement.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office ||Commission Secretary's Office|| No
+
|AC25_<br/>Airport_Aid_<br/>Agreement_for_<br/>Aircraft_Rescue_<br/>and_Firefighting_<br/>Training_Assistance|| Used when a Part 139 Airport Sponsor utilizes University of Missouri Fire and Rescue Training Institute for firefighting training.  Grant application would trigger use of agreement.|| Airport Project Technician, Administrator of Aviation ||Chief Counsel's Office, Airport Sponsor|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office ||Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/FREIGHT_AND_WATERWAYS/FR01_Freight_Enhancement_Program.doc FR01_<br/>Freight_Enhancement<br/>_Program]|| Awarding of capital funds for freight capital projects|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office|| No
+
|FR01_<br/>Freight_Enhancement<br/>_Program|| Awarding of capital funds for freight capital projects|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/FREIGHT_AND_WATERWAYS/WA01_Port_Aid_Agreement.doc WA01_<br/>Port_Aid_Agreement]|| Awarding of administrative funds to port authorities|| Multimodal Operation Specialist, Administrator of Frieght & Waterways ||Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel ||Missouri Highways and Transportation Commission|| Chief Counsel's Office ||Commission Secretary's Office ||No
+
|WA01_<br/>Port_Aid_Agreement|| Awarding of administrative funds to port authorities|| Multimodal Operation Specialist, Administrator of Frieght & Waterways ||Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel ||Missouri Highways and Transportation Commission|| Chief Counsel's Office ||Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/FREIGHT_AND_WATERWAYS/WA02_Amended_Port_Aid_Agreement.doc WA02_Amended<br/>_Port_Aid_Agreement]|| Change to award amount of administrative funds ||Multimodal Operation Specialist, Administrator of Frieght & Waterways ||Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel ||Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office ||No
+
|WA02_Amended<br/>_Port_Aid_Agreement|| Change to award amount of administrative funds ||Multimodal Operation Specialist, Administrator of Frieght & Waterways ||Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel ||Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/FREIGHT_AND_WATERWAYS/WA03_Port_Aid_Agreement_Capital_Projects.doc WA03_<br/>Port_Aid_<br/>Agreement_<br/>Capital_Projects]|| Awarding of capital funds for port capital projects|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|WA03_<br/>Port_Aid_<br/>Agreement_<br/>Capital_Projects|| Awarding of capital funds for port capital projects|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/FREIGHT_AND_WATERWAYS/WA03A_Amendment_to_WA03.doc WA03A_<br/>Amendment_to_WA03]|| Extension of time for port capital projects|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel ||Missouri Highways and Transportation Commission|| Chief Counsel's Office ||Commission Secretary's Office ||No
+
|WA03A_<br/>Amendment_to_WA03|| Extension of time for port capital projects|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel ||Missouri Highways and Transportation Commission|| Chief Counsel's Office ||Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/FREIGHT_AND_WATERWAYS/WA05_Supplemental_Agreement.doc WA05_<br/>Supplemental_Agreement]|| Used to reditribute unused Port Administration Funds|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office ||No
+
|WA05_<br/>Supplemental_Agreement|| Used to reditribute unused Port Administration Funds|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/FREIGHT_AND_WATERWAYS/WA06_Ferry_Boat_Discretionary_Funds.doc WA06_<br/>Ferry_Boat_<br/>Discretionary_Funds]|| Awarding of federal Ferry Boat Program funds to ferry operators for capital expenses|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|WA06_<br/>Ferry_Boat_<br/>Discretionary_Funds|| Awarding of federal Ferry Boat Program funds to ferry operators for capital expenses|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/FREIGHT_AND_WATERWAYS/WA07_Agreement_for_Ferryboat_Operating_Costs.docx WA07_<br/>Agreement_for_<br/>Ferryboat_<br/>Operating_Costs]|| Awarding of operating funds to ferry operators|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|WA07_<br/>Agreement_for_<br/>Ferryboat_<br/>Operating_Costs|| Awarding of operating funds to ferry operators|| Multimodal Operation Specialist, Administrator of Frieght & Waterways|| Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/RAILROAD/RR09_Supplemental_Agreement_for_Crossing_Improvements_with_KCS.docx RR09_<br/>Supplemental_<br/>Agreement_for_<br/>Crossing_Improvements<br/>_with_KCS]|| Crossing improvement Projects|| RR Project Staff|| RR Project Staff|| Multimodal Director|| - || - || No
+
|RR09_<br/>Supplemental_<br/>Agreement_for_<br/>Crossing_Improvements<br/>_with_KCS|| Crossing improvement Projects|| RR Project Staff|| RR Project Staff|| Multimodal Director|| - || - || No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/RAILROAD/RR09-BNSF_Supplemental_Agreement_for_Signal_or_Surface_Improvements_with_BNSF.docx R09-<br/>BNSF_Supplemental<br/>_Agreement_for_<br/>Signal_or_Surface<br/>_Improvements_with<br/>_BNSF]|| Crossing improvement Projects|| RR Project Staff|| RR Project Staff|| Multimodal Director|| - || - || No
+
|R09-<br/>BNSF_Supplemental<br/>_Agreement_for_<br/>Signal_or_Surface<br/>_Improvements_with<br/>_BNSF|| Crossing improvement Projects|| RR Project Staff|| RR Project Staff|| Multimodal Director|| - || - || No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/RAILROAD/RR09-CP_Supplemental_Agreement_for_Signal_or_Surface_Improvements_with_CP.docx RR09-<br/>CP_Supplemental_<br/>Agreement_for_Signal<br/>_or_Surface_<br/>Improvements_with_CP]|| Crossing improvement Projects ||RR Project Staff|| RR Project Staff|| Multimodal Director || - || - || No
+
|RR09-<br/>CP_Supplemental_<br/>Agreement_for_Signal<br/>_or_Surface_<br/>Improvements_with_CP|| Crossing improvement Projects ||RR Project Staff|| RR Project Staff|| Multimodal Director || - || - || No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/RAILROAD/RR09-UP_Supplemental_Agreement_for_Signal_or_Surface_Improvements_with_UP.docx RR09-<br/>UP_Supplemental_<br/>Agreement_for_Signal<br/>_or_Surface_<br/>Improvements_<br/>with_UP]|| Crossing improvement Projects|| RR Project Staff|| RR Project Staff|| Multimodal Director|| - || - || No
+
|RR09-<br/>UP_Supplemental_<br/>Agreement_for_Signal<br/>_or_Surface_<br/>Improvements_<br/>with_UP|| Crossing improvement Projects|| RR Project Staff|| RR Project Staff|| Multimodal Director|| - || - || No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/RAILROAD/RR20_Maintenance_Agreement_(Burlington_Northern).doc RR20_<br/>Maintenance_Agreement<br/>_(Burlington_Northern)]|| Construction Projects within RR ROW|| RR Project Manager ||RR Project Manager|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|RR20_<br/>Maintenance_Agreement<br/>_(Burlington_Northern)|| Construction Projects within RR ROW|| RR Project Manager ||RR Project Manager|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC01_Elderly_and_Handicapped_Transportation_Assistance_Agreement.doc TC01_<br/>Elderly_and_<br/>Handicapped_Transportation<br/>_Assistance_Agreement]|| Application award of FTA funds ||Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC01_<br/>Elderly_and_<br/>Handicapped_Transportation<br/>_Assistance_Agreement|| Application award of FTA funds ||Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC02_Section_3_Capital_Grant_Agreement_(Real_Property).doc TC02_<br/>Section_3_<br/>Capital_Grant_<br/>Agreement_(Real_Property)]|| Application submittal by 5309 sub-recipient ||Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC02_<br/>Section_3_<br/>Capital_Grant_<br/>Agreement_(Real_Property)|| Application submittal by 5309 sub-recipient ||Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC02A_Section_3_Capital_Grant_Agreement_(Equipment).doc TC02A_<br/>Section_3_<br/>Capital_Grant_<br/>Agreement_(Equipment)]|| Application submittal by 5309 sub-recipient|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC02A_<br/>Section_3_<br/>Capital_Grant_<br/>Agreement_(Equipment)|| Application submittal by 5309 sub-recipient|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC02B_First_Amendment_to_5309_Agreement.doc TC02B_<br/>First_Amendment_<br/>to_5309_Agreement]|| Modification to origina agreement|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office ||Commission Secretary's Office|| No
+
|TC02B_<br/>First_Amendment_<br/>to_5309_Agreement|| Modification to origina agreement|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office ||Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC04_Section_16_Grant_Agreement.doc TC04_<br/>Section_16_<br/>Grant_Agreement]|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC04_<br/>Section_16_<br/>Grant_Agreement|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC05_Nonurbanized_Area_Public_Grant_Agreement.doc TC05_<br/>Nonurbanized_Area_<br/>Public_Grant_Agreement]|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC05_<br/>Nonurbanized_Area_<br/>Public_Grant_Agreement|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC05A_Nonurbanized_Area_Public_Grant_Agreement_(Capital).doc TC05A_<br/>Nonurbanized_Area_<br/>Public_Grant_Agreement<br/>(Capital)]|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC05A_<br/>Nonurbanized_Area_<br/>Public_Grant_Agreement<br/>(Capital)|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC05A1_First_Amendment_to_5311_Operating_Agreement.doc TC05A1_<br/>First_Amendment_<br/>to_5311_Operating<br/>_Agreement]|| Modification to original agreement|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office ||No
+
|TC05A1_<br/>First_Amendment_<br/>to_5311_Operating<br/>_Agreement|| Modification to original agreement|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC05A2_First_Amendment_to_5311_Cap_Agreement.doc TC05A2_<br/>First_Amendment_<br/>to_5311_Cap_Agreement]|| Modification to original agreement|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC05A2_<br/>First_Amendment_<br/>to_5311_Cap_Agreement|| Modification to original agreement|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC05B_Capital_Contract_for_Intercity_Bus.doc TC05B_<br/>Capital_Contract_<br/>for_Intercity_Bus]|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC05B_<br/>Capital_Contract_<br/>for_Intercity_Bus|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC05C_Operating_Contract_for_Intercity_Bus.doc TC05C_<br/>Operating_Contract<br/>_for_Intercity_Bus]|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel Hamblin|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office ||No
+
|TC05C_<br/>Operating_Contract<br/>_for_Intercity_Bus|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel Hamblin|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC05-M_Nonurbanized_Area_Public_Marketing_Assistance_Grant_Agreement.doc TC05-M_<br/>Nonurbanized_Area<br/>_Public_Marketing<br/>_Assistance_Grant<br/>_Agreement]|| Application award of FTA funds || Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office ||Commission Secretary's Office|| No
+
|TC05-M_<br/>Nonurbanized_Area<br/>_Public_Marketing<br/>_Assistance_Grant<br/>_Agreement|| Application award of FTA funds || Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office ||Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC07_Public_Transportation_Planning_Grant_Agreement.doc TC07_<br/>Public_Transportation<br/>_Planning_Grant<br/>_Agreement]|| Application award of FTA funds|| TP Division|| TP Division, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office ||No
+
|TC07_<br/>Public_Transportation<br/>_Planning_Grant<br/>_Agreement|| Application award of FTA funds|| TP Division|| TP Division, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office ||No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC09_Public_Transit_Operating_Assistance_Grant_Agreement.doc TC09_<br/>Public_Transit_<br/>Operating_Assistance<br/>_Grant_Agreement]|| Application award of FTA funds|| TP Division|| TP Division, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC09_<br/>Public_Transit_<br/>Operating_Assistance<br/>_Grant_Agreement|| Application award of FTA funds|| TP Division|| TP Division, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC09A_First_Amendment_to_TC9.doc TC09A_<br/>First_Amendment<br/>_to_TC9]|| Modification to original agreement|| TP Division|| TP Division, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC09A_<br/>First_Amendment<br/>_to_TC9|| Modification to original agreement|| TP Division|| TP Division, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC10_Job_Access_and_Reverse_Commute_Grant_Agreement.doc TC10_<br/>Job_Access_and_<br/>Reverse_Commute_<br/>Grant_Agreement]|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC10_<br/>Job_Access_and_<br/>Reverse_Commute_<br/>Grant_Agreement|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission ||Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC11_Contract_for_Public_Transit_-_Human_Service_Transportation_Coordination_Planning.doc TC11_<br/>Contract_for_<br/>Public_Transit_-<br/>_Human_Service_<br/>Transportation_Coordination<br/>_Planning]|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel ||Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC11_<br/>Contract_for_<br/>Public_Transit_-<br/>_Human_Service_<br/>Transportation_Coordination<br/>_Planning|| Application award of FTA funds|| Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel ||Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|[http://sharepoint/support/CC/CCO%20Contracts/MO_-_Multimodal/TRANSIT/TC12_New_Freedom_Capital_and_Operating_Assistance_Grant_Agreement.doc TC12_<br/>New_Freedom_Capital<br/>_and_Operating_Assistance<br/>_Grant_Agreement]|| Application award of FTA funds || Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
+
|TC12_<br/>New_Freedom_Capital<br/>_and_Operating_Assistance<br/>_Grant_Agreement|| Application award of FTA funds || Multimodal Operation Specialist, Administrator of Transit|| Multimodal Operation Specialist, Administrator of Transit, Counsel|| Missouri Highways and Transportation Commission|| Chief Counsel's Office|| Commission Secretary's Office|| No
 
|-
 
|-
|colspan="8" align="left"|'''1''' Any agreement that is changed from its original form must be reviewed by CCO. Please refer to [[:Category:153 Agreements and Contracts#153.1.4 Step 3, Chief Counsel’s Office (CCO) Review|EPG 153.1.4 Step 3, Chief Counsel’s Office (CCO) Review]] and throughout EPG 153 for guidance on when to contact CCO. When in doubt, do not hesitate to contact CCO for guidance.  
+
|colspan="8" align="left"|'''1''' Use the eAgreements site to find and begin drafting the corresponding boilerplate agreement.  
 
|-
 
|-
|colspan="8" align="left"|'''2''' Can also be found in the Execution of Documents Policy
+
|colspan="8" align="left"|'''2''' Any agreement that is changed from its original form must be reviewed by CCO. Please refer to [[:Category:153 Agreements and Contracts#153.1.4 Step 3, Chief Counsel’s Office (CCO) Review|EPG 153.1.4 Step 3, Chief Counsel’s Office (CCO) Review]] and throughout EPG 153 for guidance on when to contact CCO. When in doubt, do not hesitate to contact CCO for guidance.
 +
|-
 +
|colspan="8" align="left"|'''3''' Can also be found in the Execution of Documents Policy
 
|}
 
|}
  

Revision as of 09:09, 6 December 2016

Available Multimodal Boilerplate Agreements1 What_triggers_the_use of this agreement? When is it used? Who are the drafters? Who needs to review the document prior to execution?2 Who signs for MoDOT?3 Is acknowledge-
ment by a notary public required?
Executing Signature Approval as to Form Attestation Signature
AC01_
Airport_Aid_
for_Capital_
Improvement_(State)
Used to provide state grant funds for eligible airport projects. A fully executed agreement between the Airport Sponsor and Consultant or a Recommendation to Award from the Airport Sponsor triggers its use. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC01A_
Airport_Aid_for_
Capital_Improvement
(Agency_Agreement)
Used to provide state grant funds for eligible airport projects when Airport Sponsor has requested Missouri Highways and Transportation Commission act as its agent for consultant selection. A grant application from the Airport Sponsor and Aviation Section approval of agency relationship trigger its use. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC02_
Airport_Aid_for_
Air_Service_Promotion
Used when deposits in the Aviation Trust Fund exceed $4.5 million and air service grants are to be issued. Notification of air service grant award to Airport Sponsor triggers use of the agreement. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC05_
Supplemental_Airport
_Aid_Agreement
Used when additional state funds are needed for a state project. Used when a change order is approved or final costs are submitted. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC10_
State_Block_
Grant_Agreement
Used to provide federal grant funds for eligible airport projects. A fully executed agreement between the Airport Sponsor and Consultant or a Recommendation to Award from the Airport Sponsor triggers its use. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC10A_
Amendment_to_State_
Block_Grant_Agreement
Used when additional federal funds are needed for a federal project. Used when a change order is approved or when final costs are submitted. Frequently used to include construction and construction inspection costs for a project. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC12_
Agency_Agreement
Very rarely used. Allows Missouri Highways and Transportation Commission to act as an agent for an Airport Sponsor for a federal project. Grant application would trigger use of agreement. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC13_
Turf_Runway_
Marking_Agreement
Very rarely used. Outlines process for installing turf runway markers at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles. Grant application would trigger use of agreement. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC14_
Reflective_Airfield
_Signage_Agreement
Very rarely used. Outlines process for installing reflective airfield signage at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles. Grant application would trigger use of agreement. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC15 _
Segmented_Circle_
Marking_Agreement
Very rarely used. Outlines process for installing segmented circle markers at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles. Grant application would trigger use of agreement. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC17_
Aviation_Project_
Consultant_Agreement_
(Federal_Assistance)
Used when Aviation Section contracts with a consultant to complete a study/project using federal funding. Would be executed after receipt of a federal grant for the project. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC18_
Agreement_for_
Aviation_Easement
Very rarely used. Outlines process when an aviation easement is granted to an Airport. Would be executed after agreement was reached upon easement acquisition. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer, but only if Missouri Highways and Transportation Commission was granting the easement Chief Counsel's Office Commission Secretary's Office Yes
AC19_
Certificate_of_Title
This is not a contract; it is a certificate the FAA requires the Airport Sponsor to submit when land is purchased prior to reimbursement. Purchase of property would trigger the preparation of the certificate. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor N/A (no MoDOT signature required) - - No
AC20_
Taxi_Reflector
_Agreement
Very rarely used. Outlines process for installing taxiway reflectors at an airport and the Airport Sponsor's and Missouri Highways and Transportation Commission's roles. Grant application would trigger use of agreement. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC21_
Air_Traffic_
Control_Tower_
Operating_Assistance
_Grant
Used to provide state funds to assist with operating costs for air traffic control tower with no local match requirement. We currently have one airport in the state eligible for this grant program (Cape Girardeau). Grant application would trigger use of agreement. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC21A_
Air_Traffic_
Control_Tower_
Operating_Assistance
_Grant_with_
Local_Match
Used to provide state funds to assist with operating costs for air traffic control tower that includes a local match requirement. We currently have two airports in the state eligible for this program (Jefferson City and Joplin). Grant application would trigger use of agreement. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC22_
Amendment_to_AC21
Very rarely used. Amends prior Air Traffic Control Tower Agreement (AC21). Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC23_
Consultant_Services
_Agreement-State
_Funds_Only
Used when Aviation Section contracts with a consultant to be on call to perform various studies/projects for the Aviation Section using state Aviation Trust Funds. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC23-MOU_-
_Memorandum_of
_Understanding
Used when Aviation Section designates specific study/project for on call consultant to perform for the Aviation Section using state Aviation Trust Funds. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
AC25_
Airport_Aid_
Agreement_for_
Aircraft_Rescue_
and_Firefighting_
Training_Assistance
Used when a Part 139 Airport Sponsor utilizes University of Missouri Fire and Rescue Training Institute for firefighting training. Grant application would trigger use of agreement. Airport Project Technician, Administrator of Aviation Chief Counsel's Office, Airport Sponsor The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer Chief Counsel's Office Commission Secretary's Office No
FR01_
Freight_Enhancement
_Program
Awarding of capital funds for freight capital projects Multimodal Operation Specialist, Administrator of Frieght & Waterways Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
WA01_
Port_Aid_Agreement
Awarding of administrative funds to port authorities Multimodal Operation Specialist, Administrator of Frieght & Waterways Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
WA02_Amended
_Port_Aid_Agreement
Change to award amount of administrative funds Multimodal Operation Specialist, Administrator of Frieght & Waterways Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
WA03_
Port_Aid_
Agreement_
Capital_Projects
Awarding of capital funds for port capital projects Multimodal Operation Specialist, Administrator of Frieght & Waterways Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
WA03A_
Amendment_to_WA03
Extension of time for port capital projects Multimodal Operation Specialist, Administrator of Frieght & Waterways Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
WA05_
Supplemental_Agreement
Used to reditribute unused Port Administration Funds Multimodal Operation Specialist, Administrator of Frieght & Waterways Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
WA06_
Ferry_Boat_
Discretionary_Funds
Awarding of federal Ferry Boat Program funds to ferry operators for capital expenses Multimodal Operation Specialist, Administrator of Frieght & Waterways Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
WA07_
Agreement_for_
Ferryboat_
Operating_Costs
Awarding of operating funds to ferry operators Multimodal Operation Specialist, Administrator of Frieght & Waterways Multimodal Operation Specialist, Administrator of Frieght & Waterways, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
RR09_
Supplemental_
Agreement_for_
Crossing_Improvements
_with_KCS
Crossing improvement Projects RR Project Staff RR Project Staff Multimodal Director - - No
R09-
BNSF_Supplemental
_Agreement_for_
Signal_or_Surface
_Improvements_with
_BNSF
Crossing improvement Projects RR Project Staff RR Project Staff Multimodal Director - - No
RR09-
CP_Supplemental_
Agreement_for_Signal
_or_Surface_
Improvements_with_CP
Crossing improvement Projects RR Project Staff RR Project Staff Multimodal Director - - No
RR09-
UP_Supplemental_
Agreement_for_Signal
_or_Surface_
Improvements_
with_UP
Crossing improvement Projects RR Project Staff RR Project Staff Multimodal Director - - No
RR20_
Maintenance_Agreement
_(Burlington_Northern)
Construction Projects within RR ROW RR Project Manager RR Project Manager Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC01_
Elderly_and_
Handicapped_Transportation
_Assistance_Agreement
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC02_
Section_3_
Capital_Grant_
Agreement_(Real_Property)
Application submittal by 5309 sub-recipient Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC02A_
Section_3_
Capital_Grant_
Agreement_(Equipment)
Application submittal by 5309 sub-recipient Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC02B_
First_Amendment_
to_5309_Agreement
Modification to origina agreement Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC04_
Section_16_
Grant_Agreement
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC05_
Nonurbanized_Area_
Public_Grant_Agreement
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC05A_
Nonurbanized_Area_
Public_Grant_Agreement
(Capital)
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC05A1_
First_Amendment_
to_5311_Operating
_Agreement
Modification to original agreement Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC05A2_
First_Amendment_
to_5311_Cap_Agreement
Modification to original agreement Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC05B_
Capital_Contract_
for_Intercity_Bus
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC05C_
Operating_Contract
_for_Intercity_Bus
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Hamblin Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC05-M_
Nonurbanized_Area
_Public_Marketing
_Assistance_Grant
_Agreement
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC07_
Public_Transportation
_Planning_Grant
_Agreement
Application award of FTA funds TP Division TP Division, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC09_
Public_Transit_
Operating_Assistance
_Grant_Agreement
Application award of FTA funds TP Division TP Division, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC09A_
First_Amendment
_to_TC9
Modification to original agreement TP Division TP Division, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC10_
Job_Access_and_
Reverse_Commute_
Grant_Agreement
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC11_
Contract_for_
Public_Transit_-
_Human_Service_
Transportation_Coordination
_Planning
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
TC12_
New_Freedom_Capital
_and_Operating_Assistance
_Grant_Agreement
Application award of FTA funds Multimodal Operation Specialist, Administrator of Transit Multimodal Operation Specialist, Administrator of Transit, Counsel Missouri Highways and Transportation Commission Chief Counsel's Office Commission Secretary's Office No
1 Use the eAgreements site to find and begin drafting the corresponding boilerplate agreement.
2 Any agreement that is changed from its original form must be reviewed by CCO. Please refer to EPG 153.1.4 Step 3, Chief Counsel’s Office (CCO) Review and throughout EPG 153 for guidance on when to contact CCO. When in doubt, do not hesitate to contact CCO for guidance.
3 Can also be found in the Execution of Documents Policy