Difference between revisions of "770.1 District Routine Maintenance and Special Crew Responsibilities"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (added photo)
m
 
(2 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
*Repairing bridge decks with concrete ([[771.9 Temporary Bridge Deck Repair|Temporary Deck Repairs]])
 
*Repairing bridge decks with concrete ([[771.9 Temporary Bridge Deck Repair|Temporary Deck Repairs]])
 
*Repairing and sealing deck joints with appropriate material ([[771.10 Bridge Joint Sealing - Hot Pour|Hot Pour]], [[771.11 Bridge Joint Sealing - Silicone|Silicone]], or [[771.12 Bridge Joint Sealing - Polytite|Polytite]])
 
*Repairing and sealing deck joints with appropriate material ([[771.10 Bridge Joint Sealing - Hot Pour|Hot Pour]], [[771.11 Bridge Joint Sealing - Silicone|Silicone]], or [[771.12 Bridge Joint Sealing - Polytite|Polytite]])
*Sealing deck spalls with Pavon ([[771.17 Bridge Deck Total Surface Treatment - In Deck|Bridge Deck Sealing]])
+
*Sealing deck spalls with Pavon ([[771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP)|Bridge Deck Sealing]])
 
*Cleaning and sealing accessible concrete caps ([[771.13 Sealing Abutment and Pier Caps|Sealing Abutment and Pier Caps]])
 
*Cleaning and sealing accessible concrete caps ([[771.13 Sealing Abutment and Pier Caps|Sealing Abutment and Pier Caps]])
 
*Minor painting of bearings or steel piling ([[771.14 Spot Painting of Bearings and Piling|Spot Painting]])
 
*Minor painting of bearings or steel piling ([[771.14 Spot Painting of Bearings and Piling|Spot Painting]])
Line 20: Line 20:
 
*Repair or mudjack slope protection ([[771.1 Mud Jacking Bridge Approach|Mudjacking]]) See also mudjacking in [[:Category:503 Bridge Approach Slabs|Bridge Approach Slabs]]
 
*Repair or mudjack slope protection ([[771.1 Mud Jacking Bridge Approach|Mudjacking]]) See also mudjacking in [[:Category:503 Bridge Approach Slabs|Bridge Approach Slabs]]
 
*Bridge posting and advance warning signs
 
*Bridge posting and advance warning signs
*Linseed oil/mineral spirits treatment ([[771.18 Linseed Oil Treatment to Entire Deck|Linseed Oil Deck Treatment]])
 
 
*Reflective tabs on bridge railings  
 
*Reflective tabs on bridge railings  
 
*Cutting trees, brush or vines around and under bridges ([[:Category:822 Roadside Vegetation Management|Cut & Spray Brush]])
 
*Cutting trees, brush or vines around and under bridges ([[:Category:822 Roadside Vegetation Management|Cut & Spray Brush]])

Latest revision as of 10:04, 10 November 2016

District crews shall be responsible for the following maintenance items: