Difference between revisions of "Category:237 Contract Plans"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (article construction)
m (article construction)
Line 1: Line 1:
 +
{|style="padding: 0.3em; margin-left:2px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="180px" align="left"
 +
|-
 +
|'''Electronic Plans Room'''
 +
The electronic plans room allows anyone to view, print or download highway plans for free. Even the general public has access to project plans by visiting [http://modot.indoxservices.com/ http://modot.indoxservices.com/].
 +
|}
 +
 
[[image:237.jpg|right|325px]]
 
[[image:237.jpg|right|325px]]
 
The [[237.1 Plan Details|contract plans]] include a [[237.2 Title Sheet|title sheet]], a [[237.3 Summary and Tabulation of Quantities|summary and tabulation of quantities]], [[237.4 Plan-Profile Sheets|plan-profile sheets]],  
 
The [[237.1 Plan Details|contract plans]] include a [[237.2 Title Sheet|title sheet]], a [[237.3 Summary and Tabulation of Quantities|summary and tabulation of quantities]], [[237.4 Plan-Profile Sheets|plan-profile sheets]],  

Revision as of 12:48, 11 October 2007

Electronic Plans Room

The electronic plans room allows anyone to view, print or download highway plans for free. Even the general public has access to project plans by visiting http://modot.indoxservices.com/.

237.jpg

The contract plans include a title sheet, a summary and tabulation of quantities, plan-profile sheets, special provisions, estimates and other specialized information. An equipment and materials list may also be necessary. Contract time is set to encourage contractors to diligently prosecute the work in a reasonable fashion while causing the least disruption to traffic.

Guidance for the submission of plans and supporting documents, the distribution and signing and sealing of the plans is also provided in this article. The design electronic data used in the development of the contract plans must be submitted along with all other project documents to Design via the ProjectWise document management system.

In order to preserve the integrity of the bidding process, it is imperative to strictly limit project information communicated to the public. MoDOT requires all bidders have the same information from which to prepare a bid.