Difference between revisions of "614.5 Maintenance of Floodgates"

From Engineering_Policy_Guide
Jump to navigation Jump to search
(moving Maintenance of Floodgates to 614.5 since 616.2 was already used.)
 
m (Per MT, updated articles having links to Maintenance Agreements due to the eAgreements SharePoint site.)
 
Line 1: Line 1:
 
+
Floodgates installed by MoDOT shall be maintained by MoDOT regardless of the reason for the installation. Floodgates installed by others shall be maintained by the installer unless MoDOT has agreed to maintain the flood gate through written agreement. The standard contract form [http://sp/sites/eagreements/SitePages/Home.aspx MT-16 FLOOD GATE AGREEMENT] shall be used when establishing maintenance responsibilities for a floodgate. The agreement template is available in [http://sp/sites/eagreements/SitePages/Home.aspx eAgreements].
Floodgates installed by MoDOT shall be maintained by MoDOT regardless of the reason for the installation. Floodgates installed by others shall be maintained by the installer unless MoDOT has agreed to maintain the flood gate through written agreement. The standard contract form [http://wwwi/intranet/cc/contracts/MT/MT16%20%20Flood%20Gate%20Agreement.doc MT-16 MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION CULVERT FLOOD GATE AGREEMENT] shall be used when establishing maintenance responsibilities for a floodgate.
 
  
  
  
 
[[Category:614 Drainage Fittings (Grate Inlets)]]
 
[[Category:614 Drainage Fittings (Grate Inlets)]]

Latest revision as of 13:15, 3 February 2017

Floodgates installed by MoDOT shall be maintained by MoDOT regardless of the reason for the installation. Floodgates installed by others shall be maintained by the installer unless MoDOT has agreed to maintain the flood gate through written agreement. The standard contract form MT-16 FLOOD GATE AGREEMENT shall be used when establishing maintenance responsibilities for a floodgate. The agreement template is available in eAgreements.