Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 751.1.2.21)
m (EPG 237.14)
Line 43: Line 43:
 
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"  
 
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"  
 
|-
 
|-
|colspan="5" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early March, the numbers of hits are:'''
+
|colspan="5" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-March, the numbers of hits are:'''
 
|-
 
|-
|<font size=2>'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 168487
+
|<font size=2>'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 168722
   ||&nbsp;<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 236063
+
   ||&nbsp;<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 236352
 
|-
 
|-
|<font size = 2>'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 176512     ||&nbsp;<font size = 2>'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 272490
+
|<font size = 2>'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 176688     ||&nbsp;<font size = 2>'''9.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 272948
 
|-
 
|-
|<font size = 2>'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 178907   ||&nbsp;<font size = 2>'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 272583
+
|<font size = 2>'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 179065   ||&nbsp;<font size = 2>'''8.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 273413
 
|-
 
|-
|<font size = 2>'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 179183     ||&nbsp;<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 322699
+
|<font size = 2>'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 179281     ||&nbsp;<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 323602
 
|-
 
|-
|<font size = 2>'''16.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 188549 ||&nbsp;<font size = 2>'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 338562
+
|<font size = 2>'''16.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 188689 ||&nbsp;<font size = 2>'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 339464
 
|-
 
|-
|<font size = 2>'''15.'''    [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 196716   ||&nbsp;<font size = 2>'''5.'''  [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 357441
+
|<font size = 2>'''15.'''    [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 196926   ||&nbsp;<font size = 2>'''5.'''  [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 358356
 
|-
 
|-
|<font size = 2>'''14.'''    [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 201948   ||&nbsp;<font size = 2>'''4.'''  [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 381807
+
|<font size = 2>'''14.'''    [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 202691   ||&nbsp;<font size = 2>'''4.'''  [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 382608
 
|-
 
|-
|<font size = 2>'''13.'''    [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 205365     ||&nbsp;<font size = 2>'''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 388791
+
|<font size = 2>'''13.'''    [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 205790     ||&nbsp;<font size = 2>'''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 388974
 
|-
 
|-
|<font size = 2>'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 216436   ||&nbsp;<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 453984
+
|<font size = 2>'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 216577   ||&nbsp;<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 454471
 
|-
 
|-
|width="130"|<font size = 2>'''11.'''    [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 221373   || width="150"|&nbsp;<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 3074222
+
|width="130"|<font size = 2>'''11.'''    [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 221676   || width="150"|&nbsp;<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 3081269
 
|}
 
|}
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[237.14 Electronic Design Data Delivery|EPG 237.14 Electronic Design Data Delivery]]'''
 +
 +
3/16/18:  EPG 237.14 has been completely rewritten and updated. Please carefully read and note the changes.
 +
 
'''[[751.1 Preliminary Design#For retaining walls supported|EPG 751.1.2.21 Substructure Type]]'''
 
'''[[751.1 Preliminary Design#For retaining walls supported|EPG 751.1.2.21 Substructure Type]]'''
  
Line 163: Line 167:
  
 
12/18/17: A few bridge structure entries in this document have been revised.
 
12/18/17: A few bridge structure entries in this document have been revised.
 
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#To ensure compliance|EPG 110.1 Wage Rates]]'''
 
 
12/15/17: Guidance for QA measures to assure compliance with wage rate reviews was expanded.
 

Revision as of 10:17, 16 March 2018

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
To construct the Perry County Rte. AC Connector Rd., much consideration went into preserving the grotto sculpin’s habitat. On almost 5 acres, MoDOT will use appropriately sized, rock-lined, flat-bottomed ditches, grass swales, sediment basins and silt fences for extra treatment of highway runoff. MoDOT also protected a sinkhole from future development. These water quality improvements are expected to enhance the habitat of this endangered species.
Missouri's first “diverge-about” is at I-49 and 155th St. in Belton. MoDOT’s innovative interchange will handle a larger volume of traffic, enhance the area for anticipated new development, accommodate existing traffic in Belton and Grandview, and has a dedicated shared use path for non-motorized vehicles and pedestrian traffic. (View a video of exiting I-49 South and heading east on 155th toward Grandview.)

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-March, the numbers of hits are:
20. EPG 136 168722  10. EPG 751.5 236352
19. EPG 134 176688  9. EPG 616.23 272948
18. EPG 751.40 179065  8. EPG 600 273413
17. EPG 136.4 179281  7. EPG 100 323602
16. EPG 620.2 188689  6. EPG 700 339464
15. EPG 903 196926  5. EPG 900 358356
14. EPG 200 202691  4. EPG 101 382608
13. EPG 751.50 205790  3. EPG 136.12 388974
12. EPG 136.9 216577  2. EPG 751 454471
11. EPG 616 221676  1. EPG Main Page 3081269

EPG 237.14 Electronic Design Data Delivery

3/16/18: EPG 237.14 has been completely rewritten and updated. Please carefully read and note the changes.

EPG 751.1.2.21 Substructure Type

3/9/18: Guidance for minimum galvanized penetration (elevation) was added for piles for retaining walls supported on piles and bridge end bents on piles with embankments supported by MSE walls.

TMA Light Bar

3/8/18: In EPG 612.1.3 MoDOT Protective Vehicle/TMA Guidelines, the TMA Light Bar is now temporarily optional and not required to be purchased for use. In EPG 616.8 Typical Applications, TA-35 MT and TAs 35a-35d MT were also updated with this information.

Tack Coat Estimate Factors

2/27/18: The tack coat estimate factors were updated in EPG 450 Bituminous Pavement Design.

EPG 146.2 DBE Subcontract

2/22/18: Clarified guidance regarding overruns and underruns as they relate to DBE participation.

DBE Concurrence and Executing Consultant Contracts

2/16/18: Guidance in EPG 134.2.4 MoDOT MOU Execution Process, EPG 134.4 Contract Approval, Execution and Distribution, EPG 134.5.2 Supplemental Agreements and EPG 153.8 Design now directs that DBE Concurrence must be requested prior to executing consultant contracts.

D-15 Material List

2/9/18: In 237.7 Equipment and Materials List, designers are now required to include the D-15 in the Electronic Deliverables.

EPG 616.6.89 Radar Speed Advisory Assembly

2/9/18: Expanded and updated guidance on the placement of the Radar Speed Advisory Assembly.

Revised Galvanized Pile Requirements

2/9/18: In EPG 702 Load-Bearing Piles, EPG 751.1.2 Bridges/Boxes, EPG 751.36 Driven Piles, EPG 751.50 E2, EPG 751.50 G, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A709, Gr 50). 

Pipe Culverts

2/9/18: Guidance has been clarified and completely rewritten to be in accordance with pipe specifications. This includes the new articles EPG 724 Pipe Culverts and EPG 1041 Polypropylene Culvert Pipe and the re-titled EPG 730 Thermoplastic Pipe Culverts. EPG 732 Flared End Sections, EPG 750.7.2 Types, EPG 1028 Corrugated Polyvinyl Chloride Culvert Pipe and EPG 1047 Corrugated Polyethylene Culvert Pipe were also updated. EPG 728 Corrugated Polyvinyl Chloride Culvert Pipe was deleted since there is no longer a Sec 728.

Drainage relative to MSE Walls

2/9/18: Revised guidance in EPG 747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems, EPG 751.1.2.18 Preliminary Cost Estimate, EPG 751.1.2.31 Design Exceptions, EPG 751.1.4.3 MSE Walls, EPG 751.10.3.1 Type, Alignment and Spacing , EPG 751.10.3.3 General Requirements for Location of Slab Drains, EPG 751.24.1.1 Wall Type Selection, EPG 751.24.2 Mechanically Stabilized Earth (MSE) Walls and EPG J1. General better defines where drainage/water can or cannot be discharged relative to the location of MSE walls and provides ways to divert the drainage/water in the design process.

Collars on Precast Concrete Box Culverts

2/9/18: Revisions in EPG 751.8.1.5 Precast Culvert, EPG 751.8.3.2 Steel Reinforcement and EPG 751.50 A2.8 address collars on precast concrete box culverts when cast-in-place box culverts are called for on the project. The revision also revises when/how geotextile fabric is used on precast joints. 

LED Luminaires

2/9/18: Guidance is now provided to allow the use of LED luminaires for roadway lighting in EPG 901.7 Light Source and Intensity, EPG 901.8 System Voltage, EPG 901.9 Layout, EPG 901.11, EPG 901.12 Electrical Components, EPG 901.13, EPG 901.14 Dusk-to-Dawn Lighting Policy, EPG 901.16 Construction Inspection Guidelines for Sec 901.

Request to Subcontract Work (Form C-220)

2/6/18: Guidance for a contractor to fill out Form C-220 was clarified in EPG 108.1.3 Disadvantaged Business Enterprises Subcontracting.

EPG 153.1.3.3 Agreements Written By Other Entities

2/5/18: This new guidance addresses Agreements initiated by other entities that are not initiated in eAgreements. The agreement template is initiated by the other entity, executed by the Commission and then uploaded into eAgreements Record center.

EPG 129.12 Presentation for Location or Design Approval to the Commission

2/2/18: Clarified the requirements for location and design approval, which is required even if an LPA is administering and paying for the improvement.

EPG Other Aspects of Pavement Design, Minor Roads

2/2/18: Clarification about pavement thicknesses/types sometimes not included on typical sections.

EPG 616.6.89 Radar Speed Advisory Assembly

2/2/18: Expanded and updated guidance on the placement of the Radar Speed Advisory Assembly. Also slightly updated Work Zone Questions for the Core Team in EPG 616.14 Work Zone Safety and Mobility Policy.

Clear Zones for 1R and 2R Projects

2/1/18: In EPG 128.2 Preventive Maintenance Projects (1R and 2R) and EPG 231.2 Clear Zones, the guidance regarding clear zones and roadside hardware for 1R and 2R projects was condensed and clarified.

EPG 131.1.4 The Design Exception Process

1/26/18: Design Exceptions are to be stored electronically in eProjects after Central Office Design and/or Bridge divisions have reviewed and approved.

EPG 106.3.2.87, No-Pick-Up Time for Tack Coats

1/18/18: This new TM is now available.

Asphalt Cement Price Index Adjustments

1/18/18: "Guidance for Asphalt Cement Price Index Adjustments" has been updated to include info about contingent item work. The document is located in various articles including EPG 402.1.1 Plan Preparation and EPG 403 Asphaltic Concrete Pavement.

Right of Way Acquisition Authority and Project Funding

1/17/18: To align with current CFR regulations, guidance in EPG 236.3.4.2 Limited Acquisition Authority and Project Funding and EPG 236.3.4.3 Acquisition Authority and Project Funding updated what RW activities can be coded to the PE number prior to receiving FHWA's "A" date approval.

Engineering Factors Report

1/10/18: The latest version of the Engineering Factors Report, providing SFY 2015 to SFY 2017 info, is now presented in EPG 104.7 Estimates.

Fig. 104.7, Cost Estimate Guide for Rural Preliminary Design

12/18/17: A few bridge structure entries in this document have been revised.