Difference between revisions of "Category:237 Contract Plans"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (article construction)
m (article construction)
Line 3: Line 3:
 
[[237.5 Special Provisions|special provisions]], [[237.6 Estimates|estimates]] and other specialized information.  An [[237.7 Equipment and Materials List|equipment and materials list]] may also be necessary.  [[237.8 Contract Time|Contract time]] is set to encourage contractors to diligently prosecute the work in a reasonable fashion while causing the least disruption to traffic.  
 
[[237.5 Special Provisions|special provisions]], [[237.6 Estimates|estimates]] and other specialized information.  An [[237.7 Equipment and Materials List|equipment and materials list]] may also be necessary.  [[237.8 Contract Time|Contract time]] is set to encourage contractors to diligently prosecute the work in a reasonable fashion while causing the least disruption to traffic.  
  
Guidance for the [[237.9 Submission of Plans and Supporting Documents|submission of plans and supporting documents]], the [[237.10 Distribution of Plans|distribution]] and [[237.11 Signing and Sealing|signing and sealing]] of the plans is also provided in this article.
+
Guidance for the [[237.9 Submission of Plans and Supporting Documents|submission of plans and supporting documents]], the [[237.10 Distribution of Plans|distribution]] and [[237.11 Signing and Sealing|signing and sealing]] of the plans is also provided in this article.  The [[237.14 Electronic Design Data for GPS Grading|design electronic data used in the development of the contract plans must be submitted]] along with all other project documents to Design via the ProjectWise document management system.
  
 
In order to preserve the integrity of the bidding process, it is imperative to strictly limit project information [[237.12 Communication with the Public|communicated to the public]].  MoDOT requires all bidders have the same information from which to prepare a bid.
 
In order to preserve the integrity of the bidding process, it is imperative to strictly limit project information [[237.12 Communication with the Public|communicated to the public]].  MoDOT requires all bidders have the same information from which to prepare a bid.

Revision as of 12:47, 28 September 2007

237.jpg

The contract plans include a title sheet, a summary and tabulation of quantities, plan-profile sheets, special provisions, estimates and other specialized information. An equipment and materials list may also be necessary. Contract time is set to encourage contractors to diligently prosecute the work in a reasonable fashion while causing the least disruption to traffic.

Guidance for the submission of plans and supporting documents, the distribution and signing and sealing of the plans is also provided in this article. The design electronic data used in the development of the contract plans must be submitted along with all other project documents to Design via the ProjectWise document management system.

In order to preserve the integrity of the bidding process, it is imperative to strictly limit project information communicated to the public. MoDOT requires all bidders have the same information from which to prepare a bid.