User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:09, 10 October 2018 diff hist +157 m Main Page EPG 771.1
- 09:07, 10 October 2018 diff hist +88 m Category:503 Bridge Approach Slabs →503.6 Maintenance Activities: updated link
- 09:06, 10 October 2018 diff hist +5,068 m 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking) Per BR, re-titled EPG 771.1 Mud Jacking Bridge Approach. The requirement for the formed underseal access hole for the concrete bridge approach slabs has been eliminated. current
- 08:49, 10 October 2018 diff hist +86 N 771.1 Mud Jacking Bridge Approach Smithk moved page 771.1 Mud Jacking Bridge Approach to 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking): Re-titled by Bridge current
- 08:49, 10 October 2018 diff hist 0 m 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking) Smithk moved page 771.1 Mud Jacking Bridge Approach to 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking): Re-titled by Bridge
- 14:15, 9 October 2018 diff hist +9 m 751.1 Preliminary Design →751.1.3.4 Railing Type, Height and Guidelines for Curb Blockouts: Per BR, updated link
- 14:04, 9 October 2018 diff hist +68 m 751.40 LFD Widening and Repair →751.40.8.9.1.4 Slab Cross Section and Section Properties
- 12:34, 9 October 2018 diff hist -41 m 903.6 Warning Signs →903.6.3 Design of Warning Signs (MUTCD Section 2C.03): Per TS, correction of guidance previously copied directly from the MUTCD, but doesn’t reflect our direction. MoDOT reserves yellow green for schools only.
- 10:32, 9 October 2018 diff hist +89 m 236.16 Outdoor Advertising updated numerous links
- 09:51, 9 October 2018 diff hist -127 m 236.17 Junkyards updated numerous links
- 09:26, 9 October 2018 diff hist -1 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel: updated link
- 15:24, 28 September 2018 diff hist 0 File:Form C-239.pdf Smithk uploaded a new version of File:Form C-239.pdf current
- 15:23, 28 September 2018 diff hist 0 File:Form C 236.pdf Smithk uploaded a new version of File:Form C 236.pdf current
- 15:23, 28 September 2018 diff hist 0 File:Form 901.14.pdf Smithk uploaded a new version of File:Form 901.14.pdf current
- 15:21, 28 September 2018 diff hist 0 File:Form 901.14.3.pdf Smithk uploaded a new version of File:Form 901.14.3.pdf current
- 15:20, 28 September 2018 diff hist 0 File:Form 236.8.13.5.pdf Smithk uploaded a new version of File:Form 236.8.13.5.pdf current
- 15:19, 28 September 2018 diff hist 0 File:Form 236.8.12.5(a).pdf Smithk uploaded a new version of File:Form 236.8.12.5(a).pdf current
- 15:19, 28 September 2018 diff hist 0 File:Form 236.8.12.3(b).pdf Smithk uploaded a new version of File:Form 236.8.12.3(b).pdf current
- 15:18, 28 September 2018 diff hist 0 File:Form 236.8.12.3(b)(s).pdf Smithk uploaded a new version of File:Form 236.8.12.3(b)(s).pdf current
- 14:25, 28 September 2018 diff hist -78 m 646.1 Manholes current
- 14:22, 28 September 2018 diff hist -39 m 903.17 Delineation and Object Markers
- 14:20, 28 September 2018 diff hist -39 m 234.4 Single Point Urban Interchanges (SPUIs) →234.4.1.3 Ramp and Preliminary Plan Criteria
- 14:19, 28 September 2018 diff hist -39 m 234.2 Diamond Interchanges
- 14:16, 28 September 2018 diff hist -39 m 234.5 Cloverleaf Interchanges
- 14:14, 28 September 2018 diff hist -39 m 234.3 Directional Interchanges
- 13:56, 28 September 2018 diff hist -39 m 901.10 Preparation of Plans
- 13:55, 28 September 2018 diff hist -109 m 233.2 At-Grade Intersections with Stop and Yield Control
- 13:50, 28 September 2018 diff hist -39 m 606.2 Guard Cable
- 13:38, 28 September 2018 diff hist -36 m 606.1 Guardrail
- 13:29, 28 September 2018 diff hist -38 m Category:350 Design for Bases and Aggregate Surfaces current
- 13:26, 28 September 2018 diff hist -70 m Category:613 Pavement Repair
- 13:03, 28 September 2018 diff hist -117 m Category:240 Maintenance and Emergency Crossovers
- 13:00, 28 September 2018 diff hist -117 m 614.2 Material Inspection for Sec 614
- 12:56, 28 September 2018 diff hist -36 m Category:732 Flared End Sections
- 12:54, 28 September 2018 diff hist -117 m 1020.5 Corrugated Metal Pipe (CMP) Inspection Guide current
- 12:52, 28 September 2018 diff hist -39 m Category:706 Reinforcing Steel for Concrete Structures →706.1 Construction Inspection for Sec 706
- 12:50, 28 September 2018 diff hist -171 m Category:604 Miscellaneous Drainage
- 12:23, 28 September 2018 diff hist -78 m Category:1044 Posts for Markers and Delineators
- 12:21, 28 September 2018 diff hist -39 m Category:1043 Fence Material →1043.2.2 Metal Posts, Brace Rails and Gate Frames
- 12:13, 28 September 2018 diff hist +37 m 751.50 Standard Detailing Notes
- 11:27, 28 September 2018 diff hist -1 m 751.40 LFD Widening and Repair →751.40.8.4.2.5 Development of Standard Hooks in Tension, Ldh (\, F_y = 60 ksi)
- 11:15, 28 September 2018 diff hist 0 m 751.40 LFD Widening and Repair →751.40.8.4.2.5 Development of Standard Hooks in Tension, Ldh (\, F_y = 60 ksi)
- 10:51, 28 September 2018 diff hist -36 m 751.40 LFD Widening and Repair →751.40.4.4 End Treatment Using Thrie Beam Rail
- 10:29, 28 September 2018 diff hist -39 m 751.24 Retaining Walls →751.24.2.3 Details
- 10:21, 28 September 2018 diff hist -78 m 751.24 Retaining Walls →751.24.2.1 Design
- 10:07, 28 September 2018 diff hist -128 m 751.14 Steel Superstructure →751.14.5.9.2 Drip Bar Details
- 10:02, 28 September 2018 diff hist -78 m Category:614 Drainage Fittings (Grate Inlets)
- 09:50, 28 September 2018 diff hist -39 m Category:504 Concrete Approach Pavement current
- 09:48, 28 September 2018 diff hist -36 m Category:645 Mailbox Turnouts and Supports current
- 09:30, 28 September 2018 diff hist -273 m 806.2 Sediment Control Measures