User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:19, 9 August 2010 diff hist 0 N File:236.6 Statewide Fee Appraiser List Aug 9 2010.pdf
- 13:18, 9 August 2010 diff hist -3 m 236.6 Appraisal and Appraisal Review Per RW, updated Roster of Approved Appraisers
- 12:45, 9 August 2010 diff hist +5 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.14 Length of Auxiliary Lanes: minor clarification
- 11:25, 9 August 2010 diff hist 0 m Main Page moved photo
- 09:12, 9 August 2010 diff hist -23 m Category:135 The Section 106 Process updated link
- 09:10, 9 August 2010 diff hist +14 m 136.13 Glossary updated link
- 09:10, 9 August 2010 diff hist +14 m 136.8 Preliminary Design →136.8.3 Preliminary Submittals: updated link
- 09:09, 9 August 2010 diff hist +56 m LPA:136.6 Environmental and Cultural Requirements updated links
- 09:06, 9 August 2010 diff hist +52 m 127.22 Off-Site Borrow, Spoil, and Staging Areas updated links
- 09:05, 9 August 2010 diff hist +14 m 127.16 Wetland and Stream Mitigation →127.16.2 Design: updated link
- 09:04, 9 August 2010 diff hist +14 m 127.23 Negotiated Commitments and Mitigation in the National Environmental Policy Act (NEPA) Process →127.23.2 Project Development and Commitments: updated link
- 09:03, 9 August 2010 diff hist +14 m 127.10 Section 4(f) Public Lands →127.10.2.1.1 Section 4(f) Properties: updated link
- 09:02, 9 August 2010 diff hist +14 m LPA:136.8 Local Public Agency Land Acquisition →236.18.2.2 Pre-Acquisition Requirements With Federal Funds Participation in Any Part of The Project (Right of Way or Construction): updated link
- 09:01, 9 August 2010 diff hist +56 m 127.2 Historic Preservation and Cultural Resources updated links
- 08:57, 9 August 2010 diff hist +14 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →203.2.3.1.2 Borrow or Excess Material: updated link
- 08:56, 9 August 2010 diff hist +14 m Category:107 Legal Relations and Responsibility to the Public →107.10.4 Contractor Borrow Sites: Updated link
- 08:54, 9 August 2010 diff hist -847 m Category:135 Public Relations for Construction Activities Moved info to other articles, per CM current
- 08:51, 9 August 2010 diff hist -21 m Category:100 GENERAL Replaced EPG 135 with new EPG 136 The Section 106 Process. Old EPG 135 had been previously moved by CM to other articles in June
- 08:48, 9 August 2010 diff hist +15,797 N Category:135 The Section 106 Process Moved info from EPG The Section 106 Process to EPG 135. Old article had no significant history since Oct 2006; 1652 hits.
- 14:13, 6 August 2010 diff hist +2,105 m Category:470 Bituminous Asphalt Maintenance Moved five Maintc Planning Guidelines to this article (all from Jan 2008, no appreciable history and hits from 803 to 1739)
- 13:22, 6 August 2010 diff hist +77 m Category:134 Engineering Professional Services →134.3.6 Consultant Selection and Contract Administration Summary: inserted link
- 13:20, 6 August 2010 diff hist +50 m Category:134 Engineering Professional Services →134.3.2.7.3 Restitution for Errors and Omissions: updated link
- 12:55, 6 August 2010 diff hist 0 N File:Main Page Aug 6, 2010.jpg current
- 12:55, 6 August 2010 diff hist -25 m Main Page updated photo
- 12:37, 6 August 2010 diff hist +52 m Category:134 Engineering Professional Services minor link update
- 12:36, 6 August 2010 diff hist -103,666 m Engineering Professional Services Guidelines Moved info to EPG 134. No major policy changes since established in 2006. 19120 hits.
- 12:31, 6 August 2010 diff hist +103,793 m Category:134 Engineering Professional Services Moved EPG Engineering Professional Services Guidelines (no major changes since 2007; 19120 hits) into this article
- 11:53, 6 August 2010 diff hist +14 m Category:402 Bituminous Surface Leveling
- 11:52, 6 August 2010 diff hist -15 m Category:402 Bituminous Surface Leveling Modified pdf title
- 11:35, 6 August 2010 diff hist -20 m Main Page Contract Level Course templates, EPG 402
- 10:20, 6 August 2010 diff hist 0 N File:402 CLC Templates Aug 2010.pdf
- 10:20, 6 August 2010 diff hist +9 m Category:402 Bituminous Surface Leveling Per Design, updated Contract Leveling Course Plan templates
- 09:37, 6 August 2010 diff hist +6,135 m 127.3 Community Impact Assessment →127.3.2.2.1 Impact Assessment: Moved small article, EPG Community Impact Assessment Data List (May 2007, 541 hits, no appreciable history), info into this article.
- 08:13, 6 August 2010 diff hist +1,775 m 127.8 Hazardous and Solid Waste Moved EPG Requesting A Hazardous Waste Survey (Nov 2006, 640 hits) into this article
- 07:52, 6 August 2010 diff hist +2,256 m Category:129 Public Involvement EPG Basic List of Agencies (May 2007, 472 hits) moved into this article.
- 07:18, 6 August 2010 diff hist +921 m 606.1 Guardrail Moved info from EPG A Few Guardrail Crash Tests 606.1 Guardrail (From Sept 2007; 1344 hits) into this article.
- 14:00, 4 August 2010 diff hist +225 m 127.22 Off-Site Borrow, Spoil, and Staging Areas Per Environmental, clarification of contractor's responsibilities on off-site Environmental and Historic Preservation issues
- 11:47, 4 August 2010 diff hist +99 m 903.6 Warning Signs →903.6.7 Horizontal Alignment Signs (W1-1 through W1-5, W1-11) (MUTCD Section 2C.06): added link
- 11:40, 4 August 2010 diff hist +1,186 m 903.6 Warning Signs →903.6.49 Advisory Speed Supplemental Plaque (W13-1) (MUTCD Section 2C.46): moved EPG Engineering Study for Ballbanking here.
- 10:05, 4 August 2010 diff hist 0 N File:Written Notice of the Intended Acquisition Aug 4 2010.doc current
- 10:04, 4 August 2010 diff hist +10 m 236.10 Right Of Way Condemnation per RW, updated Written Notice of Intended Acquisition form
- 08:51, 4 August 2010 diff hist +29,026 m 127.2 Historic Preservation and Cultural Resources Incorporated several unnumbered articles (artifacts, landowner permission, etc.) into EPG 127.2.
- 06:51, 4 August 2010 diff hist +8 m 236.6 Appraisal and Appraisal Review →236.6.3.1 Standard Appraisal Format: minor clarification
- 14:24, 3 August 2010 diff hist +15 m 236.4 Description Writing and Titles →236.4.5.1 Description Writers: updated link
- 14:23, 3 August 2010 diff hist +15 m 236.14 Change in Route Status Report →236.14.1 Criteria for Retention: updated link
- 14:22, 3 August 2010 diff hist +15 m 607.3 One-Strand Cable - Access Restraint updated link
- 14:21, 3 August 2010 diff hist +15 m 230.2 Vertical Alignment →230.2.13 Outer Roadways and Service Roads: updated link
- 14:20, 3 August 2010 diff hist +30 m 643.3 Policy, Standards and Regulations →643.3.4.2 Roadway Crossings of Utilities Overhead crossings: updated links
- 14:19, 3 August 2010 diff hist +15 237.2 Title Sheet →237.2.4 Location Sketch: updated link
- 14:18, 3 August 2010 diff hist +15 m 236.13 Designing Right of Way Plans →236.13.5.4 Fully Controlled Access: updated link