User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:14, 14 July 2011 diff hist +3 m Category:235 Preliminary Plans →235.2 Procedure: Added missing word.
- 10:19, 21 June 2011 diff hist -3 m Category:123 Federal-Aid Highway Program Full oversight warrants brought in line with the 2011 FHWA/MoDOT Partnering Agreement.
- 16:00, 8 April 2011 diff hist -22 750.7 Non-Hydraulic Considerations →750.7.2 Types
- 16:24, 18 February 2011 diff hist -122 m Category:626 Rumble Strips →626.1 Edgeline Rumble Strips: Removed incorrect reference to a marking material.
- 14:53, 30 December 2010 diff hist +10 m 127.13 Noise →127.13.4.6 Reasonableness and Feasibility of Abatement: clarified datum for soundwall height.
- 11:51, 29 December 2010 diff hist 0 617.1 Temporary Traffic Barriers Changed index number to 617
- 11:43, 29 December 2010 diff hist 0 m 617.1 Temporary Traffic Barriers →616.1.2.3. Proprietary Temporary Traffic Barrier: Changed index number to 617
- 08:56, 5 October 2010 diff hist -153 Category:402 Bituminous Surface Leveling →402.1.3 Traffic Control, Pavement Marking and Signing: Removed erroneous payment information.
- 10:42, 17 September 2010 diff hist +69 m 136.8 Preliminary Design →136.8.6 Utility Relocations: Changed MoDOT's membership status for Missouri One Call.
- 11:55, 2 September 2010 diff hist +10 m LPA:136.4 Consultant Selection and Consultant Contract Management Updated link to sample solicitation form