User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:07, 26 July 2011 diff hist +51 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.3 DBE Trucking Companies: Per CM, added link to new QRG, Diaries
- 12:06, 26 July 2011 diff hist +51 m Category:113 Construction Inspection Guidance for Contractor's Claims Per CM, added link to new QRG, Diaries
- 12:04, 26 July 2011 diff hist +142 m Category:105 Control of Work →105.9 Authority and Duties of Resident Engineer (Sec 105.9): Per CM, added links to new QRG
- 11:28, 26 July 2011 diff hist 0 N File:Diaries.doc current
- 11:27, 26 July 2011 diff hist +34 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Added new QRG, Diaries
- 09:57, 26 July 2011 diff hist -116 m Category:134 Engineering Professional Services →134.3.1.1 Solicitation of Interest from Consultants: updated links
- 12:27, 25 July 2011 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy
- 12:25, 25 July 2011 diff hist +259 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.7.2.2 revision
- 12:24, 25 July 2011 diff hist -204 m 136.7 Right of Way and Public Hearings →136.7.2 Public Hearings: Updated link
- 12:20, 25 July 2011 diff hist -117 m 136.7 Right of Way and Public Hearings →136.7.2.2 Design Public Hearings: Per Design, reference to design public hearing being helf for any job requiring a road closure was removed. It is no longer the practice.
- 14:15, 22 July 2011 diff hist +28 m Category:109 Measurement and Payment Per CM updated a QRG, Line Item Adjustments
- 14:02, 22 July 2011 diff hist 0 N File:Line Item Adjustments July 22, 2011.doc current
- 14:01, 22 July 2011 diff hist +14 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM updated a QRG, Line Item Adjustments
- 08:11, 22 July 2011 diff hist +72 m 236.7 Negotiation →236.7.1.7 Public Information Brochure: Link to brochure
- 08:07, 22 July 2011 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators (Form 7-8.2) July 22 2011.pdf
- 08:06, 22 July 2011 diff hist -372 m 236.7 Negotiation Per RW Section, updated Form 7-8.2
- 14:41, 21 July 2011 diff hist 0 N File:101 survey.jpg current
- 14:40, 21 July 2011 diff hist 0 N File:101CM.jpg current
- 14:40, 21 July 2011 diff hist 0 N File:101 Bridge.jpg current
- 14:40, 21 July 2011 diff hist +107 m Category:101 Standard Forms added photos
- 12:07, 21 July 2011 diff hist +59 m Main Page added Big Bag link
- 10:57, 21 July 2011 diff hist -1 m 234.6 Diverging Diamond Interchanges →234.6.1 Introduction: Per Springfield district, updated links to Innovation publications
- 09:58, 21 July 2011 diff hist +47 m Main Page EPG 751.14
- 09:50, 21 July 2011 diff hist -636 m 751.50 Standard Detailing Notes →H10. Barrier Curbs: Per Bridge, removal of H10.16 and H 10.86
- 09:33, 21 July 2011 diff hist +16 m 751.14 Steel Superstructure →751.14.3.4 Wide Flange Splice Tables: Bridge discovered and corrected the errors in the "Total Number of Bolts"
- 07:24, 21 July 2011 diff hist 0 N File:1045.2.5.jpg current
- 07:24, 21 July 2011 diff hist +109 m Category:1045 Paint for Structural Steel →1045.2.5 High Solids Inorganic Zinc Silicate Coating: new photo
- 15:45, 20 July 2011 diff hist -50 m Help Article →Division Contacts: updated divisional contacts
- 08:37, 20 July 2011 diff hist +6 m 751.40 LFD Widening and Repair →751.40.2.6 Temporary Traffic Control Device: cosmetic adjustment
- 08:34, 20 July 2011 diff hist 0 N File:751.40 Temporary Traffic Control Device Section Thru Roadway July 20, 2011.jpg current
- 08:34, 20 July 2011 diff hist +4 m 751.40 LFD Widening and Repair →751.40.2.6 Temporary Traffic Control Device: Corrected figure, per Bridge
- 15:45, 19 July 2011 diff hist 0 N File:104.13 new.jpg current
- 15:45, 19 July 2011 diff hist +4 104.13 Construction Inspection Guidance for Sec 104 →Final Proposal
- 09:13, 19 July 2011 diff hist -60 m 236.6 Appraisal and Appraisal Review →236.6.5.10 Contracting Specialty Appraisals: removal of archaic link
- 15:43, 18 July 2011 diff hist -2 m 616.14 Work Zone Safety and Mobility Policy updated link to MUTCD
- 15:41, 18 July 2011 diff hist -3 m 616.18 Construction Inspection Guidelines for Sec 616 →Material (for Sec 616.2): Updated MUTCD link
- 15:40, 18 July 2011 diff hist -2 m 616.23 Traffic Control for Field Operations Updated MUTCD link
- 15:37, 18 July 2011 diff hist -4 m 616.19 Quality Standards for Temporary Traffic Control Devices updated links to MUTCD
- 14:50, 18 July 2011 diff hist +48 m 620.1 General (MUTCD Chapter 3A) →620.1.3 Materials (MUTCD Section 3A.03): Per Traffic, update of two JSPs (epoxy and high build)
- 14:48, 18 July 2011 diff hist 0 N File:620 High Build Wet Reflective Pavement Markings for Grooves.doc current
- 14:48, 18 July 2011 diff hist 0 N File:620 Epoxy Wet Reflective Pavement Markings for Grooves.doc current
- 14:47, 18 July 2011 diff hist +48 m Category:620 Pavement Marking Per Traffic, update of two JSPs (epoxy and high build)
- 07:44, 18 July 2011 diff hist 0 N File:Main Page July 18, 2011.jpg current
- 07:44, 18 July 2011 diff hist +136 m Main Page new photo
- 13:38, 15 July 2011 diff hist +44 m Category:109 Measurement and Payment Per CM, updated four more QRGs
- 13:34, 15 July 2011 diff hist 0 N File:Change Orders – Value Engineering July 2011.doc current
- 13:34, 15 July 2011 diff hist 0 N File:Change Orders – Time Adjustment July 2011.doc current
- 13:34, 15 July 2011 diff hist 0 N File:Change Orders – Mobilization and Contract Bond July 2011.doc current
- 13:33, 15 July 2011 diff hist 0 N File:Change Orders July 2011.doc current
- 13:33, 15 July 2011 diff hist +22 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated four more QRGs