User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:52, 12 September 2011 diff hist 0 N File:754 BEAP Consultant Listing.pdf
- 08:51, 12 September 2011 diff hist -637 m Category:754 Bridge Engineering Assistance Program (BEAP) Per Bridge, a different group of BEAP consultants for the next three years has been selected. EPG 754 has also been generally updated and clarified (with no major policy changes).
- 14:47, 9 September 2011 diff hist +21 m 751.5 Structural Detailing Guidelines →751.5.10 Reinforcing Steel Detailing: Minor cosmetic adjustment, per BR
- 14:38, 9 September 2011 diff hist +338 m Main Page EPG 751.13
- 14:02, 9 September 2011 diff hist 0 N File:751.13.4.6 Part Elevation of Barrier Curb.jpg current
- 14:01, 9 September 2011 diff hist 0 N File:751.13.4.6 Part Section AA.jpg current
- 14:01, 9 September 2011 diff hist 0 N File:751.13.4.5 Part Section AA.jpg current
- 14:00, 9 September 2011 diff hist 0 N File:751.13.4.5 Part Plan Square.jpg current
- 14:00, 9 September 2011 diff hist 0 N File:751.13.4.5 Section thru joint.jpg current
- 14:00, 9 September 2011 diff hist 0 N File:751.13.4.5 Part Elevation of Barrier Curb.jpg current
- 13:59, 9 September 2011 diff hist 0 N File:751.13.3.6 Part Elevation of Barrier Curb.jpg current
- 13:59, 9 September 2011 diff hist 0 N File:751.13.3.6 Part Section AA.jpg current
- 13:58, 9 September 2011 diff hist 0 N File:751.13.3.4 Skewed Structure.jpg current
- 13:58, 9 September 2011 diff hist 0 N File:751.13.3.4 Square Structure.jpg current
- 13:58, 9 September 2011 diff hist 0 N File:751.13.3.4 Part Elevation of Barrier Curb.jpg current
- 13:57, 9 September 2011 diff hist 0 N File:751.13.3.4 Part Section AA.jpg current
- 13:57, 9 September 2011 diff hist 0 N File:751.13.2.7 Typical part section AA.jpg current
- 13:57, 9 September 2011 diff hist 0 N File:751.13.2.6 Part Plan BB Skewed.jpg current
- 13:56, 9 September 2011 diff hist 0 N File:751.13.2.6 Part Plan BB Square.jpg current
- 13:56, 9 September 2011 diff hist 0 N File:751.13.2.6 Part Section AA.jpg current
- 13:55, 9 September 2011 diff hist 0 N File:751.13.2.6 Elevation.jpg current
- 13:55, 9 September 2011 diff hist 0 N File:751.13.2 Skewed Structure.jpg current
- 13:55, 9 September 2011 diff hist 0 N File:751.13.2 Square Structure.jpg current
- 13:54, 9 September 2011 diff hist 0 N File:751.13.2 Part Elevation of Barrier Curb.jpg current
- 13:54, 9 September 2011 diff hist 0 N File:751.13.2 Barrier Curb Details Part Section AA.jpg current
- 13:53, 9 September 2011 diff hist -2,108 751.13 Expansion Joint Systems Per Bridge (with approval from , Curb plate will no longer be required for silicone expansion, strip seal and preformed compression joint seal expansion systems.
- 09:51, 9 September 2011 diff hist 0 N File:Main Page 4a June 2011.jpg current
- 09:51, 9 September 2011 diff hist +77 m Main Page new photo
- 07:56, 9 September 2011 diff hist 0 m Main Page
- 15:12, 8 September 2011 diff hist 0 m Main Page
- 15:11, 8 September 2011 diff hist -8 m Main Page
- 15:08, 8 September 2011 diff hist 0 N File:Main Page 2 Sept 8, 2011.jpg current
- 15:08, 8 September 2011 diff hist -39 m Main Page new photo
- 13:56, 8 September 2011 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators (Form 7-8.2) Sept 2011.pdf
- 13:55, 8 September 2011 diff hist -3 m 236.7 Negotiation Per RW, updated Roster of Approved Contract Negotiators
- 13:34, 8 September 2011 diff hist 0 m Main Page
- 11:20, 8 September 2011 diff hist -74 Category:1091 Lighting Equipment
- 11:19, 8 September 2011 diff hist +74 Category:1091 Lighting Equipment
- 08:14, 8 September 2011 diff hist 0 m Main Page
- 07:35, 8 September 2011 diff hist -6 m Main Page EPG 450.3
- 07:31, 8 September 2011 diff hist +90 m Category:450 Bituminous Pavement Design →450.3 Layer Design: Per CM-Pavement, min thickness for BP-1 increased to 1 3/4" due to mix's density requirements; SP95 increased to 1 1/2" to achieve compaction without breaking the aggregate.
- 15:36, 2 September 2011 diff hist 0 m Main Page
- 14:51, 2 September 2011 diff hist -3 m Category:123 Federal-Aid Highway Program →123.1 Discussion: clarified caption
- 12:52, 2 September 2011 diff hist +28 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: updated link
- 08:55, 2 September 2011 diff hist 0 N File:Subcontracts Sept 2011.doc current
- 08:55, 2 September 2011 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, QRG Subcontracts updated
- 08:13, 2 September 2011 diff hist +1 m 236.16 Outdoor Advertising →236.16.3.9 Informal Hearing Procedures: Per RW, updated committee members' titles
- 07:48, 2 September 2011 diff hist 0 m Main Page
- 15:02, 1 September 2011 diff hist +1 m Main Page
- 14:59, 1 September 2011 diff hist -367 m Main Page New QRGs