User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:15, 19 September 2011 diff hist +215 m Main Page EPG 751.50 and EPG 620
- 08:58, 19 September 2011 diff hist +24 m 751.50 Standard Detailing Notes →J. MSE Wall Notes: added link
- 08:53, 19 September 2011 diff hist +382 m Category:620 Pavement Marking →Pavement Marking Guidelines: Per Traffic, two notes added for clarification of table info
- 08:39, 19 September 2011 diff hist +216 m 751.50 Standard Detailing Notes Per Bridge, J1.25 added to ensure we are giving the allowable bearing pressure (ABP) to the wall producers and contractors for design. The ABP will now be required to be shown on all MSE wall plans.
- 08:28, 19 September 2011 diff hist +157 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, "Non-Destructive Testing" wording was clarified
- 07:50, 19 September 2011 diff hist 0 N File:409 CSC Templates Sept 19, 2011.pdf
- 07:50, 19 September 2011 diff hist +4 m Category:409 Seal Coat Per Design, Seal Coat Template updated again
- 07:28, 19 September 2011 diff hist 0 N File:409 JSP Sept 19, 2011.doc current
- 07:27, 19 September 2011 diff hist +4 m Category:409 Seal Coat Per Design, Seal Coat JSP updated
- 07:30, 16 September 2011 diff hist 0 m Main Page
- 09:07, 15 September 2011 diff hist -1 m 751.9 Bridge Seismic Design →751.9.1.7 Directional Load Cases
- 13:19, 14 September 2011 diff hist +25 m Main Page EPG 409
- 13:02, 14 September 2011 diff hist 0 N File:409 CSC Templates Sept 2011.pdf
- 13:01, 14 September 2011 diff hist 0 N File:409 JSP Sept 2011.doc current
- 13:01, 14 September 2011 diff hist +20 m Category:409 Seal Coat Per Design, the Seal Coat JSP and Templates were updated.
- 12:14, 14 September 2011 diff hist +1 m Category:105 Control of Work →105.9.3 Daily Work Reports: Updated the type of QRG form, not the content
- 12:12, 14 September 2011 diff hist 0 N File:Daily Work Reports June 2011.docx
- 12:11, 14 September 2011 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 15:31, 13 September 2011 diff hist 0 N File:751.24 LFD Retaining Walls Sept 2011.pdf current
- 15:31, 13 September 2011 diff hist +1 m 751.24 Retaining Walls Per Bridge, the correct design practice of showing sloped elevation lines for bottom of wall elevations has been added. Other revisions to the guidance are clarifications.
- 09:19, 13 September 2011 diff hist 0 N File:236.11 Roster of Approved Contract Mediators (Form 11.2.3) Sept 13 2011.pdf
- 09:18, 13 September 2011 diff hist +8 m 236.11 Mediation Per RW, updated Roster of Approved Contract Mediators
- 12:24, 12 September 2011 diff hist 0 N File:236.7 Administrative Settlement Justification Letter.pdf
- 12:24, 12 September 2011 diff hist 0 m 236.7 Negotiation Per RW, Admin. Settlement Justification Letter form updated.
- 09:02, 12 September 2011 diff hist +32 m Main Page EPG 754
- 08:54, 12 September 2011 diff hist 0 N File:754 Exhibit 2 General Scope of Services.pdf
- 08:53, 12 September 2011 diff hist 0 N File:754 Exhibit 1 Estimate of Cost.pdf
- 08:53, 12 September 2011 diff hist 0 N File:754 BEAP Hourly Rate Fee.pdf
- 08:52, 12 September 2011 diff hist 0 N File:754 BEAP Project Tracking Form.docx
- 08:52, 12 September 2011 diff hist 0 N File:754 BEAP Consultant Listing.pdf
- 08:51, 12 September 2011 diff hist -637 m Category:754 Bridge Engineering Assistance Program (BEAP) Per Bridge, a different group of BEAP consultants for the next three years has been selected. EPG 754 has also been generally updated and clarified (with no major policy changes).
- 14:47, 9 September 2011 diff hist +21 m 751.5 Structural Detailing Guidelines →751.5.10 Reinforcing Steel Detailing: Minor cosmetic adjustment, per BR
- 14:38, 9 September 2011 diff hist +338 m Main Page EPG 751.13
- 14:02, 9 September 2011 diff hist 0 N File:751.13.4.6 Part Elevation of Barrier Curb.jpg current
- 14:01, 9 September 2011 diff hist 0 N File:751.13.4.6 Part Section AA.jpg current
- 14:01, 9 September 2011 diff hist 0 N File:751.13.4.5 Part Section AA.jpg current
- 14:00, 9 September 2011 diff hist 0 N File:751.13.4.5 Part Plan Square.jpg current
- 14:00, 9 September 2011 diff hist 0 N File:751.13.4.5 Section thru joint.jpg current
- 14:00, 9 September 2011 diff hist 0 N File:751.13.4.5 Part Elevation of Barrier Curb.jpg current
- 13:59, 9 September 2011 diff hist 0 N File:751.13.3.6 Part Elevation of Barrier Curb.jpg current
- 13:59, 9 September 2011 diff hist 0 N File:751.13.3.6 Part Section AA.jpg current
- 13:58, 9 September 2011 diff hist 0 N File:751.13.3.4 Skewed Structure.jpg current
- 13:58, 9 September 2011 diff hist 0 N File:751.13.3.4 Square Structure.jpg current
- 13:58, 9 September 2011 diff hist 0 N File:751.13.3.4 Part Elevation of Barrier Curb.jpg current
- 13:57, 9 September 2011 diff hist 0 N File:751.13.3.4 Part Section AA.jpg current
- 13:57, 9 September 2011 diff hist 0 N File:751.13.2.7 Typical part section AA.jpg current
- 13:57, 9 September 2011 diff hist 0 N File:751.13.2.6 Part Plan BB Skewed.jpg current
- 13:56, 9 September 2011 diff hist 0 N File:751.13.2.6 Part Plan BB Square.jpg current
- 13:56, 9 September 2011 diff hist 0 N File:751.13.2.6 Part Section AA.jpg current
- 13:55, 9 September 2011 diff hist 0 N File:751.13.2.6 Elevation.jpg current