User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:48, 1 November 2011 diff hist 0 N File:144.1 central.pdf current
- 12:48, 1 November 2011 diff hist 0 N File:144.1 kc.pdf current
- 12:48, 1 November 2011 diff hist 0 N File:144.1 ne.pdf current
- 12:47, 1 November 2011 diff hist 0 N File:144.1 nw.pdf
- 12:47, 1 November 2011 diff hist 0 N File:144.1 continuous operations.pdf
- 12:46, 1 November 2011 diff hist 0 N File:144.1 continuous operations 2011.jpg current
- 12:46, 1 November 2011 diff hist -339 m Category:144 Practical Operations Per Maintenance, maps of Continuous Operations Routes updated.
- 10:03, 1 November 2011 diff hist 0 N File:236.17 Junkyard Controlled Routes Oct 31, 2011.pdf
- 10:02, 1 November 2011 diff hist 0 m 236.17 Junkyards Per RW, junkyard controlled routes description updated
- 10:00, 1 November 2011 diff hist 0 N File:236.16 ODA Controlled Routes Description Oct 31, 2011.pdf
- 10:00, 1 November 2011 diff hist -25 m 236.16 Outdoor Advertising Per RW, updated billboard controlled routes description.
- 09:20, 1 November 2011 diff hist +488 m Main Page EPG 236
- 09:07, 1 November 2011 diff hist +85 m LPA:136.8 Local Public Agency Land Acquisition →236.18.6.1.2 Scope of Assignment: added link
- 08:56, 1 November 2011 diff hist +736 m LPA:136.8 Local Public Agency Land Acquisition →236.18.6.1.2 Scope of Assignment: Per RW, fee consultants' duration on approved rosters is 3 yrs after which a renewal application must be submitted to remain on the list. Based on Secr of St.
- 08:49, 1 November 2011 diff hist +816 m 236.11 Mediation →236.11.2.2 Application for Employment as Contract Mediator: Per RW, fee consultants' duration on approved rosters is 3 yrs after which a renewal application must be submitted to remain on the list
- 08:45, 1 November 2011 diff hist +829 m 236.7 Negotiation →236.7.8.1 Application for Employment as Contract Negotiator: Per RW, fee consultants' duration on approved rosters is 3 yrs after which a renewal application must be submitted to remain listed.
- 08:38, 1 November 2011 diff hist +619 m 236.6 Appraisal and Appraisal Review Per RW, fee consultants' duration on approved rosters is 3 years afte which a renewal application must be submitted to remain on the list. Revision is based on comments from MO's Sec'y of State.
- 08:19, 1 November 2011 diff hist +80 m 236.11 Mediation Per RW, updated Application for Employment as a Contract Mediator (Form 11.2.2)
- 08:11, 1 November 2011 diff hist +82 m 236.7 Negotiation Per RW, updated Application for Employment as a Contract Negotiator (Form 7-8.1)
- 15:34, 31 October 2011 diff hist 0 m Main Page
- 13:29, 31 October 2011 diff hist 0 N File:104.7 Engineering Factors Report a.pdf
- 13:29, 31 October 2011 diff hist +4 m 104.7 Scoping Estimates Per Transportation Planning, Engineering Factors figure updated.
- 13:07, 31 October 2011 diff hist 0 N File:Form 236.8.6.8(b) 2011.pdf
- 13:07, 31 October 2011 diff hist +1 m 236.8 Relocation Assistance Program
- 13:05, 31 October 2011 diff hist 0 N File:Form 236.8.6.8(b)2011.pdf
- 13:05, 31 October 2011 diff hist +14 m 236.8 Relocation Assistance Program Per RW, updated Acquisition Statement Form.
- 13:00, 31 October 2011 diff hist +86 m Category:236 Right of Way added link
- 12:23, 31 October 2011 diff hist 0 N File:236.6.5.3 Application for Employment as Contract Appraiser (Form 6.5.3).docx
- 12:23, 31 October 2011 diff hist +2 m 236.6 Appraisal and Appraisal Review Per RW, Application for Employment as Contract Appraiser form updated.
- 07:58, 31 October 2011 diff hist 0 N File:236.11 Mediator's Letter to Property Owner.pdf
- 07:58, 31 October 2011 diff hist 0 N File:236.11 Confirmation of Mediation.pdf
- 07:57, 31 October 2011 diff hist 0 m 236.11 Mediation Per RW, update of two forms: Mediator's Letter to Property Owner and Confirmation of Mediation
- 07:47, 31 October 2011 diff hist +2 m 751.24 Retaining Walls →751.24.2.1 Design: Minor clarification, per Bridge
- 14:45, 27 October 2011 diff hist +23 m Category:1058 Polyethylene Sheeting →1058.1 Procedure: Per Bridge, a clarification of where the bond breaker is to be used.
- 14:44, 27 October 2011 diff hist -2 m 1055.4 Laboratory Testing Guidelines for Sec 1055 Per Bridge, AASHTO M171 replaced with ASTM C 171 (since the former no longer exists).
- 14:33, 27 October 2011 diff hist +4,683 m Category:138 Project Development Chronology Major Milestones for Projects info added
- 12:19, 27 October 2011 diff hist +28 m Category:127 MoDOT and the Environment
- 12:16, 27 October 2011 diff hist 0 m 127.2 Historic Preservation and Cultural Resources
- 14:01, 26 October 2011 diff hist +235 m Main Page EPG 751.1 and EPG 751.32
- 13:41, 26 October 2011 diff hist 0 N File:751.32.4.2 part plan.jpg current
- 13:41, 26 October 2011 diff hist 0 N File:751.32.4.2 part section.jpg current
- 13:40, 26 October 2011 diff hist 0 N File:751.32.4.2 part elev.jpg current
- 13:31, 26 October 2011 diff hist 0 N File:751.32.3.3.2.jpg current
- 13:30, 26 October 2011 diff hist 0 N File:751.32.3.3.1.jpg current
- 13:29, 26 October 2011 diff hist +3,141 m 751.32 Concrete Pile Cap Intermediate Bents Per Bridge, expanded guidance for encased pile cap bent
- 12:24, 26 October 2011 diff hist +2,347 m 751.1 Preliminary Design Per Bridge, expanded guidance about encased pile cap bents and corrosion
- 15:08, 25 October 2011 diff hist 0 N File:104.7 Engineering Factors Report 08 to 10.pdf
- 15:08, 25 October 2011 diff hist 0 N File:104.7 Engineering Factors Report 07 to 09.pdf
- 15:08, 25 October 2011 diff hist 0 N File:104.7 Engineering Factors Report 06 to 08.pdf
- 15:08, 25 October 2011 diff hist +427 m 104.7 Scoping Estimates Per Transportation Planning, historic Engineering Reports made available