User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:42, 19 January 2012 diff hist -68 m 106.17 New Product Evaluation Per CM, updated New Product Evaluation Form
- 09:32, 19 January 2012 diff hist -2 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel: Per RW, minor correction
- 09:25, 19 January 2012 diff hist -2 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated link
- 09:08, 19 January 2012 diff hist 0 m Where to Find Construction and Materials Functions →EPG articles from Field Section 900 (Traffic Control Facilities): updated link
- 09:01, 19 January 2012 diff hist -463 m 903.5 Regulatory Signs →903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Section 2B.53): Clarifications, per Traffic.
- 08:49, 19 January 2012 diff hist +21 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, minor clarification
- 08:48, 19 January 2012 diff hist +10 m 751.50 Standard Detailing Notes →H1. Steel: Per Bridge, minor clarification to H1.17
- 08:41, 19 January 2012 diff hist -218 m Main Page EPG 749.5
- 08:38, 19 January 2012 diff hist -21 m Category:749 Hydrologic Analysis →749.5.3.2 Kerby-Hathaway Equation for Overland Flow: Per Bridge, roughness coefficients for the Kerby-Hathaway Equation for Overland Flow were updated to match the runoff program.
- 16:48, 18 January 2012 diff hist +18 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.46 Use of Signs at Signalized Locations (MUTCD 4D.34): updated link
- 16:29, 18 January 2012 diff hist +430 m Main Page EPG 900, etc.
- 16:03, 18 January 2012 diff hist -130 m 903.17 Delineation and Object Markers updated link
- 15:58, 18 January 2012 diff hist +19 m 903.6 Warning Signs →903.6.39 Traffic Signal Signs (W25-1, W25-2) (MUTCD Section 2C.48): updated link
- 15:57, 18 January 2012 diff hist +19 m 903.6 Warning Signs →903.6.2 Application of Warning Signs (MUTCD Section 2C.02): updated link
- 15:55, 18 January 2012 diff hist -108 m 903.5 Regulatory Signs →903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Section 2B.53): updated link
- 15:52, 18 January 2012 diff hist -45 m 903.3 Ground-Mounted Sign Supports →903.3.8 Perforated Square Steel Tube Posts: removed link
- 15:51, 18 January 2012 diff hist -45 m 903.3 Ground-Mounted Sign Supports removed link
- 15:50, 18 January 2012 diff hist -45 m 903.3 Ground-Mounted Sign Supports →903.3.6 U-Channel Posts: removed link
- 15:50, 18 January 2012 diff hist -45 m 903.3 Ground-Mounted Sign Supports →903.3.4 Pipe Posts: removed link
- 15:49, 18 January 2012 diff hist -45 m 903.3 Ground-Mounted Sign Supports →903.3.3 Mounting Height (MUTCD Section 2A.18): removed link
- 15:48, 18 January 2012 diff hist +50 m 903.2 Extent of Signing →903.2.10 Plan Development Procedure: updated link
- 15:47, 18 January 2012 diff hist +105 m 903.2 Extent of Signing →903.2.11 Signing Plans: updated links
- 15:39, 18 January 2012 diff hist +19 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.44 Temporary and Portable Traffic Control Signals (MUTCD Section 4D.32): updated link
- 15:39, 18 January 2012 diff hist +38 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.39 Flashing Operation of Traffic Control Signals – General (MUTCD Section 4D.28): updated links
- 15:37, 18 January 2012 diff hist +38 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.15 Positions of Signal Indications Within a Vertical Signal Face (MUTCD Section 4D.09): updated links
- 15:36, 18 January 2012 diff hist +19 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.13 Size of Vehicular Indications (MUTCD Section 4D.07): updated link
- 15:36, 18 January 2012 diff hist +19 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.11 Application of Steady Signal Indications (MUTCD Section 4D.05): updated link
- 15:35, 18 January 2012 diff hist +19 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.10 Meaning of Vehicular Signal Indications (MUTCD Section 4D.04): updated link
- 15:34, 18 January 2012 diff hist +18 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.2.1 Signal Timing: updated link
- 15:33, 18 January 2012 diff hist +115 902.3 Traffic Control Signal Needs Studies (MUTCD Chapter 4C) updated links
- 15:29, 18 January 2012 diff hist +39 m 902.2 Traffic Control Signals (MUTCD Chapter 4B) updated links
- 15:25, 18 January 2012 diff hist 0 N File:900 Substantial Conformance.pdf current
- 15:25, 18 January 2012 diff hist 0 N File:900 MUTCD History.pdf current
- 15:22, 18 January 2012 diff hist -19 m 620.4 Markings for Preferential Lanes (MUTCD Chapter 3D) →Table 620.4.2 Standard Edgeline and Lane Line Markings for Preferential Lanes (MUTCD 3D-1): updated link
- 15:20, 18 January 2012 diff hist 0 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.10 Approach Markings for Obstructions (MUTCD Section 3B.10): updated link
- 15:16, 18 January 2012 diff hist 0 N File:620.15.14.2.jpg current
- 15:16, 18 January 2012 diff hist 0 N File:620.15.14.1 Sheet 7.jpg current
- 15:16, 18 January 2012 diff hist 0 N File:620.15.14.1 Sheet 6.jpg current
- 15:16, 18 January 2012 diff hist 0 N File:620.15.14.1 Sheet 5.jpg current
- 15:16, 18 January 2012 diff hist 0 N File:620.15.14.1 Sheet 4.jpg current
- 15:15, 18 January 2012 diff hist 0 N File:620.15.14.1 Sheet 3.jpg current
- 15:15, 18 January 2012 diff hist 0 N File:620.15.14.1 Sheet 2.jpg current
- 15:15, 18 January 2012 diff hist 0 File:620.15.14.1 Sheet 1.jpg uploaded a new version of "Image:620.15.14.1 Sheet 1.jpg" current
- 15:14, 18 January 2012 diff hist 0 N File:620.15.14.1 Sheet 1.jpg
- 15:14, 18 January 2012 diff hist 0 N File:620.15.14 Sheet 2.jpg current
- 15:13, 18 January 2012 diff hist 0 N File:620.15.14 Sheet 1.jpg current
- 15:13, 18 January 2012 diff hist 0 m 620.14 3M Installation Contract 620.14 3M Tape Installation Contract moved to 620.14 3M Installation Contract
- 15:13, 18 January 2012 diff hist +45 N 620.14 3M Tape Installation Contract 620.14 3M Tape Installation Contract moved to 620.14 3M Installation Contract current
- 15:00, 18 January 2012 diff hist +2,846 620.14 3M Installation Contract Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.
- 14:58, 18 January 2012 diff hist 0 m 620.14 3M Installation Contract 620.12 3M Tape moved to 620.14 3M Tape Installation Contract: Per Traffic, revision to bring policy into substantial compliance with the 2009 MUTCD.