User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:02, 7 February 2012 diff hist +19 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.19 Median Acceleration Lanes: PerTraffic, concurrence by Traffic Division is no longer necessary for median acceleration lanes.
- 14:29, 6 February 2012 diff hist -6 m Main Page
- 15:17, 3 February 2012 diff hist 0 N File:616.2.4 POP Sign 36x48 Feb 2012.jpg current
- 15:16, 3 February 2012 diff hist 0 N File:616.2.4 POP Sign 96x48 Feb 2012.jpg current
- 10:20, 3 February 2012 diff hist +248 m 236.16 Outdoor Advertising Per Right of Way, general clarification of guidance
- 09:55, 3 February 2012 diff hist -3 m Category:806 Pollution, Erosion and Sediment Control →806.7 Construction Inspection Guidance for Sec. 806: Per Design, updated links
- 16:11, 2 February 2012 diff hist -12 Main Page
- 16:10, 2 February 2012 diff hist +364 m Main Page EPG 751.50
- 15:49, 2 February 2012 diff hist +3,052 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, complete replacement of the paint notes
- 15:39, 2 February 2012 diff hist +4,430 m 751.50 Standard Detailing Notes →A4. Protective Coatings: Per Bridge, complete replacement of the paint notes
- 16:35, 1 February 2012 diff hist -21 m Main Page EPG 616.2.4
- 12:36, 1 February 2012 diff hist -45 m Main Page EPG 233.2.19
- 12:01, 1 February 2012 diff hist -110 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.19 Median Acceleration Lanes: Per Design, the process for obtaining concurrence for the use of a median acceleration lanes was clarified.
- 14:32, 31 January 2012 diff hist 0 N File:616.30 Work Zone Impact Spreadsheet Jan 2012.xls current
- 14:32, 31 January 2012 diff hist +27 m 616.13 Work Zone Capacity, Queue and Travel Delay Per Traffic, updated the Work Zone Impact Spreadsheet
- 13:13, 31 January 2012 diff hist +2 Category:105 Control of Work
- 12:15, 31 January 2012 diff hist -71 m 750.7 Non-Hydraulic Considerations →750.7.6 Circular Reinforced Concrete Pipes: Per Bridge, minor corrections to most recent update.
- 11:24, 31 January 2012 diff hist -41 m 643.4 Railroads updated link
- 10:56, 31 January 2012 diff hist +57 m 643.4 Railroads →643.4.6 Flashing Light Signals, Gates and Traffic Control Signals (MUTCD Section 8C)
- 10:50, 31 January 2012 diff hist -2 m Main Page
- 10:49, 31 January 2012 diff hist +118 m Main Page EPG 237.14
- 10:05, 31 January 2012 diff hist +513 m Main Page EPG 237 and EPG 750
- 09:06, 31 January 2012 diff hist +1,664 Category:1026 Reinforced Concrete Culvert Pipe →1026.3 Special or Modified Designs: Per Bridge, clarified the submittal process for special design pipe for MoDOT personnel, contractors and manufacturer.
- 09:03, 31 January 2012 diff hist +703 750.7 Non-Hydraulic Considerations Per Bridge, clarified the submittal process for special design pipe for MoDOT personnel, contractors and manufacturer.
- 08:59, 31 January 2012 diff hist +117 Category:726 Rigid Pipe Culverts →726.1.2 Bedding: Per Bridge, clarified the submittal process for special design pipe for MoDOT personnel, contractors and manufacturer.
- 08:52, 31 January 2012 diff hist +12,635 237.14 Electronic Design Data Delivery (BIM Deliverables) Per Design, guidance provided to accommodate advanced technology such as automated machine guidance for earthwork & paving and for intelligent compaction.
- 08:47, 31 January 2012 diff hist +2,392 237.13 Contract Plan File Name Convention Per Design, guidance provided to accommodate advanced technology such as automated machine guidance for earthwork & paving and for intelligent compaction.
- 08:44, 31 January 2012 diff hist -11 237.9 Submission of Plans and Supporting Documents Per Design, guidance provided to accommodate advanced technology such as automated machine guidance for earthwork & paving and for intelligent compaction.
- 16:01, 30 January 2012 diff hist -5 m Main Page EPG 902.5.5.2.6
- 15:46, 30 January 2012 diff hist +861 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.5.2.6 Adaptive Control: Per Traffic, added guidance for installation of adaptive traffic signal systems
- 11:37, 30 January 2012 diff hist 0 N File:806.8 SWPPP Jan 30, 2012.docx
- 11:36, 30 January 2012 diff hist +4 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Environmental, updated Easily Printable Version of SWPPP
- 16:19, 27 January 2012 diff hist +290 m Main Page EPG 806.8
- 16:16, 27 January 2012 diff hist 0 N File:Fig. 806.8.1.docx
- 16:11, 27 January 2012 diff hist 0 N File:806.8.jpg current
- 16:11, 27 January 2012 diff hist 0 N File:Fig. 806.8.15.docx current
- 16:11, 27 January 2012 diff hist 0 N File:Fig. 806.8.14.docx
- 16:10, 27 January 2012 diff hist 0 N File:Form 806.8.10.docx
- 16:10, 27 January 2012 diff hist 0 N File:Fig. 806.8.9.docx
- 16:10, 27 January 2012 diff hist 0 N File:Fig. 806.4.1.pdf
- 16:09, 27 January 2012 diff hist 0 N File:806.8 SWPPP Jan 2012.docx
- 16:08, 27 January 2012 diff hist +19,152 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Env'l, batch plants are not covered under the MoDOT land disturbance permit & require separate permitting thru MDNR. Also, excess material disposal areas same Env/HP clearances as borrow sites.
- 15:56, 27 January 2012 diff hist -47 m Main Page EPG Environmental Studies
- 15:37, 27 January 2012 diff hist 0 N File:MS4.pdf
- 15:37, 27 January 2012 diff hist 0 N File:Stormwater Management Plan.pdf
- 15:36, 27 January 2012 diff hist +1 m Environmental Studies →=SWMP and MS4
- 15:36, 27 January 2012 diff hist +201 m Environmental Studies →Water Quality: Environmental added two figures: Stormwater Management Plan and the Municipal Separate Storm Sewer Systems permit program.
- 15:28, 27 January 2012 diff hist -3 Environmental Studies →Non-Point Source Pollution
- 11:16, 27 January 2012 diff hist +204 806.8 Storm Water Pollution Prevention Plan (SWPPP)
- 16:44, 25 January 2012 diff hist +75 m Main Page EPG 910.3