User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:56, 1 May 2012 diff hist -1 m Main Page
- 13:49, 30 April 2012 diff hist +12 m LPA:136.9 Plans, Specs and Estimates (PSE) Per Design, Fig. 136.9.1 updated as an Excel file.
- 13:46, 30 April 2012 diff hist 0 N File:136.9.1.xls
- 13:46, 30 April 2012 diff hist +76 m LPA:136.12 Figures, Glossary and Other Useful Links Per Design, Fig. 136.9.1 updated as an Excel file.
- 13:34, 30 April 2012 diff hist +42 m LPA:136.3 Federal Aid Basics Per Design, Fig. 136.3.18 uploaded and renamed
- 13:32, 30 April 2012 diff hist 0 N File:136.3.18.xls current
- 13:32, 30 April 2012 diff hist +20 m LPA:136.12 Figures, Glossary and Other Useful Links Per Design, Fig. 136.3.18 uploaded and renamed
- 11:15, 30 April 2012 diff hist +352 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: New figures, Figs. 136.11.14 and 136.11.15.
- 11:10, 30 April 2012 diff hist -4 m LPA:136.4 Consultant Selection and Consultant Contract Management Corrected label for Fig. 136.4.10
- 11:08, 30 April 2012 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Corrected label for Fig. 136.4.10
- 11:06, 30 April 2012 diff hist +23 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures
- 11:05, 30 April 2012 diff hist +164 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per Design, two new figures added
- 11:02, 30 April 2012 diff hist +363 m LPA:136.11 Local Public Agency Construction Per Design, two new figures and associated guidance added
- 10:58, 30 April 2012 diff hist 0 N File:Fig. 136.11.15.pdf current
- 10:57, 30 April 2012 diff hist 0 N File:Fig. 136.11.14.pdf current
- 10:57, 30 April 2012 diff hist +638 m LPA:136.3 Federal Aid Basics →136.3.15.1 Progress Invoices: Per Design, two new figures and associated guidance added
- 09:18, 30 April 2012 diff hist +4 m LPA:136.3 Federal Aid Basics →136.3.8 Programs
- 09:16, 30 April 2012 diff hist +2 m LPA:136.3 Federal Aid Basics →136.3.8 Programs
- 09:09, 30 April 2012 diff hist +723 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.1 revised and changes in EPG 136.3 noted.
- 08:57, 30 April 2012 diff hist 0 N File:136.3.1.doc current
- 08:56, 30 April 2012 diff hist -6,661 m LPA:136.3 Federal Aid Basics Per LP Administrator, because the info required by Fig. 136.3.1 Programming Data was split between it and Fig. 136.6.4 LPA Request for Env'l Review, the guidance for programming projects was revised.
- 15:17, 27 April 2012 diff hist +59 m Main Page EPG 130
- 13:46, 27 April 2012 diff hist +1 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.29.2 General Principles (MUTCD Section 9C.03): updated link
- 13:40, 27 April 2012 diff hist -4 m Category:901 Lighting new photo
- 13:39, 27 April 2012 diff hist 0 N File:901 2012.jpg current
- 13:22, 27 April 2012 diff hist +194 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.1 Types of Devices (MUTCD 6F.01): added photo
- 13:21, 27 April 2012 diff hist 0 N File:616.6.1 safety.jpg current
- 13:18, 27 April 2012 diff hist +138 m 616.5 Flagger Control (MUTCD Chapter 6E) →616.5.3 Hand-Signaling Devices (MUTCD 6E.03): added photo
- 13:17, 27 April 2012 diff hist 0 N File:616.5.3.jpg current
- 13:07, 27 April 2012 diff hist +162 m Category:207 Linear Grading →207.4 Classified Excavation: added photo
- 13:07, 27 April 2012 diff hist 0 N File:207.4.jpg current
- 13:05, 27 April 2012 diff hist +98 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.1 Yellow Centerline Pavement Markings and Warrants (MUTCD Section 3B.01): added photo
- 13:04, 27 April 2012 diff hist 0 N File:620.2.1.jpg current
- 07:47, 27 April 2012 diff hist +176 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: EPG 136.6.4.8
- 07:46, 27 April 2012 diff hist +27 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.8 Stormwater and Erosion Control: Per Design, in paragraph #3, SWPPP does not need to be site-specific, but the erosion control plan does need to be site-specific.
- 07:41, 27 April 2012 diff hist +276 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy
- 07:37, 27 April 2012 diff hist +193 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.8 Stormwater and Erosion Control: Per Design, clarified guidance on the need for a erosion control plan
- 07:32, 27 April 2012 diff hist +67 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.3 Sample Record: Per CM, updated form
- 07:31, 27 April 2012 diff hist +27 m Category:101 Standard Forms →Materials Related: Per CM, updated form
- 13:22, 26 April 2012 diff hist -134 m Main Page EPG 135.1
- 13:09, 26 April 2012 diff hist 0 N File:135.doc current
- 13:07, 26 April 2012 diff hist -1,355 m Category:135 The Section 106 Process Per Environmental, revision reflects the new guidance for Local Public Agencies.
- 12:52, 26 April 2012 diff hist +103 m 751.5 Structural Detailing Guidelines →751.5.2.2 Boring Data Sheet: Per Bridge, replace figure of boring log with two new figures of this log.
- 12:49, 26 April 2012 diff hist 0 N File:751.5.2.2 Ex 2.jpg current
- 12:49, 26 April 2012 diff hist 0 N File:751.5.2.2 Ex 1.jpg current
- 12:32, 26 April 2012 diff hist -55 m Category:101 Standard Forms →Scoping: Per Design, updated three forms
- 12:30, 26 April 2012 diff hist 0 N File:104.6 Project Scoping Checklist Apr 26, 2012.doc current
- 12:30, 26 April 2012 diff hist 0 N File:104.6 Project Development Liaison Checklist Apr 26, 2012.doc current
- 12:30, 26 April 2012 diff hist 0 N File:104.6 Design Checklist Apr 26, 2012.doc current
- 12:30, 26 April 2012 diff hist +50 m 104.6 Project Scoping Checklists Per Design, updated three forms