User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:21, 13 June 2012 diff hist 0 N File:Main Page 4 June 13, 2012.jpg current
- 11:21, 13 June 2012 diff hist -314 m Main Page new photo
- 08:24, 13 June 2012 diff hist -70 m LPA:136.12 Figures, Glossary and Other Useful Links Updated link
- 08:19, 13 June 2012 diff hist -45 Engineering Professional Services Guidelines current
- 07:23, 13 June 2012 diff hist 0 m Main Page EPG 134
- 07:12, 13 June 2012 diff hist -197 Main Page
- 07:07, 13 June 2012 diff hist 0 N File:134.2.2.2.doc current
- 07:07, 13 June 2012 diff hist 0 N File:134.2.2.5.7.doc current
- 07:07, 13 June 2012 diff hist 0 N File:134.2.2.5.5.doc current
- 07:07, 13 June 2012 diff hist 0 N File:134.2.2.5.4.doc current
- 07:06, 13 June 2012 diff hist 0 N File:134.5.2.docx
- 07:06, 13 June 2012 diff hist 0 N File:134.4.1.docx
- 07:06, 13 June 2012 diff hist 0 N File:134.3.6.1.2.pdf current
- 07:05, 13 June 2012 diff hist 0 N File:134.4.2.doc current
- 07:05, 13 June 2012 diff hist 0 N File:134.5.1.2.docx
- 07:05, 13 June 2012 diff hist 0 N File:134.3.2.pdf current
- 07:05, 13 June 2012 diff hist 0 N File:134.2.2.5.6.doc current
- 07:04, 13 June 2012 diff hist 0 N File:134.2.2.5.2.doc current
- 07:04, 13 June 2012 diff hist 0 N File:134.2.2.5.3.doc current
- 07:04, 13 June 2012 diff hist 0 N File:134.2.2.5.1.doc current
- 07:04, 13 June 2012 diff hist 0 N File:134.3.6.1.1.doc current
- 07:03, 13 June 2012 diff hist 0 N File:134.5.1.1.docx
- 07:03, 13 June 2012 diff hist -24,448 m Category:134 Engineering Professional Services Re-write of EPG 134 for greater clarification. Minor new consultant requirements for invoice documentation.
- 13:40, 12 June 2012 diff hist +56 m Main Page EPG 127.25.7.3
- 13:37, 12 June 2012 diff hist +474 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: EPG 136.6.4.10.2
- 13:33, 12 June 2012 diff hist +1,781 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.10.2 Painting Bridges and Demolition of Painted Structures: Per Environmental, process change required by MoDOT's signing an MOU with DHSS.
- 13:22, 12 June 2012 diff hist +1,724 m 127.25 Maintenance Environmental Policies →127.25.7.3 Lead Based Paint Abatement: Per Environmental, process change required by MoDOT's signing an MOU with DHSS.
- 10:41, 12 June 2012 diff hist -9 m 106.17 New Product Evaluation Per CM, updated address
- 10:37, 12 June 2012 diff hist +140 m Main Page EPG 616.13
- 09:29, 12 June 2012 diff hist -3,728 m 616.23 Traffic Control for Field Operations →616.23.2.5.8 Lighting Devices: Per Traffic, information moved from EPG 616.23 TCFO to other articles (EPG 616.6.81 and EPG 616.6.82) for greater clarity.
- 09:27, 12 June 2012 diff hist 0 N File:616.6.82.jpg current
- 09:27, 12 June 2012 diff hist 0 N File:616.6.81.jpg current
- 09:26, 12 June 2012 diff hist +1,835 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per Traffic, Lighting Devices and Floodlight guidance expanded (moved from EPG 616.23.2.5.8)
- 09:19, 12 June 2012 diff hist 0 N File:616.13.2 Directions.docx
- 09:19, 12 June 2012 diff hist 0 N File:616.13 WZ Impact Spreadsheet.xls current
- 09:19, 12 June 2012 diff hist +3,448 m 616.13 Work Zone Capacity, Queue and Travel Delay Per Traffic, the MoDOT Work Zone Impact Analysis Spreadsheet was updated with HCM 2010 Program info.
- 15:24, 11 June 2012 diff hist -184 m Main Page EPG 101 Forms
- 15:20, 11 June 2012 diff hist +12 m 902.4 Signal Installations and Equipment Updated link to New Product Evaluation Form, per CM
- 15:16, 11 June 2012 diff hist +92 m 106.17 New Product Evaluation Per CM, update of New Product Evaluation form
- 15:15, 11 June 2012 diff hist +48 m 106.12 Pre-Acceptance Lists (PAL) Updated link to New Product Evaluation Form, per CM
- 15:12, 11 June 2012 diff hist +12 m Category:101 Standard Forms →Materials Related: Updated link to New Product Evaluation Form, per CM
- 14:38, 11 June 2012 diff hist +205 m LPA:136.12 Figures, Glossary and Other Useful Links Figs. 136.4.10 and 136.4.18 were updated.
- 14:34, 11 June 2012 diff hist 0 N File:Fig. 136.4.18 June 2012.doc
- 14:33, 11 June 2012 diff hist 0 N File:136.4.10 June 2012.doc current
- 14:33, 11 June 2012 diff hist +40 m LPA:136.4 Consultant Selection and Consultant Contract Management Figs. 136.4.10 and 136.4.18 were updated, per Design
- 08:03, 11 June 2012 diff hist +270 m Main Page
- 07:41, 11 June 2012 diff hist -1,496 m Demolition and Removal of Improvements Per Environmental, inspection process clarified and simplified
- 07:12, 11 June 2012 diff hist +311 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: Updated EPG 136.6.4.10.1.
- 07:10, 11 June 2012 diff hist +157 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.10.1 Renovation and Demolition of Structures: Per Environmental, the use of an Asbestos Building Inspector specified (rather than "a certified asbestos inspector")
- 11:02, 8 June 2012 diff hist +31 Category:773 Pipe, Box Culvert and Miscellaneous Drainage Maintenance