User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:05, 17 July 2012 diff hist +20 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated Fig. 136.4.10 with minor changes
- 08:04, 17 July 2012 diff hist +1 m Category:1033 Precast Drainage Units →1033.2 Procedure: minor correction
- 07:41, 17 July 2012 diff hist +311 m LPA:136.7 Design →136.7.5 Innovative Contracting: Per LPA, added links
- 07:33, 17 July 2012 diff hist +253 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: clarification
- 07:31, 17 July 2012 diff hist +12 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.2.3 Utility Status: Per LPA, clarification: "bid opening" replaced with "construction obligation".
- 14:41, 16 July 2012 diff hist 0 N File:402 Contract Leveling Course Guidelines July 16, 2012.doc current
- 14:40, 16 July 2012 diff hist 0 m Category:402 Bituminous Surface Leveling Per Design, CLC Guidelines further revised (the list of pay items was corrected)
- 10:04, 16 July 2012 diff hist 0 N File:Main Page July 16, 2012.jpg current
- 10:03, 16 July 2012 diff hist -1 m Main Page new photo
- 14:22, 13 July 2012 diff hist +142 m Main Page EPG 402
- 13:52, 13 July 2012 diff hist 0 N File:402 CLC Templates July 13, 2012.pdf
- 13:51, 13 July 2012 diff hist 0 N File:402 JSP July 13, 2012.doc current
- 13:50, 13 July 2012 diff hist 0 File:402 Contract Leveling Course Guidelines July 13, 2012.pdf uploaded a new version of "Image:402 Contract Leveling Course Guidelines July 13, 2012.pdf"
- 13:50, 13 July 2012 diff hist 0 N File:402 Contract Leveling Course Guidelines July 13, 2012.pdf
- 13:49, 13 July 2012 diff hist +4 m Category:402 Bituminous Surface Leveling Per Design, updated Contract Leveling Course Guidelines, JSPs for CLC and PDFs of the Contract Leveling Course Plan Templates
- 13:30, 13 July 2012 diff hist +46 m Category:128 Conceptual Studies →128.2 Preventive Maintenance Projects (1R and 2R): added link
- 09:21, 13 July 2012 diff hist -13 m Main Page
- 07:17, 13 July 2012 diff hist -55 m 903.11 Specific Service Signs - Logos →903.11.2 Application (MUTCD Section 2J.02): Per Traffic, "No service type shall appear on more than one sign." removed, since it is no longer true.
- 13:42, 12 July 2012 diff hist +11 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.1 updated
- 13:41, 12 July 2012 diff hist 0 N File:136.9.1 July 2012.xlsx
- 13:40, 12 July 2012 diff hist -15 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated Fig. 136.9.1 with a minor revision
- 11:17, 12 July 2012 diff hist +47 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.18 updated
- 11:15, 12 July 2012 diff hist 0 N File:136.4.18.docx
- 11:15, 12 July 2012 diff hist -28 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, Fig. 136.4.18 updated with minor corrections
- 10:58, 12 July 2012 diff hist +80 m Main Page EPG 238.3.37
- 10:37, 12 July 2012 diff hist +1,760 m 238.3 Route Surveying →238.3.37 Bridge survey information: Per Bridge, guidance for setting valley sections was improved
- 14:54, 11 July 2012 diff hist +11 m 238.3 Route Surveying →238.3.42 Recording accuracy: minor clarification
- 13:31, 11 July 2012 diff hist -274 m Main Page EPG 121.3 STIP
- 13:18, 11 July 2012 diff hist -24 m 121.3 The Statewide Transportation Improvement Program (STIP) Updated STIP links
- 13:18, 11 July 2012 diff hist -12 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) Updated STIP link
- 13:17, 11 July 2012 diff hist -12 m 104.7 Scoping Estimates Updated STIP link
- 13:17, 11 July 2012 diff hist -12 m Category:104 Scope Updated STIP link
- 13:15, 11 July 2012 diff hist +18 m 121.3 The Statewide Transportation Improvement Program (STIP) Updated STIP links
- 13:14, 11 July 2012 diff hist +9 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) Updated STIP link
- 13:13, 11 July 2012 diff hist +9 m 104.7 Scoping Estimates Updated STIP link
- 13:12, 11 July 2012 diff hist +9 m Category:104 Scope Updated STIP link
- 15:26, 10 July 2012 diff hist 0 m Category:606 Guardrail and Guard Cable minor correction
- 13:11, 10 July 2012 diff hist 0 m Main Page
- 12:01, 10 July 2012 diff hist 0 N File:Job Order Contracts July 2012.docx
- 12:00, 10 July 2012 diff hist +10 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated JOC QRG.
- 15:05, 9 July 2012 diff hist +15 m Category:100 GENERAL →100.1.1 MoDOT Organization: Updated MoDOT org chart
- 14:15, 9 July 2012 diff hist +11 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for a Master Agreement: Per Design, subtitle clarified (replaced Master Agreement with On-Call Hrly Rate)
- 10:33, 9 July 2012 diff hist 0 m Main Page
- 10:12, 9 July 2012 diff hist +1 m Main Page
- 14:16, 6 July 2012 diff hist +1 m Main Page
- 14:14, 6 July 2012 diff hist -78 m Main Page EPG 134
- 13:56, 6 July 2012 diff hist 0 N File:134.5.1.2 July 2012.docx
- 13:56, 6 July 2012 diff hist +20 m Category:134 Engineering Professional Services Per Design, updated Fig. 134.5.1.2 to correctly reference new hourly rate contract figures.
- 13:47, 6 July 2012 diff hist +133 m LPA:136.12 Figures, Glossary and Other Useful Links Updated two figures in EPG 136.4
- 13:44, 6 July 2012 diff hist 0 N File:136.4.17.xlsx current