User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 15:02, 26 July 2012 diff hist +1,019 m 903.9 General Information Signs →903.9.6 Acknowledgment Signs (I9-1, I9-2, I9-2P, I9-3) (MUTCD Section 2H.08): Per Traffic, guidance added for the new Adopt-A-Hwy signs
- 14:45, 26 July 2012 diff hist -1 m 751.50 Standard Detailing Notes →C2. Prestressed Girders, Beams & Panels: minor update
- 13:00, 26 July 2012 diff hist +560 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.83 Warning Lights (MUTCD 6F.83): Additional sequential lighting update, per Traffic
- 12:27, 26 July 2012 diff hist 0 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications: updated link
- 12:26, 26 July 2012 diff hist -10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications: updated link
- 11:22, 26 July 2012 diff hist -443 m Main Page EPG 616.6.83
- 11:06, 26 July 2012 diff hist +300 m 616.8 Typical Applications (MUTCD 6H) Added link to Fig. 616.6.83, Sequential Flashing Warning Light, per Traffic
- 10:51, 26 July 2012 diff hist +91 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.83 Warning Lights (MUTCD 6F.83): Added Fig. 616.6.83, Sequential Flashing Warning Light, per Traffic
- 10:49, 26 July 2012 diff hist 0 N File:616.6.83.jpg current
- 08:35, 26 July 2012 diff hist 0 N File:134.2.2.2 July 2012.doc current
- 08:34, 26 July 2012 diff hist +30 m Category:134 Engineering Professional Services Per Design, updated Fig. 134.2.2.2, Solicitation and Request Letter
- 15:28, 25 July 2012 diff hist +494 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Sequential lighting update
- 15:28, 25 July 2012 diff hist +1,046 m Main Page EPG 147, EPG 616, EPG 450
- 15:18, 25 July 2012 diff hist 0 m 147.1 Alternative Technical Concepts minor correction
- 15:11, 25 July 2012 diff hist 0 N File:148.9.jpg current
- 15:11, 25 July 2012 diff hist -205 m 147.3 Job Order Contracting (JOC) →147.3.8 Deleted JOC Projects: removed superfluous info
- 15:10, 25 July 2012 diff hist 0 N File:148.6.jpg current
- 15:10, 25 July 2012 diff hist 0 N File:148.6 email.jpg current
- 15:10, 25 July 2012 diff hist 0 N File:148.3.jpg
- 15:09, 25 July 2012 diff hist 0 N File:148 asphalt pavement repair.doc current
- 15:09, 25 July 2012 diff hist 0 N File:148 bridge.doc current
- 15:09, 25 July 2012 diff hist 0 N File:148 concrete pavement repair.doc current
- 15:09, 25 July 2012 diff hist 0 N File:148 fence.doc current
- 15:09, 25 July 2012 diff hist 0 N File:148 guard cable.doc current
- 15:08, 25 July 2012 diff hist 0 N File:148 guardrail.doc current
- 15:02, 25 July 2012 diff hist 0 N File:148.jpg current
- 15:01, 25 July 2012 diff hist +14,634 N 147.3 Job Order Contracting (JOC) New page: right|300px MoDOT uses a procurement process called Job Order Contracting (JOC) for traditional on-call maintenance repair contracts, including asphalt and concrete pavem...
- 15:00, 25 July 2012 diff hist +8,248 N 147.2 Add Alternate Bidding New page: ==147.2.1 Purpose of Add Alternate Bidding== In an effort to fully utilize the budget available and maximize the amount of work awarded within a project budget, the district may use a bid...
- 14:59, 25 July 2012 diff hist +65 m Category:100 GENERAL added link
- 14:58, 25 July 2012 diff hist 0 N File:147.3.3.pdf
- 14:58, 25 July 2012 diff hist 0 N File:147.3.2 Rte 65.pdf
- 14:57, 25 July 2012 diff hist 0 N File:147.3.2.pdf
- 14:57, 25 July 2012 diff hist 0 N File:147.3.1.pdf
- 14:56, 25 July 2012 diff hist +10,956 N 147.1 Alternative Technical Concepts New article
- 14:55, 25 July 2012 diff hist +2,538 N Category:147 Innovative Contracting New article, per Design
- 14:46, 25 July 2012 diff hist +822 Category:450 Bituminous Pavement Design New safety edge guidance, per Design
- 14:28, 25 July 2012 diff hist +79 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: added link
- 14:24, 25 July 2012 diff hist +40 m 606.1 Guardrail Added link, and clarified a statement, per EP Administrator
- 09:20, 25 July 2012 diff hist -115 m Main Page EPG 606.2.4.1
- 15:11, 24 July 2012 diff hist -239 m Main Page TM-64 and TM-67
- 14:56, 24 July 2012 diff hist -5,027 m 106.3.2.67 TM-67, Preparation of Concrete for Use in AASHTO T161 Freeze and Thaw TM-67 was deleted, per CM. It is no longer valid. current
- 14:55, 24 July 2012 diff hist -3,080 m 106.3.2.64 TM-64, Void Detection and Undersealing Verification Testing of Concrete Pavement with a Falling Weight Deflectometer TM-64 was deleted, per CM. It is no longer valid.
- 14:52, 24 July 2012 diff hist +248 m 106.3.2.62 TM-62, Prequalification of Dust Suppressants Moved AASHTO T 119 video from deleted EPG 103.6.2.67 TM-67 to this article. current
- 13:56, 24 July 2012 diff hist -85 m Category:1001 General Requirements for Material Per CM, link removed.
- 13:52, 24 July 2012 diff hist -129 m 106.3.2.62 TM-62, Prequalification of Dust Suppressants Per CM, link removed.
- 13:49, 24 July 2012 diff hist +2 m 106.3.2.62 TM-62, Prequalification of Dust Suppressants
- 12:36, 23 July 2012 diff hist 0 N File:134.2.2.5.4 July 2012.doc current
- 12:36, 23 July 2012 diff hist 0 N File:134.5.2 July 2012.docx
- 12:35, 23 July 2012 diff hist 0 N File:134.4.1 July 2012.docx
- 12:35, 23 July 2012 diff hist 0 N File:134.2.2.5.3 July 2012.doc current