User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:33, 9 August 2012 diff hist +234 m 751.50 Standard Detailing Notes →A4c. Miscellaneous: Per Bridge, additional clarification
- 14:21, 9 August 2012 diff hist 0 m Main Page
- 14:18, 9 August 2012 diff hist +109 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, Fig. 136.9.3 (Federal Project Bid Proposal Boilerplate) updated
- 14:15, 9 August 2012 diff hist 0 N File:136.9.3 Aug 2012.doc
- 14:15, 9 August 2012 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, Fig. 136.9.3 (Federal Project Bid Proposal Boilerplate) updated
- 13:59, 9 August 2012 diff hist 0 N File:Main Page 3 Aug 9, 2012.jpg current
- 13:59, 9 August 2012 diff hist 0 N File:Main Page 2 Aug 9, 2012.jpg current
- 13:58, 9 August 2012 diff hist 0 N File:Main Page Aug 9, 2012.jpg current
- 13:58, 9 August 2012 diff hist -128 m Main Page new photos
- 11:03, 9 August 2012 diff hist -251 m Main Page EPG 1020.4
- 11:00, 9 August 2012 diff hist +45 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →Table 1020.4.17 Tensile Strength of Lock Seams: minor adjustment
- 10:58, 9 August 2012 diff hist -2 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →Table 1020.4.17 Tensile Strength of Lock Seams: Per CM, corrected Table 1020.4.17
- 10:46, 9 August 2012 diff hist +10 m 903.6 Warning Signs updated links
- 10:43, 9 August 2012 diff hist +1 m 903.6 Warning Signs Updated links
- 10:35, 9 August 2012 diff hist -545 m Main Page EPG 751.2.1.1
- 10:31, 9 August 2012 diff hist +700 m 751.2 Loads →751.2.1.1 Dead Load: Per Bridge, updated table of unit weights of dead load to conform with AASHTO Table 3.5.1-1
- 10:06, 9 August 2012 diff hist +183 m 751.22 Prestressed Concrete I Girders →751.22.2.3 Flexure: Clarification of A1 bar for use in design, per Bridge
- 10:00, 9 August 2012 diff hist -23 m 751.50 Standard Detailing Notes Per Bridge, minor corrections
- 09:51, 9 August 2012 diff hist -156 m 751.13 Expansion Joint Systems →751.13.4.5 Barrier Curb Details: Per Bridge, removed figure as a minor correction
- 08:58, 9 August 2012 diff hist -1,878 m 751.22 Prestressed Concrete I Girders →751.22.3.18 Miscellaneous: Clarification and linking to spec book for dimensional tolerance, per Bridge
- 08:23, 9 August 2012 diff hist +329 m Main Page Safety Edges
- 07:58, 9 August 2012 diff hist +52 m Category:450 Bituminous Pavement Design →450.9 Safety Edge: Per Design, revised reference to "Safety Edge SM"
- 07:54, 9 August 2012 diff hist 0 N File:402 Contract Leveling Course Guidelines July 16, 2012a.doc current
- 07:52, 9 August 2012 diff hist +1 m Category:402 Bituminous Surface Leveling minor update to Safety Edge references in CLC guidelines, per Design
- 07:25, 3 August 2012 diff hist 0 N File:R10-18aP.jpg current
- 07:25, 3 August 2012 diff hist 0 N File:R10-18a.jpg current
- 07:25, 3 August 2012 diff hist +1,609 m 903.5 Regulatory Signs Per Traffic, Photo enforced signing info added
- 14:46, 2 August 2012 diff hist -1 m 903.9 General Information Signs →903.9.20.2 College Emblem Signing (grade-separated interchanges only): minor correction
- 14:38, 2 August 2012 diff hist 0 N File:110.2 checklist July 2012.pdf
- 14:38, 2 August 2012 diff hist +5 m Category:110 State and Federal Wage Rates and Other Requirements →110.2 Federal-Aid Projects (Guidance for Sec 110.2): Per ECR, "Report of On-Site Bulletin Board Inspection" form updated again.
- 12:43, 2 August 2012 diff hist 0 N File:110.2 checklist 2012.pdf
- 12:43, 2 August 2012 diff hist +5 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, "Report of On-Site Bulletin Board Inspection" form updated.
- 11:18, 2 August 2012 diff hist 0 N File:612.4.pdf
- 11:18, 2 August 2012 diff hist 0 N File:612.4 2012.jpg current
- 09:54, 2 August 2012 diff hist -90 m Main Page EPG 751.50
- 09:49, 2 August 2012 diff hist 0 N File:751.50 Copying Detailing Notes.docx
- 09:49, 2 August 2012 diff hist +1,473 m 751.50 Standard Detailing Notes Per Bridge, added direction on how to copy detailing notes from the EPG to MicroStation drawings.
- 08:50, 2 August 2012 diff hist +2 m Category:142 Missouri One Call System
- 08:10, 2 August 2012 diff hist +330 m Main Page EPG Minor Routes
- 07:46, 2 August 2012 diff hist 0 N File:Modified Shoulder JSP.doc current
- 07:42, 2 August 2012 diff hist +4,468 N Category:Minor Routes Shouldering Project Guidelines New article
- 15:22, 31 July 2012 diff hist +4 m Main Page
- 15:20, 31 July 2012 diff hist -189 m Main Page EPG 139
- 15:16, 31 July 2012 diff hist 0 N File:139.1.4.3 KCIcon RFQ Example.pdf
- 15:16, 31 July 2012 diff hist 0 N File:139.1.3 White Paper Example.doc current
- 15:15, 31 July 2012 diff hist 0 N File:139.1.2.3 Risk Allocation example.doc current
- 15:15, 31 July 2012 diff hist 0 N File:139.1.2.3 Risk Assessment Worksheet Example.pdf
- 15:13, 31 July 2012 diff hist +83,362 m Category:139 Design - Build Per Design, expanded guidance.
- 14:48, 31 July 2012 diff hist -70 m Main Page EPG 101 and EPG 109
- 14:32, 31 July 2012 diff hist +17 m Category:109 Measurement and Payment Per CM, updated Contract Adjustments and Line Item Adjustments QRGs