User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:19, 22 August 2012 diff hist -719 m Main Page EPG 134.5.1
- 11:03, 22 August 2012 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy
- 10:58, 22 August 2012 diff hist +240 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: EPG 136.4.3.1.
- 10:55, 22 August 2012 diff hist +231 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.1 Payments/Invoicing: Per Design, invoice template guidance clarified.
- 10:52, 22 August 2012 diff hist +258 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per Design, invoice template guidance clarified.
- 07:15, 22 August 2012 diff hist +1 m Category:900 TRAFFIC CONTROL
- 07:14, 22 August 2012 diff hist +48 m Category:900 TRAFFIC CONTROL Per Traffic, MUTCD Table I-2 link updated.
- 15:23, 20 August 2012 diff hist -1 m 943.1 Submittals
- 13:10, 20 August 2012 diff hist +59 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.1 revised
- 13:07, 20 August 2012 diff hist 0 N File:136.9.1 August 2012.xlsx
- 13:07, 20 August 2012 diff hist +10 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated Fig. 136.9.1 with a minor revision
- 12:36, 20 August 2012 diff hist -1 m Main Page
- 12:35, 20 August 2012 diff hist 0 N File:Main Page Aug 20, 2012.jpg current
- 12:35, 20 August 2012 diff hist +132 m Main Page new photo
- 10:11, 20 August 2012 diff hist +1 m Main Page
- 09:59, 20 August 2012 diff hist -7 m Main Page EPG 802
- 09:56, 20 August 2012 diff hist +177 m Category:802 Mulching →Material (Sec 802.2): Per Physical Lab, an "acceptance statement" was added to clarify the method of acceptance for mulch overspray.
- 14:36, 16 August 2012 diff hist +34 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria →642.2.5 Crosswalks: Per Traffic, replaced a reference to a brand name with a generic reference
- 13:12, 16 August 2012 diff hist 0 m Main Page
- 15:24, 15 August 2012 diff hist +26 m 751.1 Preliminary Design →751.1.2.18 Soundings (Borings): updated links
- 15:17, 15 August 2012 diff hist -9 m 751.1 Preliminary Design →751.1.2.18 Soundings (Borings): Per Bridge, updated link
- 12:04, 14 August 2012 diff hist -1 m 751.22 Prestressed Concrete I Girders minor corrections
- 11:57, 14 August 2012 diff hist 0 m 751.1 Preliminary Design →751.1.2.7 Girder Type Selection: minor correction
- 11:29, 14 August 2012 diff hist 0 m 751.10 General Superstructure minor clarification
- 11:18, 14 August 2012 diff hist +392 m Main Page EPG 751
- 10:53, 14 August 2012 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4 Reinforcement: correction of figures
- 10:48, 14 August 2012 diff hist +504 m 751.11 Bearings →751.11.1.1 Bearing Types: Per Bridge, addition of girder/beam chairs guidance for clarification
- 10:41, 14 August 2012 diff hist +110 m 751.5 Structural Detailing Guidelines Per Bridge, clarification of guidance
- 10:20, 14 August 2012 diff hist +12 m 751.50 Standard Detailing Notes →G1. Concrete Bents: Per Bridge, minor format improvements
- 10:08, 14 August 2012 diff hist +310 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.3 Wide Flange Beams, Plate Girders & Prestressed I-Girders: Per Bridge, clarified guidance
- 09:55, 14 August 2012 diff hist 0 N File:751.35.4.2 dd.jpg current
- 09:54, 14 August 2012 diff hist 0 N File:751.35.4.2 cc.jpg current
- 09:54, 14 August 2012 diff hist 0 N File:751.35.4.2 bb.jpg current
- 09:54, 14 August 2012 diff hist 0 N File:751.35.4.2 aa.jpg current
- 09:54, 14 August 2012 diff hist 0 N File:751.35.4.2.jpg current
- 09:54, 14 August 2012 diff hist +179 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.2 Prestressed I-Girders: Per Bridge, clarified guidance
- 09:31, 14 August 2012 diff hist 0 N File:751.35.4.1 dd.jpg current
- 09:30, 14 August 2012 diff hist 0 N File:751.35.4.1 cc.jpg current
- 09:30, 14 August 2012 diff hist 0 N File:751.35.4.1 bb.jpg current
- 09:30, 14 August 2012 diff hist 0 N File:751.35.4.1 aa.jpg current
- 09:30, 14 August 2012 diff hist 0 N File:751.35.4.1.jpg current
- 09:29, 14 August 2012 diff hist -31 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4 Reinforcement: Per Bridge, clarification of guidance
- 08:47, 14 August 2012 diff hist +233 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.4 Steel Girder or Beam End Bent: Per Bridge, clarification of guidance
- 08:41, 14 August 2012 diff hist +234 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent: Per Bridge, clarification of guidance
- 08:31, 14 August 2012 diff hist -752 m 751.22 Prestressed Concrete I Girders →751.22.3.10 Closed Intermediate Bent Diaphragms: Per Bridge, guidance clarification for closed intermediate bent diaphragms.
- 08:14, 14 August 2012 diff hist +425 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs: Per Bridge, guidance clarification for girder chairs.
- 07:23, 14 August 2012 diff hist -2 m Category:943 Route Marking Per Design, updated archaic references to Dir. of Operations current
- 07:22, 14 August 2012 diff hist -11 m 171.12 Maintenance Policy History →SIC(A4): Per Design, updated archaic references to Dir. of System Management
- 07:20, 14 August 2012 diff hist -9 m Category:133 Snow and Ice Control →Winter Operations Communication Plan: Per Design, updated archaic references to Dir. of System Management
- 07:04, 14 August 2012 diff hist -7 m Category:129 Public Involvement →129.12 Presentation for Location or Design Approval to the Commission: Per Design, updated archaic references to Dir. of System Management