User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:06, 6 September 2012 diff hist 0 N File:Main Page 2 Sept 6, 2012.jpg current
- 09:05, 6 September 2012 diff hist 0 N File:Main Page Sept 6, 2012.jpg current
- 09:05, 6 September 2012 diff hist +696 m Main Page new photos
- 14:51, 5 September 2012 diff hist -179 m Main Page EPG 230.2.10
- 14:24, 5 September 2012 diff hist +6 m LPA:136.4 Consultant Selection and Consultant Contract Management Another minor update to Fig. 136.4.18
- 14:23, 5 September 2012 diff hist 0 N File:136.4.18 Sept 5, 2012.docx current
- 14:23, 5 September 2012 diff hist +6 m LPA:136.12 Figures, Glossary and Other Useful Links Another minor update to Fig. 136.4.18
- 13:35, 5 September 2012 diff hist 0 N File:134.5.1.5 Sept 2012.xlsx current
- 13:34, 5 September 2012 diff hist +20 m Category:134 Engineering Professional Services Per Design, Fig. 134.5.1.5 updated with a minor revision
- 13:25, 5 September 2012 diff hist +200 m LPA:136.12 Figures, Glossary and Other Useful Links Three figures, 136.4.10, 136.4.17 and 136.4.18, were updated with minor revisions.
- 13:20, 5 September 2012 diff hist +14 m LPA:136.3 Federal Aid Basics →136.3.15.1 Progress Invoices: Per LPA, Fig. 136.4.10 revised with minor update
- 13:18, 5 September 2012 diff hist 0 N File:136.4.18 Sept 2012.docx
- 13:18, 5 September 2012 diff hist 0 N File:136.4.17 Sept 2012.xlsx current
- 13:18, 5 September 2012 diff hist 0 N File:136.4.10 Sept 5, 2012.xlsx current
- 13:17, 5 September 2012 diff hist +6 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated three figures, 136.4.10, 136.4.17 and 136.4.18, with minor revisions.
- 08:47, 5 September 2012 diff hist -685 m Main Page EPG 104.7
- 08:35, 5 September 2012 diff hist 0 N File:Fig 104.7.doc
- 08:35, 5 September 2012 diff hist -116 m 104.7 Scoping Estimates Per Design, updated Cost Est. Guide, Fig. 104.7
- 14:26, 4 September 2012 diff hist +86 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.10
- 14:24, 4 September 2012 diff hist 0 N File:136.4.10 Sept 2012.xlsx current
- 14:24, 4 September 2012 diff hist -8 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LP, Fig. 136.4.10 was updated with a minor revision
- 14:18, 4 September 2012 diff hist -201 m Main Page EPG 642.1
- 13:58, 4 September 2012 diff hist -105 m 642.8 Sidewalk Design Criteria Per Design, updated ADA Checklist, replacing the old "ADA Post-Construction" and "Post-Inspection" Checklist.
- 13:56, 4 September 2012 diff hist +283 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.4
- 13:52, 4 September 2012 diff hist -26 m LPA:136.9 Plans, Specs and Estimates (PSE) Per Design, updated ADA Checklist, replacing the old "ADA Post-Construction" and "Post-Inspection" Checklist.
- 13:49, 4 September 2012 diff hist 0 N File:136.9.4 Sept 2012.doc
- 13:49, 4 September 2012 diff hist -106 m LPA:136.11 Local Public Agency Construction Per Design, updated ADA Checklist, replacing the old "ADA Post-Construction" and "Post-Inspection" Checklist.
- 12:11, 4 September 2012 diff hist 0 N File:236.16.2 map Sept 2012.jpg current
- 12:10, 4 September 2012 diff hist 0 N File:236.16.2 ODA map Sept 2012.pdf
- 12:10, 4 September 2012 diff hist 0 m 236.16 Outdoor Advertising
- 12:06, 4 September 2012 diff hist 0 m 236.16 Outdoor Advertising Per RW, updated ODA map
- 11:31, 4 September 2012 diff hist -236 m Main Page EPG 130
- 11:19, 4 September 2012 diff hist +61 m Category:130 Value Engineering
- 11:17, 4 September 2012 diff hist 0 N File:130 VE.jpg current
- 11:17, 4 September 2012 diff hist +3,826 m Category:130 Value Engineering Per Design, clarifications to bring guidance in line with nationwide VE standards
- 08:34, 4 September 2012 diff hist 0 N File:409 Contract Seal Coat Guidelines Feb 17, 2012.pdf
- 08:33, 4 September 2012 diff hist 0 m Category:409 Seal Coat replaced doc with pdf file of Contract Seal Coat Guidelines
- 14:29, 31 August 2012 diff hist -51 m Main Page EPG 101, QRGs
- 14:01, 31 August 2012 diff hist 0 m Category:239 Construction Inspection Guidelines for Final Plans →239.10.1 Pay Quantity (DWR) Entries: Per CM, updated a QRG
- 14:00, 31 August 2012 diff hist +2 m Category:109 Measurement and Payment Per CM, updated a QRG
- 13:58, 31 August 2012 diff hist 0 m Category:105 Control of Work →105.9.3 Daily Work Reports: Per CM, updated a QRG
- 13:55, 31 August 2012 diff hist 0 N File:Subcontracts Aug 2012.docx
- 13:55, 31 August 2012 diff hist 0 N File:Daily Work Reports Aug 2012.docx
- 13:55, 31 August 2012 diff hist 0 N File:Contractor Pay Estimates.docx
- 13:54, 31 August 2012 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated three QRGs
- 10:21, 31 August 2012 diff hist -456 m 616.23 Traffic Control for Field Operations Traffic has deleted references to incident management, permit and utility operations in this article
- 10:12, 31 August 2012 diff hist +146 m 822.6 Hay and Other Crops on the Right of Way Per Bridge, updated link to Form M-460
- 07:33, 31 August 2012 diff hist -646 m Category:202 Removal of Buildings and Structures →202.5.1 Tree Counting.: Per CM, removed archaic guidance and replaced it with a reference to Trees for Tomorrow
- 10:10, 30 August 2012 diff hist +148 m Main Page EPG 107
- 10:01, 30 August 2012 diff hist +289 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: EPG 136.4