User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:24, 7 September 2012 diff hist +24 m 616.14 Work Zone Safety and Mobility Policy Per Transportation Planning, updated Major Highways map
- 10:20, 7 September 2012 diff hist +32 m 606.1 Guardrail Per Transportation Planning, updated Major Highways map
- 10:19, 7 September 2012 diff hist +32 m Category:503 Bridge Approach Slabs Per Transportation Planning, updated Major Highways map
- 10:18, 7 September 2012 diff hist +32 m 236.13 Designing Right of Way Plans Per Transportation Planning, updated Major HIghways map
- 10:17, 7 September 2012 diff hist +32 m Category:232 Facility Selection Per Transportation Planning, updated Major Highways map
- 10:16, 7 September 2012 diff hist +32 m 231.4 Shoulder Width Per Transportation Planning, updated Major Highways map
- 10:16, 7 September 2012 diff hist +32 m Category:170 Maintenance Activity Planning Guidelines Per Transportation Planning, updated Major Highways map
- 10:15, 7 September 2012 diff hist +128 m Category:144 Practical Operations Per Transportation Planning, updated Major Highways map
- 10:13, 7 September 2012 diff hist +32 m 133.5 Operator’s Guide for Anti-Icing Per Transportation Planning, updated Major Highways map
- 10:12, 7 September 2012 diff hist +32 m Category:Safe and Sound →Pavements and Depth Transitions: Per Transportation Planning, updated Major Highways map
- 08:12, 7 September 2012 diff hist -175 m Category:134 Engineering Professional Services →134.5.2 Supplemental Agreements: Per Design, a minor clarification
- 11:25, 6 September 2012 diff hist +67 m Main Page EPG 1020.2.5.1
- 11:21, 6 September 2012 diff hist +190 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.2.5.1 Mill and Factory Inspection: Per CM, third paragraph revised due to errors in mil thickness of coating to harmonize with the ASTM standard referenced.
- 09:16, 6 September 2012 diff hist -14 m Main Page
- 09:06, 6 September 2012 diff hist 0 N File:Main Page 4 Sept 6, 2012.jpg current
- 09:06, 6 September 2012 diff hist 0 N File:Main Page 3 Sept 6, 2012.jpg current
- 09:06, 6 September 2012 diff hist 0 N File:Main Page 2 Sept 6, 2012.jpg current
- 09:05, 6 September 2012 diff hist 0 N File:Main Page Sept 6, 2012.jpg current
- 09:05, 6 September 2012 diff hist +696 m Main Page new photos
- 14:51, 5 September 2012 diff hist -179 m Main Page EPG 230.2.10
- 14:24, 5 September 2012 diff hist +6 m LPA:136.4 Consultant Selection and Consultant Contract Management Another minor update to Fig. 136.4.18
- 14:23, 5 September 2012 diff hist 0 N File:136.4.18 Sept 5, 2012.docx current
- 14:23, 5 September 2012 diff hist +6 m LPA:136.12 Figures, Glossary and Other Useful Links Another minor update to Fig. 136.4.18
- 13:35, 5 September 2012 diff hist 0 N File:134.5.1.5 Sept 2012.xlsx current
- 13:34, 5 September 2012 diff hist +20 m Category:134 Engineering Professional Services Per Design, Fig. 134.5.1.5 updated with a minor revision
- 13:25, 5 September 2012 diff hist +200 m LPA:136.12 Figures, Glossary and Other Useful Links Three figures, 136.4.10, 136.4.17 and 136.4.18, were updated with minor revisions.
- 13:20, 5 September 2012 diff hist +14 m LPA:136.3 Federal Aid Basics →136.3.15.1 Progress Invoices: Per LPA, Fig. 136.4.10 revised with minor update
- 13:18, 5 September 2012 diff hist 0 N File:136.4.18 Sept 2012.docx
- 13:18, 5 September 2012 diff hist 0 N File:136.4.17 Sept 2012.xlsx current
- 13:18, 5 September 2012 diff hist 0 N File:136.4.10 Sept 5, 2012.xlsx current
- 13:17, 5 September 2012 diff hist +6 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated three figures, 136.4.10, 136.4.17 and 136.4.18, with minor revisions.
- 08:47, 5 September 2012 diff hist -685 m Main Page EPG 104.7
- 08:35, 5 September 2012 diff hist 0 N File:Fig 104.7.doc
- 08:35, 5 September 2012 diff hist -116 m 104.7 Scoping Estimates Per Design, updated Cost Est. Guide, Fig. 104.7
- 14:26, 4 September 2012 diff hist +86 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.10
- 14:24, 4 September 2012 diff hist 0 N File:136.4.10 Sept 2012.xlsx current
- 14:24, 4 September 2012 diff hist -8 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LP, Fig. 136.4.10 was updated with a minor revision
- 14:18, 4 September 2012 diff hist -201 m Main Page EPG 642.1
- 13:58, 4 September 2012 diff hist -105 m 642.8 Sidewalk Design Criteria Per Design, updated ADA Checklist, replacing the old "ADA Post-Construction" and "Post-Inspection" Checklist.
- 13:56, 4 September 2012 diff hist +283 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.4
- 13:52, 4 September 2012 diff hist -26 m LPA:136.9 Plans, Specs and Estimates (PSE) Per Design, updated ADA Checklist, replacing the old "ADA Post-Construction" and "Post-Inspection" Checklist.
- 13:49, 4 September 2012 diff hist 0 N File:136.9.4 Sept 2012.doc
- 13:49, 4 September 2012 diff hist -106 m LPA:136.11 Local Public Agency Construction Per Design, updated ADA Checklist, replacing the old "ADA Post-Construction" and "Post-Inspection" Checklist.
- 12:11, 4 September 2012 diff hist 0 N File:236.16.2 map Sept 2012.jpg current
- 12:10, 4 September 2012 diff hist 0 N File:236.16.2 ODA map Sept 2012.pdf
- 12:10, 4 September 2012 diff hist 0 m 236.16 Outdoor Advertising
- 12:06, 4 September 2012 diff hist 0 m 236.16 Outdoor Advertising Per RW, updated ODA map
- 11:31, 4 September 2012 diff hist -236 m Main Page EPG 130
- 11:19, 4 September 2012 diff hist +61 m Category:130 Value Engineering
- 11:17, 4 September 2012 diff hist 0 N File:130 VE.jpg current