User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:16, 17 September 2012 diff hist +3 m Other Aspects of Pavement Design →Plans and Estimates for Projects with Alternate Pavements: minor corrections
- 10:47, 12 September 2012 diff hist +315 m Main Page EPG 409
- 10:40, 12 September 2012 diff hist 0 N File:409 CSC Templates Sept 2012.pdf
- 10:40, 12 September 2012 diff hist 0 N File:409 JSP Sept 2012.doc
- 10:40, 12 September 2012 diff hist 0 N File:409 Contract Seal Coat Guidelines Sept 2012.doc current
- 10:40, 12 September 2012 diff hist -9 m Category:409 Seal Coat Per Design, the contract seal coat templates, JSP and guidelines updated
- 10:08, 12 September 2012 diff hist -1 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract
- 10:07, 12 September 2012 diff hist -2 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per CM, updated link
- 10:02, 12 September 2012 diff hist 0 m Main Page
- 12:33, 11 September 2012 diff hist 0 m Main Page
- 12:08, 11 September 2012 diff hist +33 m 643.4 Railroads added photo
- 12:06, 11 September 2012 diff hist 0 N File:643.4.jpg current
- 10:45, 10 September 2012 diff hist +225 m Main Page EPG 101, EPG 760
- 10:30, 10 September 2012 diff hist -16 m Category:760 General Construction Inspection for Structures Per CM, updated Bridge Clearance Report Form
- 10:29, 10 September 2012 diff hist -12 m Category:101 Standard Forms →Construction and Materials: Per CM, updated Bridge Clearance Report Form
- 13:38, 7 September 2012 diff hist +50 m 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities →127.27.6 Water Quality/Land Disturbance: updated link.
- 13:34, 7 September 2012 diff hist +205 m Main Page EPG 127.25.4.1
- 13:28, 7 September 2012 diff hist +5 m 127.25 Maintenance Environmental Policies →127.25.4.1 Storm Water Regulations
- 13:26, 7 September 2012 diff hist +69 m 127.25 Maintenance Environmental Policies →127.25.4.1 Storm Water Regulations: Per Env'l, to comply w/ land disturbance permit we must add a note to E&SC plans ID'ing all primary receiving waters w/in project limits or w/in 1 mile of job.
- 10:55, 7 September 2012 diff hist +8 m Main Page Major Highways map
- 10:33, 7 September 2012 diff hist +61 m 822.5 Definitions Per Transportation Planning, updated Major Highways map
- 10:31, 7 September 2012 diff hist +32 m 643.3 Policy, Standards and Regulations Per Transportation Planning, updated Major Highways map
- 10:30, 7 September 2012 diff hist +32 m Category:643 Utility Procedures Per Transportation Planning, updated Major Highways map
- 10:27, 7 September 2012 diff hist +32 m 626.3 Construction Inspection Guidelines for Sec 626 Per Transportation Planning, updated Major Highways map
- 10:26, 7 September 2012 diff hist +64 m Category:626 Rumble Strips Per Transportation Planning, updated Major Highways map
- 10:24, 7 September 2012 diff hist +32 m 620.12 Construction Inspection for Sec 620 Per Transportation Planning, updated Major Routes map
- 10:24, 7 September 2012 diff hist +24 m 616.14 Work Zone Safety and Mobility Policy Per Transportation Planning, updated Major Highways map
- 10:20, 7 September 2012 diff hist +32 m 606.1 Guardrail Per Transportation Planning, updated Major Highways map
- 10:19, 7 September 2012 diff hist +32 m Category:503 Bridge Approach Slabs Per Transportation Planning, updated Major Highways map
- 10:18, 7 September 2012 diff hist +32 m 236.13 Designing Right of Way Plans Per Transportation Planning, updated Major HIghways map
- 10:17, 7 September 2012 diff hist +32 m Category:232 Facility Selection Per Transportation Planning, updated Major Highways map
- 10:16, 7 September 2012 diff hist +32 m 231.4 Shoulder Width Per Transportation Planning, updated Major Highways map
- 10:16, 7 September 2012 diff hist +32 m Category:170 Maintenance Activity Planning Guidelines Per Transportation Planning, updated Major Highways map
- 10:15, 7 September 2012 diff hist +128 m Category:144 Practical Operations Per Transportation Planning, updated Major Highways map
- 10:13, 7 September 2012 diff hist +32 m 133.5 Operator’s Guide for Anti-Icing Per Transportation Planning, updated Major Highways map
- 10:12, 7 September 2012 diff hist +32 m Category:Safe and Sound →Pavements and Depth Transitions: Per Transportation Planning, updated Major Highways map
- 08:12, 7 September 2012 diff hist -175 m Category:134 Engineering Professional Services →134.5.2 Supplemental Agreements: Per Design, a minor clarification
- 11:25, 6 September 2012 diff hist +67 m Main Page EPG 1020.2.5.1
- 11:21, 6 September 2012 diff hist +190 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.2.5.1 Mill and Factory Inspection: Per CM, third paragraph revised due to errors in mil thickness of coating to harmonize with the ASTM standard referenced.
- 09:16, 6 September 2012 diff hist -14 m Main Page
- 09:06, 6 September 2012 diff hist 0 N File:Main Page 4 Sept 6, 2012.jpg current
- 09:06, 6 September 2012 diff hist 0 N File:Main Page 3 Sept 6, 2012.jpg current
- 09:06, 6 September 2012 diff hist 0 N File:Main Page 2 Sept 6, 2012.jpg current
- 09:05, 6 September 2012 diff hist 0 N File:Main Page Sept 6, 2012.jpg current
- 09:05, 6 September 2012 diff hist +696 m Main Page new photos
- 14:51, 5 September 2012 diff hist -179 m Main Page EPG 230.2.10
- 14:24, 5 September 2012 diff hist +6 m LPA:136.4 Consultant Selection and Consultant Contract Management Another minor update to Fig. 136.4.18
- 14:23, 5 September 2012 diff hist 0 N File:136.4.18 Sept 5, 2012.docx current
- 14:23, 5 September 2012 diff hist +6 m LPA:136.12 Figures, Glossary and Other Useful Links Another minor update to Fig. 136.4.18
- 13:35, 5 September 2012 diff hist 0 N File:134.5.1.5 Sept 2012.xlsx current