User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:39, 19 September 2012 diff hist +11 m 751.50 Standard Detailing Notes MInor corrections involving commas
- 09:49, 18 September 2012 diff hist 0 N File:Main Page Sept 18, 2012.jpg current
- 09:49, 18 September 2012 diff hist -535 m Main Page new photo
- 08:53, 18 September 2012 diff hist +514 m Main Page EPG 751.22
- 08:32, 18 September 2012 diff hist +59 m 751.22 Prestressed Concrete I Girders →751.22.2.3 Flexure: added link
- 08:22, 18 September 2012 diff hist +68 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per Bridge, revised note to define the required bond breaker at the edges of NU top flanges to be two layers of 30-lb roofing felt girders
- 08:20, 18 September 2012 diff hist +71 m 751.22 Prestressed Concrete I Girders →751.22.2.3 Flexure: Per Bridge, clarify that for all NU girders the 3/8" diameter strands used for reinforcement support and the top WWR are required and shall be used for A1 reinforcement design.
- 08:04, 18 September 2012 diff hist +40 m 903.6 Warning Signs →903.6.11 Chevron Alignment Sign (W1-8) (MUTCD Section 2C.09): Per Traffic, minor clarification
- 15:26, 17 September 2012 diff hist +1 m Main Page
- 15:11, 17 September 2012 diff hist -9 m Main Page EPG Minor Routes
- 15:02, 17 September 2012 diff hist -1 Category:132 Safety
- 15:01, 17 September 2012 diff hist +1 Category:132 Safety
- 14:22, 17 September 2012 diff hist -74 m Main Page EPG 132
- 14:15, 17 September 2012 diff hist +239 m Category:400 FLEXIBLE PAVEMENT added video
- 14:13, 17 September 2012 diff hist +255 m Category:822 Roadside Vegetation Management added safety video
- 14:12, 17 September 2012 diff hist +17 m Category:144 Practical Operations
- 14:10, 17 September 2012 diff hist +254 m Category:144 Practical Operations →144.4 Mowing Operations Changes: added video
- 14:00, 17 September 2012 diff hist +316 m Category:132 Safety added safety videos
- 13:58, 17 September 2012 diff hist 0 N File:132 Asphalt Operations.wmv current
- 13:04, 17 September 2012 diff hist -1 m Main Page
- 12:21, 17 September 2012 diff hist -14 m LPA:136.1 Introduction →136.1.5 Policy Maintenance and Updates: updated link, per LPA
- 07:30, 17 September 2012 diff hist +227 m 903.5 Regulatory Signs →903.5.5.1 YIELD Sign Applications (MUTCD Section 2B.09): Added link
- 07:21, 17 September 2012 diff hist 0 N File:R16-25.jpg current
- 07:20, 17 September 2012 diff hist +1 m 903.5 Regulatory Signs →903.5.41 STATE LAW MOVE OVER OR SLOW DOWN FOR STOPPED EMERGENCY VEHICLE Sign (R16-25): Per Traffic, updated R16-25 figure
- 07:16, 17 September 2012 diff hist +3 m Other Aspects of Pavement Design →Plans and Estimates for Projects with Alternate Pavements: minor corrections
- 10:47, 12 September 2012 diff hist +315 m Main Page EPG 409
- 10:40, 12 September 2012 diff hist 0 N File:409 CSC Templates Sept 2012.pdf
- 10:40, 12 September 2012 diff hist 0 N File:409 JSP Sept 2012.doc
- 10:40, 12 September 2012 diff hist 0 N File:409 Contract Seal Coat Guidelines Sept 2012.doc current
- 10:40, 12 September 2012 diff hist -9 m Category:409 Seal Coat Per Design, the contract seal coat templates, JSP and guidelines updated
- 10:08, 12 September 2012 diff hist -1 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract
- 10:07, 12 September 2012 diff hist -2 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per CM, updated link
- 10:02, 12 September 2012 diff hist 0 m Main Page
- 12:33, 11 September 2012 diff hist 0 m Main Page
- 12:08, 11 September 2012 diff hist +33 m 643.4 Railroads added photo
- 12:06, 11 September 2012 diff hist 0 N File:643.4.jpg current
- 10:45, 10 September 2012 diff hist +225 m Main Page EPG 101, EPG 760
- 10:30, 10 September 2012 diff hist -16 m Category:760 General Construction Inspection for Structures Per CM, updated Bridge Clearance Report Form
- 10:29, 10 September 2012 diff hist -12 m Category:101 Standard Forms →Construction and Materials: Per CM, updated Bridge Clearance Report Form
- 13:38, 7 September 2012 diff hist +50 m 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities →127.27.6 Water Quality/Land Disturbance: updated link.
- 13:34, 7 September 2012 diff hist +205 m Main Page EPG 127.25.4.1
- 13:28, 7 September 2012 diff hist +5 m 127.25 Maintenance Environmental Policies →127.25.4.1 Storm Water Regulations
- 13:26, 7 September 2012 diff hist +69 m 127.25 Maintenance Environmental Policies →127.25.4.1 Storm Water Regulations: Per Env'l, to comply w/ land disturbance permit we must add a note to E&SC plans ID'ing all primary receiving waters w/in project limits or w/in 1 mile of job.
- 10:55, 7 September 2012 diff hist +8 m Main Page Major Highways map
- 10:33, 7 September 2012 diff hist +61 m 822.5 Definitions Per Transportation Planning, updated Major Highways map
- 10:31, 7 September 2012 diff hist +32 m 643.3 Policy, Standards and Regulations Per Transportation Planning, updated Major Highways map
- 10:30, 7 September 2012 diff hist +32 m Category:643 Utility Procedures Per Transportation Planning, updated Major Highways map
- 10:27, 7 September 2012 diff hist +32 m 626.3 Construction Inspection Guidelines for Sec 626 Per Transportation Planning, updated Major Highways map
- 10:26, 7 September 2012 diff hist +64 m Category:626 Rumble Strips Per Transportation Planning, updated Major Highways map
- 10:24, 7 September 2012 diff hist +32 m 620.12 Construction Inspection for Sec 620 Per Transportation Planning, updated Major Routes map