User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:41, 28 September 2012 diff hist +313 m 127.25 Maintenance Environmental Policies →127.25.4.2 Maintenance Operations in Streams: Per Design, guidance for new USCOE requirements
- 12:39, 28 September 2012 diff hist 0 N File:127.4.1.2 COE Jurisdiction.pdf current
- 12:38, 28 September 2012 diff hist +1,238 m 127.4 Wetlands and Streams Per Design, guidance for new USCOE requirements
- 12:35, 28 September 2012 diff hist -33 m Category:107 Legal Relations and Responsibility to the Public →107.10.2 Section 404 Permits: Per Design, guidance for new USCOE requirements
- 11:03, 28 September 2012 diff hist +5 m 236.7 Negotiation Per RW, updated Form 238.2.17
- 11:03, 28 September 2012 diff hist +5 m 236.3 Administration Per RW, updated Form 238.2.17
- 11:02, 28 September 2012 diff hist +5 m 236.4 Description Writing and Titles Per RW, updated Form
- 10:59, 28 September 2012 diff hist 0 N File:238.2.17 Professional Land Surveyor 2012.doc current
- 10:58, 28 September 2012 diff hist +10 m 238.2 Land Surveying Per RW, updated Form 238.2.17 to accommodate MO Min. Stds. for Property Boundary Surveys
- 08:17, 28 September 2012 diff hist +36 m 127.4 Wetlands and Streams →127.4.1.1 Overview: added link
- 08:02, 27 September 2012 diff hist +92 m 620.1 General (MUTCD Chapter 3A) →620.1.4 Materials (MUTCD Section 3A.04): added link
- 07:58, 27 September 2012 diff hist +156 m 620.1 General (MUTCD Chapter 3A) →620.1.4 Materials (MUTCD Section 3A.04): added link
- 07:52, 27 September 2012 diff hist +141 m Main Page EPG 236.5
- 07:35, 27 September 2012 diff hist -215 m 236.5 Property Management →236.5.28.3 Compensation for Changes in Access: Per RW, guidance corrected to show that now MoDOT will now always perform an appraisal when there is a shift in access to a noncontiguous property.
- 12:42, 26 September 2012 diff hist -26 m Main Page EPG 620
- 12:24, 26 September 2012 diff hist -4,342 m 620.1 General (MUTCD Chapter 3A) →620.1.4 Materials (MUTCD Section 3A.04): Per Traffic, numerous revisions because several non-standard JSPs (including epoxy and high build pavement markings) were combined into std. JSPs.
- 10:43, 26 September 2012 diff hist -1,429 m Category:620 Pavement Marking Per Traffic, numerous revisions because several non-standard JSPs (including epoxy and high build pavement markings) were combined into standard JSPs.
- 10:38, 25 September 2012 diff hist +224 m LPA:136.1 Introduction →136.1.5 Policy Maintenance and Updates: added link
- 10:25, 25 September 2012 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Fig. 136.9.3 revised
- 10:24, 25 September 2012 diff hist +127 m LPA:136.13 LPA Policy Changes Fig. 136.9.3 revision
- 10:22, 25 September 2012 diff hist 0 N File:136.9.3 Sept 2012.doc
- 10:22, 25 September 2012 diff hist +7 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, revised Fig. 136.9.3 by adding a revision date and a statement on project award.
- 10:12, 25 September 2012 diff hist -180 m Main Page New EPG 136.13
- 09:52, 25 September 2012 diff hist -11,666 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.5 Recent Changes to LPA Policy: Moved info to new EPG 136.13.
- 09:48, 25 September 2012 diff hist -42 m LPA:136 Local Public Agency (LPA) Policy Updated link
- 09:47, 25 September 2012 diff hist +11,822 Nm LPA:136.13 LPA Policy Changes Per LPA, moved existing EPG 136.12 info into this new article
- 08:53, 24 September 2012 diff hist -10 m LPA:136.9 Plans, Specs and Estimates (PSE) Updated Fig. 136.9.1, per LPA
- 08:51, 24 September 2012 diff hist 0 N File:136.9.1 Sept 2012.xlsx
- 08:51, 24 September 2012 diff hist +382 m LPA:136.12 Figures, Glossary and Other Useful Links EPG 136.9.4.1.1.15
- 08:44, 24 September 2012 diff hist +138 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.15 Disadvantaged Business Enterprise (DBE) (49 CFR Part 26): Minor clarification, per LPA, about DBE goal applying to entire federally-funded project
- 08:39, 24 September 2012 diff hist 0 N File:Main Page 3 Sept 24, 2012.jpg current
- 08:39, 24 September 2012 diff hist 0 N File:Main Page 2 Sept 24, 2012.jpg current
- 08:38, 24 September 2012 diff hist 0 N File:Main Page Sept 24, 2012.jpg current
- 08:38, 24 September 2012 diff hist -251 m Main Page new photos
- 08:39, 19 September 2012 diff hist +11 m 751.50 Standard Detailing Notes MInor corrections involving commas
- 09:49, 18 September 2012 diff hist 0 N File:Main Page Sept 18, 2012.jpg current
- 09:49, 18 September 2012 diff hist -535 m Main Page new photo
- 08:53, 18 September 2012 diff hist +514 m Main Page EPG 751.22
- 08:32, 18 September 2012 diff hist +59 m 751.22 Prestressed Concrete I Girders →751.22.2.3 Flexure: added link
- 08:22, 18 September 2012 diff hist +68 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per Bridge, revised note to define the required bond breaker at the edges of NU top flanges to be two layers of 30-lb roofing felt girders
- 08:20, 18 September 2012 diff hist +71 m 751.22 Prestressed Concrete I Girders →751.22.2.3 Flexure: Per Bridge, clarify that for all NU girders the 3/8" diameter strands used for reinforcement support and the top WWR are required and shall be used for A1 reinforcement design.
- 08:04, 18 September 2012 diff hist +40 m 903.6 Warning Signs →903.6.11 Chevron Alignment Sign (W1-8) (MUTCD Section 2C.09): Per Traffic, minor clarification
- 15:26, 17 September 2012 diff hist +1 m Main Page
- 15:11, 17 September 2012 diff hist -9 m Main Page EPG Minor Routes
- 15:02, 17 September 2012 diff hist -1 Category:132 Safety
- 15:01, 17 September 2012 diff hist +1 Category:132 Safety
- 14:22, 17 September 2012 diff hist -74 m Main Page EPG 132
- 14:15, 17 September 2012 diff hist +239 m Category:400 FLEXIBLE PAVEMENT added video
- 14:13, 17 September 2012 diff hist +255 m Category:822 Roadside Vegetation Management added safety video
- 14:12, 17 September 2012 diff hist +17 m Category:144 Practical Operations