- 12:30, 18 October 2012 diff hist +1,056 m Category:205 Modified Subgrade →205.2.2.3.6 Physical tests: Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing
- 12:27, 18 October 2012 diff hist +597 m Category:302 Stabilized Permeable Base →302.2.1 Procedure: Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing
- 12:23, 18 October 2012 diff hist -6,111 m Category:123 Federal-Aid Highway Program →123.3.3 Federal-Aid Acceptance Sampling and Testing (FAST): Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing
- 11:13, 18 October 2012 diff hist 0 N File:Job Order Contracts Oct 2012.docx
- 11:12, 18 October 2012 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Job Order Contracts QRG
- 11:02, 18 October 2012 diff hist +4 m 751.10 General Superstructure →751.10.1.7.2 Standard Partial Depth P/C P/S Panel Slab Details Using SIP Forms
- 11:01, 18 October 2012 diff hist +860 751.10 General Superstructure Per Bridge, minor clarifications
- 10:34, 18 October 2012 diff hist +5 m 616.8 Typical Applications (MUTCD 6H) Per Traffic, updated Fig. 616.8.10a to correct a minor error
- 10:33, 18 October 2012 diff hist 0 N File:616.8.10a 2012.pdf
- 10:32, 18 October 2012 diff hist +10 m 616.23 Traffic Control for Field Operations Per Traffic, updated Fig. 616.8.10a to correct a minor error
- 09:57, 18 October 2012 diff hist +6 m Category:1011 Geotextile Updated link
- 14:18, 16 October 2012 diff hist +1 m Main Page
- 14:02, 16 October 2012 diff hist +9 m Main Page
- 14:02, 16 October 2012 diff hist 0 N File:Main Page Oct 16, 2012.jpg current
- 14:01, 16 October 2012 diff hist -139 m Main Page new photo
- 13:40, 16 October 2012 diff hist +3 m Main Page EPG 134
- 13:25, 16 October 2012 diff hist +191 m Category:134 Engineering Professional Services Per Design, clarification in EPG 134.3.4 as to whom to send Pre-Audit info. Also a minor process change in EPG 134.2.2.5
- 07:03, 16 October 2012 diff hist +73 m 907.6 Fatal Crash Reviews Per KC Regional Counsel, replaced opening paragraph
- 14:31, 15 October 2012 diff hist +409 m Main Page EPG 751.10 and EPG 751.50
- 14:13, 15 October 2012 diff hist +617 m 751.50 Standard Detailing Notes →E3. Miscellaneous: Per Bridge, added notes indicating slab bars that may be moved for construction purposes. Revision will make typing barrier bars simpler.
- 13:59, 15 October 2012 diff hist 0 N File:751.10.2.2 cantilever steel structure.jpg current
- 13:58, 15 October 2012 diff hist 0 N File:751.10.2.2 Joint Filler.jpg current
- 13:58, 15 October 2012 diff hist 0 N File:751.10.2.2 cantilever.jpg current
- 13:57, 15 October 2012 diff hist 0 N File:751.10.1.7.jpg current
- 13:57, 15 October 2012 diff hist +1,509 m 751.10 General Superstructure Per Bridge, added details indicating slab bars that may be moved for construction and showing bar clearance to top mat of slab steel info not given before. Revisions will make tying barrier simpler.
- 12:40, 15 October 2012 diff hist +85 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel: added link
- 10:03, 15 October 2012 diff hist 0 N File:236.17 Missouri Control of Junkyards Brochure.pdf
- 10:03, 15 October 2012 diff hist +101 m 236.17 Junkyards →236.17.1 General Information: Per RW, added brochure
- 10:18, 12 October 2012 diff hist 0 N File:Main Page Oct 12, 2012.jpg current
- 10:18, 12 October 2012 diff hist -135 m Main Page new photo
- 09:20, 12 October 2012 diff hist +272 m Main Page EPG 134.5.4
- 09:16, 12 October 2012 diff hist +241 m LPA:136.13 LPA Policy Changes EPG 136.4.3.3
- 09:12, 12 October 2012 diff hist +225 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.3 Consultant Performance Appraisals: Per Design, clarifications on how to document consultant evaluations.
- 09:11, 12 October 2012 diff hist +223 m Category:134 Engineering Professional Services →134.5.4 Consultant Performance Appraisals: Per Design, clarifications on how to document consultant evaluations.
- 08:14, 12 October 2012 diff hist -39 m Demolition and Removal of Improvements →Asbestos Containing Materials: updated link, per SE District resident engineer
- 07:26, 12 October 2012 diff hist -18 m Main Page EPG 1039
- 07:12, 12 October 2012 diff hist -38 m Category:1039 Polymer Products →1039.2.4.2 Sampling of Epoxy Polymer Concrete: Per CM, sampling frequency revised to bring it in line with current practices.
- 12:47, 11 October 2012 diff hist +174 m Main Page EPG 134.2.2.5
- 12:40, 11 October 2012 diff hist 0 N File:134.2.2.2 Oct 2012.doc current
- 12:40, 11 October 2012 diff hist 0 N File:134.2.2.5.1 2012.doc current
- 12:40, 11 October 2012 diff hist +271 m Category:134 Engineering Professional Services Per Design, In Figs.134.2.2.2 and 134.2.2.5, updated the scoring criteria for consultant selection. In EPG 134.2.2.5, clarified guidance about the consultant list.
- 10:05, 11 October 2012 diff hist -6 m Main Page
- 09:21, 11 October 2012 diff hist +148 m Main Page EPG 806.8
- 08:54, 11 October 2012 diff hist +293 m Category:806 Pollution, Erosion and Sediment Control added link
- 08:41, 11 October 2012 diff hist +127 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.2 Site Description and Project-Specific Information: Per CM, the project office should fill out Form 806.8.2 on QC/QA jobs
- 07:57, 11 October 2012 diff hist +85 m LPA:136.13 LPA Policy Changes Per LPA, updated a typo error within Form 136.8.8
- 07:55, 11 October 2012 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated a typo error within Form 136.8.8
- 07:54, 11 October 2012 diff hist 0 N File:136.8.8 2012.doc current
- 07:53, 11 October 2012 diff hist +10 m LPA:136.8 Local Public Agency Land Acquisition Per LPA, updated a typo error within Form 136.8.8
- 07:03, 11 October 2012 diff hist -45 m 751.50 Standard Detailing Notes →A4a. Steel Structures- Nonweathering Steel: Per Bridge, minor clarification of notes