User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:56, 29 October 2012 diff hist 0 N File:Main Page Oct 29, 2012.jpg current
- 13:56, 29 October 2012 diff hist +69 m Main Page new photo
- 10:52, 29 October 2012 diff hist 0 N File:147.6.jpg current
- 10:52, 29 October 2012 diff hist 0 m 147.3 Job Order Contracting (JOC) Per TP, updated figure
- 10:09, 29 October 2012 diff hist 0 N File:146 CUF 2012.pdf
- 10:08, 29 October 2012 diff hist +15 m Category:146 Disadvantaged Business Enterprise (DBE) minor update of the CUF form
- 09:26, 29 October 2012 diff hist -39 m Main Page EPG 236.17
- 09:24, 29 October 2012 diff hist +12,993 m 236.17 Junkyards Per RW, minor clarifications
- 08:40, 29 October 2012 diff hist -225 m Main Page EPG 612.1
- 08:25, 29 October 2012 diff hist +396 m Category:612 Impact Attenuators →612.1 Truck- and Trailer-Mounted Attenuators: Per Traffic, additional guidance about hauling material in the back of a TMA.
- 13:49, 26 October 2012 diff hist 0 N File:902.11 Advance Flasher Figures 2012.doc current
- 13:48, 26 October 2012 diff hist +5 m 902.12 Flashing Beacons (MUTCD Chapter 4L) →902.12.7 Procedures For Advance Beacon Installations by Outside Parties: Updated Fig. 902.11 to correct an EPG article reference.
- 13:19, 26 October 2012 diff hist -5,870 m 751.40 LFD Widening and Repair →751.40.2 Typical Sections of Concrete Repairs: Per Bridge, replaced deck repair and filled joint figures and guidance with links
- 14:31, 25 October 2012 diff hist +30 m Main Page EPG 134
- 14:28, 25 October 2012 diff hist +368 m LPA:136.13 LPA Policy Changes EPG 136.4
- 14:27, 25 October 2012 diff hist 0 N File:Fig. 136.4.14 2012.doc current
- 14:26, 25 October 2012 diff hist +15 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated Fig. 136.4.14 to reflect changing mileage reimbursable rates from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
- 14:22, 25 October 2012 diff hist +64 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.2 Basis of Payment: Per LP, changed the mileage reimbursable rates from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
- 14:20, 25 October 2012 diff hist +64 m Category:134 Engineering Professional Services →134.3.5 Basis of Payment: Per Design, changed the mileage reimbursable rates from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
- 13:55, 25 October 2012 diff hist -2 m 751.50 Standard Detailing Notes →A4b. Steel Structures- Weathering Steel: Per Bridge, minor correction
- 13:23, 25 October 2012 diff hist 0 m Main Page
- 10:43, 24 October 2012 diff hist 0 N File:Figure 903.2.26.1 2012.jpg current
- 10:43, 24 October 2012 diff hist +5 m 903.2 Extent of Signing →903.2.26 Location Standardization (MUTCD Section 2A.16): Per Traffic, updated figure to correspond to EPG guidance
- 15:06, 23 October 2012 diff hist -131 m 903.6 Warning Signs →903.6.6 Placement of Warning Signs (MUTCD Section 2C.05)
- 15:04, 23 October 2012 diff hist +30 m Main Page EPG 903.6.6
- 14:48, 23 October 2012 diff hist +10 m 903.6 Warning Signs →903.6.6 Placement of Warning Signs (MUTCD Section 2C.05)
- 14:46, 23 October 2012 diff hist +433 m 903.6 Warning Signs →903.6.6 Placement of Warning Signs (MUTCD Section 2C.05): Per Traffic, added a statement reiterating useful guidance for the districts
- 14:36, 23 October 2012 diff hist -11 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.46 STEEL PLATE AHEAD Sign (WO8-24) (MUTCD 6F.46): Per Traffic, minor clarification
- 07:08, 23 October 2012 diff hist +314 m LPA:136.13 LPA Policy Changes Fig. 136.12 removed
- 07:05, 23 October 2012 diff hist -101 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.3.1 Commonly Used Forms: Per LPA, removed "Fig. 136.12 Sample Form for Submitting Invoices". This form is out-of-date and has been relabeled elsewhere.
- 13:49, 22 October 2012 diff hist +2 m LPA:136.13 LPA Policy Changes
- 13:48, 22 October 2012 diff hist +113 LPA:136.13 LPA Policy Changes Fig. 136.9.12
- 13:47, 22 October 2012 diff hist -2 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, slightly modified cross slope compliance guidance in Fig. 136.9.12
- 13:46, 22 October 2012 diff hist 0 N File:136.9.12 Oct 2012.doc current
- 13:46, 22 October 2012 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, slightly modified cross slope compliance guidance in Fig. 136.9.12
- 11:21, 22 October 2012 diff hist -31 m Main Page EPG 101
- 10:53, 22 October 2012 diff hist 0 N File:Job Order Contracts Oct 22, 2012.docx
- 10:52, 22 October 2012 diff hist 0 N File:101 Request for Transfer of Inpsected Materials.pdf
- 10:51, 22 October 2012 diff hist -35 m Category:101 Standard Forms Per CM, updated two forms. One of the forms, "Request for Transfer of Inspected Materials", was completely replaced with new form with same title.
- 15:02, 19 October 2012 diff hist +6 m Main Page
- 13:30, 19 October 2012 diff hist 0 m Main Page
- 14:19, 18 October 2012 diff hist 0 N File:104.11 Completed SIMS form 2012.pdf
- 14:18, 18 October 2012 diff hist +2 m 104.11 Project Scoping Documentation Updated completed SIMS form
- 14:13, 18 October 2012 diff hist +84 m Main Page
- 13:24, 18 October 2012 diff hist 0 N File:Main Page 3 Oct 18, 2012.jpg current
- 13:24, 18 October 2012 diff hist 0 N File:Main Page 2 Oct 18, 2012.jpg current
- 13:24, 18 October 2012 diff hist 0 N File:Main Page Oct 18, 2012.jpg current
- 13:23, 18 October 2012 diff hist -51 m Main Page new photos
- 12:57, 18 October 2012 diff hist +95 m Main Page EPG 616.23, QRG, EPG FAST
- 12:38, 18 October 2012 diff hist -1,131 m Federal-Aid Acceptance Sampling and Testing Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing approach on "On-system" work. current