User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:03, 18 December 2012 diff hist +11 m Main Page
- 10:02, 18 December 2012 diff hist -12 m 903.5 Regulatory Signs →Table 903.5.3 Regulatory Sign and Plaque Sizes
- 10:00, 18 December 2012 diff hist 0 N File:R10-30.jpg current
- 09:59, 18 December 2012 diff hist 0 N File:R10-15.jpg current
- 09:59, 18 December 2012 diff hist +437 m 903.5 Regulatory Signs Per Traffic, general clarifications to EPG 903.5.30.
- 08:33, 18 December 2012 diff hist 0 Main Page
- 08:25, 18 December 2012 diff hist -159 m Main Page EPG 606.2.3
- 15:32, 17 December 2012 diff hist 0 m Main Page
- 08:43, 14 December 2012 diff hist 0 m Main Page
- 08:39, 14 December 2012 diff hist 0 N File:Main Page Dec 14, 2012.jpg current
- 08:39, 14 December 2012 diff hist -74 m Main Page new photo
- 11:48, 13 December 2012 diff hist 0 N File:Main Page 4 Dec 13, 2012.jpg current
- 11:48, 13 December 2012 diff hist +54 m Main Page new photo
- 08:11, 13 December 2012 diff hist -1 Main Page
- 08:10, 13 December 2012 diff hist +39 m Main Page
- 16:09, 12 December 2012 diff hist +308 m 106.19 Materials Acceptance →106.19.2.3 Leftover Material: Per CM, clarification
- 15:57, 12 December 2012 diff hist 0 N File:Main Page 3 Dec 12, 2012.jpg current
- 15:57, 12 December 2012 diff hist +653 m Main Page EPG 172
- 15:04, 12 December 2012 diff hist -487 m Category:172 Maintenance Facility Performance Expectations Environmental Compliance Per Environmental, minor clarifications and added a link to tools to assist with SPCC plan development.
- 08:46, 12 December 2012 diff hist 0 N File:Main Page Dec 12, 2012.jpg current
- 08:45, 12 December 2012 diff hist -122 m Main Page new photo
- 14:43, 11 December 2012 diff hist -54 m Main Page EPG 134
- 14:27, 11 December 2012 diff hist +930 m Category:134 Engineering Professional Services Per Design, added numerous group email addresses as well as an adjustment in the distribution and copies of executed contracts.
- 15:40, 10 December 2012 diff hist +6 m 902.3 Traffic Control Signal Needs Studies (MUTCD Chapter 4C) Per Traffic, updated link
- 13:54, 10 December 2012 diff hist -8 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per Design, forms presented in numerical order
- 12:15, 10 December 2012 diff hist +101 m Main Page EPG 108.11
- 12:01, 10 December 2012 diff hist +284 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): added links
- 11:59, 10 December 2012 diff hist +141 m 104.13 Construction Inspection Guidance for Sec 104 →Concept Proposal: added link
- 11:53, 10 December 2012 diff hist +1,717 m Category:108 Prosecution and Progress →108.11 Termination of Contract for Convenience of the Commission: Per CM, added guidance for more statewide consistency in resolving payment for leftover material.
- 09:05, 10 December 2012 diff hist +526 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.11
- 09:00, 10 December 2012 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 09:00, 10 December 2012 diff hist 0 N File:136.9.3 Dec 2012.doc
- 08:59, 10 December 2012 diff hist +15 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LP Administrator, EPG 136.9.1.1.11 updated (bid proposal must state that the E-verify affidavit and MOU must be submitted prior to award of the contract). Also Fig. 136.9.3 clarified.
- 08:28, 10 December 2012 diff hist 0 N File:139 Manchester Trafficway.jpg current
- 08:28, 10 December 2012 diff hist +290 m Category:139 Design - Build added link
- 15:58, 6 December 2012 diff hist +236 m 903.3 Ground-Mounted Sign Supports →903.3.1 Post-Mounted Sign Installation: Per Traffic, minor clarification
- 09:12, 6 December 2012 diff hist +103 m Main Page EPG 234.6.2.2.14
- 08:56, 6 December 2012 diff hist 0 N File:234.6.2.2.14 DDI.jpg current
- 08:55, 6 December 2012 diff hist +1,049 m 234.6 Diverging Diamond Interchanges →234.6.2.2.14 Signing: Per Traffic, additional guidance about the new DDI warning sign assembly
- 15:38, 5 December 2012 diff hist +153 m LPA:136.13 LPA Policy Changes Fig. 136.9.1
- 15:37, 5 December 2012 diff hist -2 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per LPA, updated Fig. 136.9.1 with a minor revision
- 15:36, 5 December 2012 diff hist 0 N File:136.9.1 Dec 5, 2012.xlsx
- 15:34, 5 December 2012 diff hist -10 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated Fig. 136.9.1 with a minor revision
- 11:26, 5 December 2012 diff hist +62 m Main Page
- 11:18, 5 December 2012 diff hist +112 m 903.18 Signing for School Areas →903.19.13 School Bus Stop Ahead Sign (S3-1) (MUTCD Section 7B.13): Per Traffic, minor clarification
- 10:47, 5 December 2012 diff hist 0 N File:Main Page Dec 5, 2012a.jpg current
- 10:46, 5 December 2012 diff hist 0 N File:Main Page Dec 5, 2012.jpg current
- 10:46, 5 December 2012 diff hist 0 N File:Main Page Dec 5, 2012b.jpg current
- 10:45, 5 December 2012 diff hist +350 m Main Page new photos
- 09:32, 5 December 2012 diff hist +414 m Main Page EPG 903.6