User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:02, 8 February 2013 diff hist 0 N File:147 concrete pavement repair Feb 2013.doc current
- 11:02, 8 February 2013 diff hist 0 N File:147 fence Feb 2013.doc current
- 11:01, 8 February 2013 diff hist 0 N File:147 guard cable Feb 2013.doc current
- 11:01, 8 February 2013 diff hist 0 N File:147 guardrail Feb 2013.doc current
- 11:01, 8 February 2013 diff hist +39 m 147.3 Job Order Contracting (JOC) Per Design, additional updates to all 6 JSPs
- 16:15, 7 February 2013 diff hist +44 m Main Page
- 15:25, 7 February 2013 diff hist +1,281 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per ECR, additional "certified payroll exceptions" guidance and links for the reader's convenience added
- 13:34, 7 February 2013 diff hist -28 m Main Page
- 11:03, 7 February 2013 diff hist 0 N File:Main Page 3 Feb 7, 2013.jpg current
- 11:03, 7 February 2013 diff hist 0 N File:Main Page 2 Feb 7, 2013.jpg current
- 11:03, 7 February 2013 diff hist 0 N File:Main Page Feb 7, 2013.jpg current
- 11:02, 7 February 2013 diff hist +248 m Main Page new photos
- 15:23, 6 February 2013 diff hist 0 m Main Page
- 13:07, 6 February 2013 diff hist -62 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): "Electronic submittal of certified payrolls is not permitted" was deleted. This deletion should have been part of the 1/28/13 revision
- 09:47, 6 February 2013 diff hist -290 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, since we no longer allow contractors to put entire SSNs on the payrolls, we eliminated the problem of securing this confidential information. Thus, two additional sentences deleted.
- 15:18, 5 February 2013 diff hist +105 m Main Page EPG 110.3.1
- 15:01, 5 February 2013 diff hist +249 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Wage Interviews: Per CM, since the SiteManager Policy & Procedure Manual is no longer used, new guidance gives direction on how wage rate interviews should be documented in SiteManager.
- 12:24, 5 February 2013 diff hist -6 m Main Page
- 12:23, 5 February 2013 diff hist +1 m Main Page
- 12:22, 5 February 2013 diff hist -659 m Main Page EPG 147.3
- 12:19, 5 February 2013 diff hist +1,505 m 147.3 Job Order Contracting (JOC) Per Design, in E 147.3.5, a minor clarification for contract extensions. Also, E 147.3.9 is new guidance for the change order approval process.
- 10:13, 5 February 2013 diff hist 0 m Main Page
- 10:11, 5 February 2013 diff hist 0 N File:Main Page 3 Feb 5, 2013.jpg current
- 10:10, 5 February 2013 diff hist -266 m Main Page
- 08:03, 5 February 2013 diff hist 0 N File:147 asphalt pavement repair 2013.doc current
- 08:03, 5 February 2013 diff hist 0 N File:147 bridge 2013.doc current
- 08:03, 5 February 2013 diff hist 0 N File:147 concrete pavement repair 2013.doc current
- 08:03, 5 February 2013 diff hist +15 m 147.3 Job Order Contracting (JOC) Per Design, additional updates to three JSPs
- 16:24, 4 February 2013 diff hist +201 m Main Page EPG 147.3
- 16:20, 4 February 2013 diff hist 0 N File:147 asphalt pavement repair.doc current
- 16:19, 4 February 2013 diff hist 0 N File:147 bridge.doc current
- 16:19, 4 February 2013 diff hist 0 N File:147 concrete pavement repair.doc current
- 16:19, 4 February 2013 diff hist 0 N File:147 fence.doc current
- 16:19, 4 February 2013 diff hist 0 N File:147 guard cable.doc current
- 16:19, 4 February 2013 diff hist 0 N File:147 guardrail.doc current
- 16:19, 4 February 2013 diff hist +509 m 147.3 Job Order Contracting (JOC) Per Design, JSPs updated, deadlines adjusted and guidance on how to increase the performance contract bond.
- 11:54, 4 February 2013 diff hist +106 m LPA:136.13 LPA Policy Changes Fig. 136.4.11
- 11:53, 4 February 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Fig. 136.4.11
- 11:52, 4 February 2013 diff hist 0 N File:136.4.11 Feb 2013.doc current
- 11:52, 4 February 2013 diff hist +8 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, in Fig. 136.9.11, added the conflict of interest line item.
- 11:38, 4 February 2013 diff hist -85 m 751.14 Steel Superstructure →751.14.5.9.1 Drip Bar Guidance: Per Bridge, removed "See Bridge Development Section for details."
- 11:31, 4 February 2013 diff hist +19 m LPA:136.7 Design →136.7.4 Engineer’s Estimate: Updated link
- 11:24, 4 February 2013 diff hist -27 m Main Page EPG 136.1.2.2
- 11:13, 4 February 2013 diff hist +406 m LPA:136.13 LPA Policy Changes EPG 136.1.2.2
- 11:10, 4 February 2013 diff hist -99 m LPA:136.1 Introduction →136.1.2.2 Project Sponsor Eligibility: Per LPA, the definition of an eligible sponsor for federal aid transportation projects was clarified.
- 10:24, 1 February 2013 diff hist +158 m LPA:136.13 LPA Policy Changes Figs. 136.9.1 and 136.9.12
- 10:22, 1 February 2013 diff hist -7 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.1
- 10:21, 1 February 2013 diff hist 0 N File:136.9.1 2013.xlsx
- 10:21, 1 February 2013 diff hist -291 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, Fig. 136.9.1 updated to remove the requirement for ADA certification. Also, Fig. 136.9.12 (ADA Certification) deleted.
- 10:07, 1 February 2013 diff hist +304 m Main Page EPG 134