User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:50, 13 February 2013 diff hist -175 m Main Page QRG
- 08:27, 13 February 2013 diff hist 0 N File:Terminal Services-Remote Desktop Connection.docx
- 08:27, 13 February 2013 diff hist 0 N File:Sample Record General 2013.docx
- 08:27, 13 February 2013 diff hist -8 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated two QRGs due to minor errors in one QRG and to coordinate with the latest SiteManager upgrade.
- 08:16, 13 February 2013 diff hist -59 m Category:108 Prosecution and Progress →108.8 Liquidated Damages for Failure or Delay in Completing Work on Time: Per CM, corrected link
- 12:14, 11 February 2013 diff hist -1 m Main Page
- 09:25, 11 February 2013 diff hist 0 m 751.23 Prestressed Concrete Double Tee Girders →751.23.1.1 Material Properties: Per Bridge, corrected Optional concrete strand area (to 0.217 sq.in.)
- 16:17, 8 February 2013 diff hist -3 m Main Page
- 15:31, 8 February 2013 diff hist 0 m Main Page
- 15:30, 8 February 2013 diff hist 0 N File:Main Page Bridge 4 Feb 8, 2013.jpg current
- 15:30, 8 February 2013 diff hist 0 N File:Main Page Bridge 3 Feb 8, 2013.jpg current
- 15:30, 8 February 2013 diff hist 0 N File:Main Page Bridge 2 Feb 8, 2013.jpg current
- 15:29, 8 February 2013 diff hist 0 N File:Main Page Bridge 1 Feb 8, 2013.jpg current
- 15:29, 8 February 2013 diff hist -36 m Main Page new photos
- 14:52, 8 February 2013 diff hist +107 m Main Page added link
- 14:12, 8 February 2013 diff hist 0 m Main Page
- 14:10, 8 February 2013 diff hist -143 m Main Page EPG 754
- 14:07, 8 February 2013 diff hist 0 N File:754 BEAP Consultant Listing 2013.pdf
- 14:07, 8 February 2013 diff hist -8 m Category:754 Bridge Engineering Assistance Program (BEAP) Per Bridge, the consultant listing has been updated
- 13:37, 8 February 2013 diff hist -189 m Main Page Change Order QRGs
- 13:23, 8 February 2013 diff hist -2 m Category:109 Measurement and Payment
- 13:21, 8 February 2013 diff hist 0 N File:Change Orders – Value Engineering Feb 2013.doc current
- 13:21, 8 February 2013 diff hist 0 N File:Change Orders – Time Adjustment Feb 2013.docx
- 13:21, 8 February 2013 diff hist 0 N File:Change Orders – Mobilization and Contract Bond Feb 2013.docx
- 13:21, 8 February 2013 diff hist 0 N File:Change orders zero dollar.docx
- 13:20, 8 February 2013 diff hist 0 N File:Change Orders Feb 2013.docx
- 13:19, 8 February 2013 diff hist -14 m Category:109 Measurement and Payment Per CM, updated five QRGs to coordinate with version 3.13 of SiteManager.
- 13:13, 8 February 2013 diff hist -7 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated five QRGs to coordinate with version 3.13 of SiteManager.
- 13:08, 8 February 2013 diff hist +86 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 13:08, 8 February 2013 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Fig. 136.9.3
- 13:05, 8 February 2013 diff hist 0 N File:136.9.3 2013.doc
- 13:05, 8 February 2013 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, Fig. 136.9.3 updated with minor corrections
- 11:02, 8 February 2013 diff hist 0 N File:147 asphalt pavement repair Feb 2013.doc current
- 11:02, 8 February 2013 diff hist 0 N File:147 bridge Feb 2013.doc current
- 11:02, 8 February 2013 diff hist 0 N File:147 concrete pavement repair Feb 2013.doc current
- 11:02, 8 February 2013 diff hist 0 N File:147 fence Feb 2013.doc current
- 11:01, 8 February 2013 diff hist 0 N File:147 guard cable Feb 2013.doc current
- 11:01, 8 February 2013 diff hist 0 N File:147 guardrail Feb 2013.doc current
- 11:01, 8 February 2013 diff hist +39 m 147.3 Job Order Contracting (JOC) Per Design, additional updates to all 6 JSPs
- 16:15, 7 February 2013 diff hist +44 m Main Page
- 15:25, 7 February 2013 diff hist +1,281 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per ECR, additional "certified payroll exceptions" guidance and links for the reader's convenience added
- 13:34, 7 February 2013 diff hist -28 m Main Page
- 11:03, 7 February 2013 diff hist 0 N File:Main Page 3 Feb 7, 2013.jpg current
- 11:03, 7 February 2013 diff hist 0 N File:Main Page 2 Feb 7, 2013.jpg current
- 11:03, 7 February 2013 diff hist 0 N File:Main Page Feb 7, 2013.jpg current
- 11:02, 7 February 2013 diff hist +248 m Main Page new photos
- 15:23, 6 February 2013 diff hist 0 m Main Page
- 13:07, 6 February 2013 diff hist -62 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): "Electronic submittal of certified payrolls is not permitted" was deleted. This deletion should have been part of the 1/28/13 revision
- 09:47, 6 February 2013 diff hist -290 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, since we no longer allow contractors to put entire SSNs on the payrolls, we eliminated the problem of securing this confidential information. Thus, two additional sentences deleted.
- 15:18, 5 February 2013 diff hist +105 m Main Page EPG 110.3.1