User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:25, 14 February 2013 diff hist -2 m Category:1007 Aggregate for Base →1007.3 Records and Reports: updated link
- 14:17, 14 February 2013 diff hist -113 Category:102 Bidding Requirements and Conditions Per DE, revision requires all bids to be submitted electronically regardless of the amount of the project. Exceptions can be made on a case-by-case basis to allow paper bids.
- 14:15, 14 February 2013 diff hist +5,454 Category:601 Field Laboratories Per CM, revision provides guidance for field laboratories and brings current info into compliance with FHWA requirements
- 13:45, 14 February 2013 diff hist 0 N File:805 certification.pdf current
- 13:45, 14 February 2013 diff hist +1 m Category:805 Seeding →Acceptance (Sec 805.4)
- 13:45, 14 February 2013 diff hist +345 Category:805 Seeding Per CM, revision allows acceptance of seed based on certification. Inspectors stamping each bag of seed for acceptance is unnecessary according to Dept of Agriculture
- 13:33, 14 February 2013 diff hist +490 Category:109 Measurement and Payment Per CM, revision clarifies how a force account will be administered and payment made to the Prime contractor and subcontractors.
- 12:12, 14 February 2013 diff hist -1,657 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, numerous archaic Digital Signature QRGs removed. These QRGs were based on the outdated Adobe Pro 7.0.
- 12:15, 13 February 2013 diff hist 0 N File:Main Page Feb 13, 2013.jpg current
- 12:14, 13 February 2013 diff hist -579 m Main Page new photo
- 09:56, 13 February 2013 diff hist -179 m Main Page Three CM forms in EPG 101
- 09:48, 13 February 2013 diff hist +53 m Category:101 Standard Forms →Construction and Materials: installed link
- 09:45, 13 February 2013 diff hist 0 N File:101 Precon letter, state.docx
- 09:45, 13 February 2013 diff hist 0 N File:101 Precon letter, federal.docx
- 09:44, 13 February 2013 diff hist 0 N File:101 Precon letter, federal no trainees.docx
- 09:44, 13 February 2013 diff hist -84 m Category:101 Standard Forms →Construction and Materials: Per CM, three CM forms updated to include Quality Management guidance
- 08:50, 13 February 2013 diff hist -175 m Main Page QRG
- 08:27, 13 February 2013 diff hist 0 N File:Terminal Services-Remote Desktop Connection.docx
- 08:27, 13 February 2013 diff hist 0 N File:Sample Record General 2013.docx
- 08:27, 13 February 2013 diff hist -8 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated two QRGs due to minor errors in one QRG and to coordinate with the latest SiteManager upgrade.
- 08:16, 13 February 2013 diff hist -59 m Category:108 Prosecution and Progress →108.8 Liquidated Damages for Failure or Delay in Completing Work on Time: Per CM, corrected link
- 12:14, 11 February 2013 diff hist -1 m Main Page
- 09:25, 11 February 2013 diff hist 0 m 751.23 Prestressed Concrete Double Tee Girders →751.23.1.1 Material Properties: Per Bridge, corrected Optional concrete strand area (to 0.217 sq.in.)
- 16:17, 8 February 2013 diff hist -3 m Main Page
- 15:31, 8 February 2013 diff hist 0 m Main Page
- 15:30, 8 February 2013 diff hist 0 N File:Main Page Bridge 4 Feb 8, 2013.jpg current
- 15:30, 8 February 2013 diff hist 0 N File:Main Page Bridge 3 Feb 8, 2013.jpg current
- 15:30, 8 February 2013 diff hist 0 N File:Main Page Bridge 2 Feb 8, 2013.jpg current
- 15:29, 8 February 2013 diff hist 0 N File:Main Page Bridge 1 Feb 8, 2013.jpg current
- 15:29, 8 February 2013 diff hist -36 m Main Page new photos
- 14:52, 8 February 2013 diff hist +107 m Main Page added link
- 14:12, 8 February 2013 diff hist 0 m Main Page
- 14:10, 8 February 2013 diff hist -143 m Main Page EPG 754
- 14:07, 8 February 2013 diff hist 0 N File:754 BEAP Consultant Listing 2013.pdf
- 14:07, 8 February 2013 diff hist -8 m Category:754 Bridge Engineering Assistance Program (BEAP) Per Bridge, the consultant listing has been updated
- 13:37, 8 February 2013 diff hist -189 m Main Page Change Order QRGs
- 13:23, 8 February 2013 diff hist -2 m Category:109 Measurement and Payment
- 13:21, 8 February 2013 diff hist 0 N File:Change Orders – Value Engineering Feb 2013.doc current
- 13:21, 8 February 2013 diff hist 0 N File:Change Orders – Time Adjustment Feb 2013.docx
- 13:21, 8 February 2013 diff hist 0 N File:Change Orders – Mobilization and Contract Bond Feb 2013.docx
- 13:21, 8 February 2013 diff hist 0 N File:Change orders zero dollar.docx
- 13:20, 8 February 2013 diff hist 0 N File:Change Orders Feb 2013.docx
- 13:19, 8 February 2013 diff hist -14 m Category:109 Measurement and Payment Per CM, updated five QRGs to coordinate with version 3.13 of SiteManager.
- 13:13, 8 February 2013 diff hist -7 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated five QRGs to coordinate with version 3.13 of SiteManager.
- 13:08, 8 February 2013 diff hist +86 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 13:08, 8 February 2013 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Fig. 136.9.3
- 13:05, 8 February 2013 diff hist 0 N File:136.9.3 2013.doc
- 13:05, 8 February 2013 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, Fig. 136.9.3 updated with minor corrections
- 11:02, 8 February 2013 diff hist 0 N File:147 asphalt pavement repair Feb 2013.doc current
- 11:02, 8 February 2013 diff hist 0 N File:147 bridge Feb 2013.doc current