User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:21, 8 March 2013 diff hist 0 N File:Main Page 2 Mar 8, 2013.jpg current
- 14:20, 8 March 2013 diff hist 0 N File:Main Page Mar 8, 2013.jpg current
- 14:20, 8 March 2013 diff hist -498 m Main Page new photos
- 09:26, 8 March 2013 diff hist 0 N File:612 Impact Attenuators 2013.jpg current
- 09:26, 8 March 2013 diff hist +5 m Category:612 Impact Attenuators new photo, per Traffic
- 16:27, 7 March 2013 diff hist +1 m Main Page
- 16:25, 7 March 2013 diff hist +147 m Main Page EPG 101, etc.
- 16:19, 7 March 2013 diff hist +77 m Category:1047 Corrugated Polyethylene Culvert Pipe →1047.3 Sample Record: Per CM, updated Shipping Report Form link
- 16:18, 7 March 2013 diff hist +77 m Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe →1028.3 Sample Record: Per CM, updated Shipping Report Form link
- 16:17, 7 March 2013 diff hist +147 m Category:1026 Reinforced Concrete Culvert Pipe →1026.4 Report (Records): Per CM, updated Shipping Report Form links
- 16:15, 7 March 2013 diff hist +141 m Category:1024 Corrugated Aluminum Alloy Culvert Pipe and Corrugated Aluminum Alloy Structural Plate →1024.3 Sample Record: Per CM, updated Shipping Report Form links
- 16:13, 7 March 2013 diff hist +74 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.3 Sample Record: Per CM, updated Shipping Report Form links
- 16:11, 7 March 2013 diff hist +147 m 106.15 Pipe Shipping Report Form Per CM, updated Shipping Report Form links
- 16:08, 7 March 2013 diff hist +34 m Category:101 Standard Forms →Materials Related: Per CM, updated Shipping Report Form links
- 13:38, 7 March 2013 diff hist +4 m Main Page bridge, reference
- 13:37, 7 March 2013 diff hist 0 N File:751.8 Reference Guide SBC Mar 2013.doc current
- 13:36, 7 March 2013 diff hist +4 m 751.8 Concrete Box Culverts →751.8.1 General: Per Bridge, a further edited version of the Reference Guide SBC
- 13:24, 7 March 2013 diff hist -56 m Main Page EPG 751.8
- 13:18, 7 March 2013 diff hist 0 N File:751.8 Reference Guide SBC 2013.doc current
- 13:18, 7 March 2013 diff hist -4 m 751.8 Concrete Box Culverts Per Bridge, updated the Reference Guide SBC
- 11:38, 7 March 2013 diff hist +83 m Main Page added links
- 11:32, 7 March 2013 diff hist 0 N File:Main Page 2 Mar 7, 2013.jpg current
- 11:31, 7 March 2013 diff hist +547 m Main Page EPG m132.2 and EPG 907.1
- 11:28, 7 March 2013 diff hist +33 m 132.2 Missouri's Blueprint - A Partnership Toward Zero Deaths added link
- 11:27, 7 March 2013 diff hist +427 m 907.1 Safety Program Guidelines →Criteria for Safety Project Funding: Per FHWA and Traffic & Safety, added guidance to define a High Risk Rural Road, HRRR (thus meeting the MAP-21 requirement).
- 11:21, 7 March 2013 diff hist +390 m 132.2 Missouri's Blueprint - A Partnership Toward Zero Deaths Per FHWA and Traffic & Safety, added guidance to define a HRRR (thus meeting the MAP-21 requirement).
- 09:10, 7 March 2013 diff hist 0 N File:Main Page 6 Mar 7, 2013.jpg current
- 09:09, 7 March 2013 diff hist 0 N File:Main Page 3 Mar 7, 2013.jpg current
- 09:08, 7 March 2013 diff hist -158 m Main Page new photos
- 15:46, 6 March 2013 diff hist +56 m Main Page EPG 1056
- 15:40, 6 March 2013 diff hist +13 m Category:1000 MATERIALS updated EPG 1056's title
- 15:39, 6 March 2013 diff hist -502 m Category:1056 Concrete Tinting Material Per Design, article retitled "Concrete Tinting and Staining Material" to comply with Sec 1056 title. 3191 hits current
- 15:35, 6 March 2013 diff hist +961 Nm Category:1056 Concrete Tinting and Staining Material Per Design, article retitled "Concrete Tinting and Staining Material" to match Sec 1056's title.
- 14:11, 6 March 2013 diff hist +110 m Main Page
- 09:37, 5 March 2013 diff hist +348 m Main Page EPG 134.2.4
- 09:31, 5 March 2013 diff hist -71 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: Per Design, removed the requirement to send executed MOUs to Audits.
- 08:40, 5 March 2013 diff hist +160 m Main Page EPG 100.2.4
- 08:24, 5 March 2013 diff hist -53 m Category:100 GENERAL →100.2.4 Division Operations: Per CM, Form C-13 to be sent by Distr. Final Plans & Reports Proc. to FS Div. FS sends info to FHA. FS processes all payments. Distr. constr. keeps original forms.
- 11:02, 4 March 2013 diff hist -14 m LPA:136.11 Local Public Agency Construction →136.11.9 Commercially Useful Function (CUF): updated link
- 10:22, 4 March 2013 diff hist 0 N File:Main Page 6 Mar 4, 2013.jpg current
- 10:21, 4 March 2013 diff hist 0 N File:Main Page 5 Mar 4, 2013.jpg current
- 10:21, 4 March 2013 diff hist -84 m Main Page new photos
- 14:59, 1 March 2013 diff hist +1 m 320.1 Preliminary Geotechnical Report (PGR) typo correction
- 13:38, 1 March 2013 diff hist +1 m Category:134 Engineering Professional Services
- 13:34, 1 March 2013 diff hist +77 m Category:134 Engineering Professional Services →134.5.2 Supplemental Agreements: added email groups
- 13:33, 1 March 2013 diff hist +205 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution: electronic copies and email groups added to distribution
- 10:08, 1 March 2013 diff hist -2 m Main Page
- 08:06, 1 March 2013 diff hist +5 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Minor clarification, per Bridge
- 16:23, 28 February 2013 diff hist +14 m Main Page
- 16:10, 28 February 2013 diff hist +173 m LPA:136.13 LPA Policy Changes Fig.136.4.9