User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:11, 18 March 2013 diff hist +5 m Category:101 Standard Forms →Construction and Materials: Per CM, updated Pre-Con Letter - State form
- 13:38, 15 March 2013 diff hist 0 m Main Page
- 11:17, 15 March 2013 diff hist +1 m 133.2 Equipment for Snow and Ice Control →133.2.6 Rented Equipment Lighting for Snow and Ice Control
- 11:16, 15 March 2013 diff hist 0 N File:133.2 2.jpg current
- 11:16, 15 March 2013 diff hist +37 m 133.2 Equipment for Snow and Ice Control added photo
- 14:23, 14 March 2013 diff hist 0 N File:600 incidental construction8.jpg current
- 14:23, 14 March 2013 diff hist +59 m Category:600 INCIDENTAL CONSTRUCTION new photo
- 14:15, 14 March 2013 diff hist 0 N File:100 Photo10.jpg current
- 14:15, 14 March 2013 diff hist 0 N File:100 Photo9.jpg current
- 14:15, 14 March 2013 diff hist +68 m Category:100 GENERAL new photos
- 13:03, 14 March 2013 diff hist 0 N File:Main Page Mar 14, 2013.jpg current
- 13:02, 14 March 2013 diff hist -148 m Main Page new photo
- 09:22, 14 March 2013 diff hist -1 m Main Page
- 09:22, 14 March 2013 diff hist -1 m Category:806 Pollution, Erosion and Sediment Control →806.4 Maintenance Activities
- 09:21, 14 March 2013 diff hist 0 m Main Page
- 09:21, 14 March 2013 diff hist +1 m Main Page
- 09:17, 14 March 2013 diff hist +5 m Main Page EPG 806.4
- 09:04, 14 March 2013 diff hist +656 m Category:806 Pollution, Erosion and Sediment Control →806.4 Maintenance Activities: Per Design - Environmental, updated and clarified
- 14:40, 13 March 2013 diff hist 0 m Main Page
- 15:22, 12 March 2013 diff hist 0 N File:751.8 Reference Guide SBC Mar 12, 2013.doc current
- 15:21, 12 March 2013 diff hist +4 m 751.8 Concrete Box Culverts Per Bridge, updated Reference Guide SBC
- 15:14, 12 March 2013 diff hist -278 m Main Page EPG 907.1
- 15:12, 12 March 2013 diff hist +3,162 m 907.1 Safety Program Guidelines →Distribution of Highway Safety Funds: Per Traffic, expanded guidance for distribution of highway safety funds
- 13:31, 12 March 2013 diff hist 0 m Category:138 Project Development Chronology
- 10:45, 12 March 2013 diff hist -51 m 907.6 Fatal Crash Reviews Per Traffic, updated link
- 10:34, 12 March 2013 diff hist 0 N File:Main Page Mar 12, 2013.jpg current
- 10:34, 12 March 2013 diff hist -83 m Main Page E 907.6
- 09:49, 12 March 2013 diff hist +237 m 907.6 Fatal Crash Reviews Per Traffic, article updated to reflect the new survey for 2013 Fatal Crashes.
- 09:16, 12 March 2013 diff hist +136 m LPA:136.13 LPA Policy Changes Fig. 136.4.7
- 09:15, 12 March 2013 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Updated Fig 136.4.7
- 09:14, 12 March 2013 diff hist 0 N File:136.4.7 Mar 2013.doc current
- 09:13, 12 March 2013 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, in Fig. 136.4.7, updated information regarding the page limits for the letter of interest.
- 14:19, 11 March 2013 diff hist -2 m Main Page
- 10:51, 11 March 2013 diff hist -4 m 905.2 Traffic Studies updated HCM reference
- 14:21, 8 March 2013 diff hist 0 N File:Main Page 2 Mar 8, 2013.jpg current
- 14:20, 8 March 2013 diff hist 0 N File:Main Page Mar 8, 2013.jpg current
- 14:20, 8 March 2013 diff hist -498 m Main Page new photos
- 09:26, 8 March 2013 diff hist 0 N File:612 Impact Attenuators 2013.jpg current
- 09:26, 8 March 2013 diff hist +5 m Category:612 Impact Attenuators new photo, per Traffic
- 16:27, 7 March 2013 diff hist +1 m Main Page
- 16:25, 7 March 2013 diff hist +147 m Main Page EPG 101, etc.
- 16:19, 7 March 2013 diff hist +77 m Category:1047 Corrugated Polyethylene Culvert Pipe →1047.3 Sample Record: Per CM, updated Shipping Report Form link
- 16:18, 7 March 2013 diff hist +77 m Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe →1028.3 Sample Record: Per CM, updated Shipping Report Form link
- 16:17, 7 March 2013 diff hist +147 m Category:1026 Reinforced Concrete Culvert Pipe →1026.4 Report (Records): Per CM, updated Shipping Report Form links
- 16:15, 7 March 2013 diff hist +141 m Category:1024 Corrugated Aluminum Alloy Culvert Pipe and Corrugated Aluminum Alloy Structural Plate →1024.3 Sample Record: Per CM, updated Shipping Report Form links
- 16:13, 7 March 2013 diff hist +74 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.3 Sample Record: Per CM, updated Shipping Report Form links
- 16:11, 7 March 2013 diff hist +147 m 106.15 Pipe Shipping Report Form Per CM, updated Shipping Report Form links
- 16:08, 7 March 2013 diff hist +34 m Category:101 Standard Forms →Materials Related: Per CM, updated Shipping Report Form links
- 13:38, 7 March 2013 diff hist +4 m Main Page bridge, reference
- 13:37, 7 March 2013 diff hist 0 N File:751.8 Reference Guide SBC Mar 2013.doc current