User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:55, 15 May 2013 diff hist 0 N File:Main Page 3 May 15, 2013.jpg current
- 10:55, 15 May 2013 diff hist 0 N File:Main Page 2 May 15, 2013.jpg current
- 10:54, 15 May 2013 diff hist 0 N File:Main Page May 15, 2013.jpg current
- 10:54, 15 May 2013 diff hist -359 m Main Page EPG 134
- 09:57, 15 May 2013 diff hist +91 m Category:134 Engineering Professional Services →134.1.7 Workforce Diversity: Per Design, minor clarification of the workforce diversity guidance
- 09:52, 15 May 2013 diff hist +112 m Category:134 Engineering Professional Services Per Design, clarification of EPG 134.5.1.1
- 09:26, 15 May 2013 diff hist +116 m LPA:136.13 LPA Policy Changes Fig. 136.4.8
- 09:24, 15 May 2013 diff hist -105 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, removed Fig 136.4.8 since this form is no longer required.
- 09:23, 15 May 2013 diff hist -90 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, removed Fig 136.4.8 since this form is no longer required.
- 13:30, 14 May 2013 diff hist 0 N File:134.5.1.1 2013.xlsx current
- 13:30, 14 May 2013 diff hist -16 m Category:134 Engineering Professional Services Per Design, added a workforce diversity section to Fig. 134.5.1.1, Blank Consultant Invoice.
- 12:13, 14 May 2013 diff hist -319 m Main Page EPG 101
- 12:03, 14 May 2013 diff hist 0 N File:SL Signal Maintenance.docx
- 12:03, 14 May 2013 diff hist +96 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, new QRG (SL District Signal Maintenance by Contractor Key Dates)
- 10:17, 14 May 2013 diff hist +125 m LPA:136.13 LPA Policy Changes Fig. 136.9.1
- 10:15, 14 May 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.1
- 10:14, 14 May 2013 diff hist 0 N File:136.9.1 May 2013.xlsx
- 10:13, 14 May 2013 diff hist +20 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, in Fig. 136.9.1, updated the name of a figure
- 07:21, 14 May 2013 diff hist +115 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.1 Yellow Centerline Pavement Markings and Warrants (MUTCD Section 3B.01)
- 15:12, 13 May 2013 diff hist 0 m Main Page
- 15:26, 10 May 2013 diff hist 0 m LPA:136.2 Certification and Training
- 15:26, 10 May 2013 diff hist 0 m 106.18 Technician Certification Program
- 15:11, 10 May 2013 diff hist -7 m LPA:136.2 Certification and Training Per CM, updated employee info
- 15:09, 10 May 2013 diff hist -7 m 106.18 Technician Certification Program Per CM, updated employee info
- 13:52, 10 May 2013 diff hist +81 m Main Page EPG 751.10 and EPG 751.24
- 13:48, 10 May 2013 diff hist +368 m 751.24 Retaining Walls →751.24.2.1 Design: Per Bridge, guidance for slab drain location requirements when slab drains are near MSE walls was added
- 13:32, 10 May 2013 diff hist +903 m 751.10 General Superstructure →751.10.3.1 Type, Alignment, Spacing: Per Bridge, guidance for slab drain location requirements when slab drains are near MSE walls was added
- 13:11, 10 May 2013 diff hist 0 N File:Main Page May 10, 2013.jpg current
- 13:10, 10 May 2013 diff hist +15 m Main Page new photo
- 10:49, 10 May 2013 diff hist +552 m LPA:136.13 LPA Policy Changes EPG 136.3.8
- 10:44, 10 May 2013 diff hist +418 m LPA:136.3 Federal Aid Basics Per LPA, convenient links for additional guidance for STP and CMAQ funds were added
- 12:04, 9 May 2013 diff hist +335 m Main Page E spec book
- 11:12, 9 May 2013 diff hist 0 N File:901.11.1 Type II.pdf
- 11:12, 9 May 2013 diff hist -44 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per Traffic, provided correct Photometric Data 250W Type II figure
- 10:26, 9 May 2013 diff hist +300 m LPA:136.13 LPA Policy Changes Fig 136.9.3
- 10:22, 9 May 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 10:21, 9 May 2013 diff hist 0 N File:136.9.3 May 2013.doc
- 10:20, 9 May 2013 diff hist +28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, in Fig. 136.9.3, removed checkbox for "all e-verify information" on bidders checklist since the e-verify info is only a requirement prior to award and not required to be submitted with bids
- 07:42, 9 May 2013 diff hist +2 m 106.3.2.14 TM-14, Soundness Test of Coarse Aggregate - Water-Alcohol Freeze Method →106.3.2.1.14.4 Test Method current
- 13:35, 7 May 2013 diff hist 0 m Category:824 Adopt-A-Highway and Sponsor-A-Highway Programs
- 12:32, 7 May 2013 diff hist 0 m Main Page
- 12:13, 7 May 2013 diff hist 0 N File:641 2013.jpg current
- 12:13, 7 May 2013 diff hist -5 m Category:641 Bicycle Facilities new photo
- 14:01, 6 May 2013 diff hist +1 m Main Page
- 13:21, 6 May 2013 diff hist -206 m Main Page EPG 1052.2.3
- 13:15, 6 May 2013 diff hist +806 m Category:1052 Mechanically Stabilized Earth Wall (MSE) and Sound Wall System Components →1052.2.3.10 Identification Marking: Per Design, documentation info added
- 07:34, 6 May 2013 diff hist 0 m Main Page
- 11:25, 3 May 2013 diff hist +7 m Talk:902.5 Traffic Control Signal Features (MUTCD Chapter 4D) current
- 11:13, 3 May 2013 diff hist +1,785 m Talk:902.5 Traffic Control Signal Features (MUTCD Chapter 4D)
- 10:59, 3 May 2013 diff hist +9 m LPA:136.11 Local Public Agency Construction