User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:58, 17 May 2013 diff hist 0 N File:Main Page May 17, 2013.jpg current
- 10:58, 17 May 2013 diff hist +70 m Main Page new photo
- 10:27, 17 May 2013 diff hist 0 N File:134.2.2.2 May 2013.doc current
- 10:26, 17 May 2013 diff hist 0 m Category:134 Engineering Professional Services Per Design, two spelling corrections in Fig. 134.2.2.2
- 07:54, 17 May 2013 diff hist +1 m LPA:136.13 LPA Policy Changes
- 07:34, 17 May 2013 diff hist +221 m LPA:136.13 LPA Policy Changes Figs. 136.9.1 and 136.9.3.
- 07:32, 17 May 2013 diff hist +8 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, added minor clarification to Figs. 136.9.1 and 136.9.3.
- 07:31, 17 May 2013 diff hist 0 N File:136.9.3 May 17, 2013.doc
- 07:30, 17 May 2013 diff hist 0 N File:136.9.1 May 17, 2013.xlsx
- 07:30, 17 May 2013 diff hist +48 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, added minor clarification to Figs. 136.9.1 and 136.9.3.
- 14:58, 16 May 2013 diff hist +212 m LPA:136.13 LPA Policy Changes EPG 136.4.2.7.5
- 14:55, 16 May 2013 diff hist +375 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.4 Ceasing Negotiation: Per LPA, new guidance about contract execution timeframe
- 14:49, 16 May 2013 diff hist +113 m Main Page EPG 751.6.2
- 14:39, 16 May 2013 diff hist +52 m 751.50 Standard Detailing Notes Per Bridge, amended Standard detailing Notes for editorial corrections.
- 14:27, 16 May 2013 diff hist +223 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, amended Non-Destructive Testing to specifically require only welds of terminal sections of cover plates in tension areas to be checked.
- 14:24, 16 May 2013 diff hist +575 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, guidance for computing slab quantity for bridge plans added
- 14:12, 16 May 2013 diff hist -1 m Main Page
- 14:04, 16 May 2013 diff hist 0 N File:Main Page 3 May 16, 2013.jpg current
- 14:04, 16 May 2013 diff hist -79 m Main Page EPG 751.2
- 13:44, 16 May 2013 diff hist -10 m 751.2 Loads →751.2.4 Load Distributions: Per Bridge, revised the definition of "ts" to mean full depth of concrete slab
- 11:29, 16 May 2013 diff hist +238 m LPA:136.13 LPA Policy Changes EPG 136.4.2.6
- 11:26, 16 May 2013 diff hist +905 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.6 Step 5 - Selection of Consultant: Per LPA, additional guidance for selecting and scoring a consultant
- 11:19, 16 May 2013 diff hist 0 N File:236 Form 3.4.2 2013.docx
- 11:18, 16 May 2013 diff hist +30 m 236.3 Administration Per RW, minor update to Form 3.4.2. CE, EA and EIS boxes added
- 10:40, 16 May 2013 diff hist -72 m Category:616 Temporary Traffic Control Per Traffic, removed archaic "Work Zone Fine signing sequence" figure. The current figure is still available at EPG 616.12.3.4.
- 07:24, 16 May 2013 diff hist +104 m LPA:136.13 LPA Policy Changes Per ECR, updated Fig. 136.11.13, Job Bulletin Board Checklist
- 07:23, 16 May 2013 diff hist +11 m LPA:136.12 Figures, Glossary and Other Useful Links Per ECR, updated Fig. 136.11.13, Job Bulletin Board Checklist
- 07:22, 16 May 2013 diff hist +11 m LPA:136.11 Local Public Agency Construction Per ECR, updated Fig. 136.11.13, Job Bulletin Board Checklist
- 15:27, 15 May 2013 diff hist +2 m Main Page
- 15:25, 15 May 2013 diff hist +4 m Main Page
- 11:12, 15 May 2013 diff hist +1 m Main Page
- 11:12, 15 May 2013 diff hist +2 m Main Page
- 10:56, 15 May 2013 diff hist +7 m Main Page
- 10:55, 15 May 2013 diff hist 0 N File:Main Page 4 May 15, 2013.jpg current
- 10:55, 15 May 2013 diff hist 0 N File:Main Page 3 May 15, 2013.jpg current
- 10:55, 15 May 2013 diff hist 0 N File:Main Page 2 May 15, 2013.jpg current
- 10:54, 15 May 2013 diff hist 0 N File:Main Page May 15, 2013.jpg current
- 10:54, 15 May 2013 diff hist -359 m Main Page EPG 134
- 09:57, 15 May 2013 diff hist +91 m Category:134 Engineering Professional Services →134.1.7 Workforce Diversity: Per Design, minor clarification of the workforce diversity guidance
- 09:52, 15 May 2013 diff hist +112 m Category:134 Engineering Professional Services Per Design, clarification of EPG 134.5.1.1
- 09:26, 15 May 2013 diff hist +116 m LPA:136.13 LPA Policy Changes Fig. 136.4.8
- 09:24, 15 May 2013 diff hist -105 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, removed Fig 136.4.8 since this form is no longer required.
- 09:23, 15 May 2013 diff hist -90 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, removed Fig 136.4.8 since this form is no longer required.
- 13:30, 14 May 2013 diff hist 0 N File:134.5.1.1 2013.xlsx current
- 13:30, 14 May 2013 diff hist -16 m Category:134 Engineering Professional Services Per Design, added a workforce diversity section to Fig. 134.5.1.1, Blank Consultant Invoice.
- 12:13, 14 May 2013 diff hist -319 m Main Page EPG 101
- 12:03, 14 May 2013 diff hist 0 N File:SL Signal Maintenance.docx
- 12:03, 14 May 2013 diff hist +96 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, new QRG (SL District Signal Maintenance by Contractor Key Dates)
- 10:17, 14 May 2013 diff hist +125 m LPA:136.13 LPA Policy Changes Fig. 136.9.1
- 10:15, 14 May 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.1