User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:56, 17 June 2013 diff hist -102 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Rumble Strips (MUTCD 6F.87): Revised to provide an option and guidance for long or short term rumble strips on construction projects.
- 14:50, 17 June 2013 diff hist 0 N File:237.9.6.6. sheet deleted.jpg current
- 14:50, 17 June 2013 diff hist 0 N File:237.9.6.4.4.jpg current
- 14:50, 17 June 2013 diff hist 0 N File:237.9.6.4.1.jpg current
- 14:49, 17 June 2013 diff hist +5,817 m 237.9 Submission of Plans and Supporting Documents Per Design, general clarification and updating of guidance to match current practices
- 10:27, 17 June 2013 diff hist 0 N File:Main Page June 17, 2013.jpg current
- 10:26, 17 June 2013 diff hist -131 m Main Page new photo
- 07:25, 17 June 2013 diff hist +32 m 234.3 Directional Interchanges →234.3.7 Superelevation: added Green Book reference
- 07:18, 17 June 2013 diff hist +250 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 07:16, 17 June 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 07:15, 17 June 2013 diff hist 0 N File:136.9.3 June 14, 2013.doc
- 07:14, 17 June 2013 diff hist +28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, in Fig. 136.9.3 updated the acceptance for provision for asphalt cement price index, seal coat price index, underseal price index and UBAWS membrane price index
- 14:29, 14 June 2013 diff hist -1 m Main Page
- 09:40, 14 June 2013 diff hist +13 m Main Page EPG 236.3.7.5
- 09:36, 14 June 2013 diff hist +111 m 236.3 Administration →236.3.7.5 Distribution of Clearance Certification: Per RW, updated to reflect the appropriate process and division titles.
- 08:13, 14 June 2013 diff hist +28 m Main Page
- 07:56, 14 June 2013 diff hist 0 N File:Main Page June 14, 2013.jpg current
- 07:56, 14 June 2013 diff hist -233 m Main Page new photo
- 15:20, 13 June 2013 diff hist +93 m 234.3 Directional Interchanges →234.3.7 Superelevation
- 15:13, 13 June 2013 diff hist +2,469 m 234.3 Directional Interchanges →234.3.7 Superelevation: added table for min. radii for 6% superelevation (AASHTO Table 3-9, 2011)
- 14:26, 13 June 2013 diff hist +295 m LPA:136.13 LPA Policy Changes EPG 136.6.4.1.1
- 14:24, 13 June 2013 diff hist 0 N File:136.4.1.1 excluded.pdf
- 14:23, 13 June 2013 diff hist +3,347 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1.1 Step 1, Determine Need for Cultural Resource Investigations: Per Environmental, added Post-1945 Bridge info to allow exemption of some bridges from the Sec 106 review
- 10:08, 13 June 2013 diff hist +15 m Main Page
- 10:06, 13 June 2013 diff hist 0 N File:Main Page June 13, 2013.jpg current
- 10:06, 13 June 2013 diff hist +22 m Main Page new photo
- 09:25, 13 June 2013 diff hist -114 m Main Page Help Article
- 08:09, 13 June 2013 diff hist -463 m 902.18 Glossary Per Traffic, linked existing archaic definitions to accepted definitions in EPG 900
- 08:03, 13 June 2013 diff hist +73 m Category:900 TRAFFIC CONTROL →900.1.13 Definitions of Headings, Words and Phrases in the EPG 900 articles (MUTCD Section 1A.13): added links
- 10:21, 12 June 2013 diff hist +140 m Main Page EPG 402
- 10:06, 12 June 2013 diff hist +30 m Category:402 Bituminous Surface Leveling Per Design, tacking rate adjusted to be consistent with other standards. Maintenance operation guidance clarified.
- 08:48, 12 June 2013 diff hist 0 m Main Page
- 08:45, 12 June 2013 diff hist 0 m Main Page
- 08:26, 12 June 2013 diff hist 0 N File:Main Page June 12, 2013.jpg current
- 08:25, 12 June 2013 diff hist +64 m Main Page EPG 702
- 07:41, 12 June 2013 diff hist -32 m Category:134 Engineering Professional Services →134.1.7 Workforce Diversity: Per CCO, an inaccurate phrase removed.
- 07:18, 12 June 2013 diff hist +4 m Category:702 Load-Bearing Piles →702.1.4.2 Inspection
- 07:17, 12 June 2013 diff hist -42 m Category:702 Load-Bearing Piles →702.1.4.1 Pile Formula
- 07:16, 12 June 2013 diff hist 0 N File:702.1.4.1.xlsx current
- 07:15, 12 June 2013 diff hist -39 m Category:702 Load-Bearing Piles →702.1.4.1 Pile Formula: Per Bridge, updated the pile driving set calculator. The hammer efficiency was removed from calculations.
- 14:30, 11 June 2013 diff hist 0 m 237.8 Contract Time Per Design, updated link to JSP
- 10:14, 11 June 2013 diff hist +163 m LPA:136.13 LPA Policy Changes Fig. 136/4/1
- 10:12, 11 June 2013 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.1
- 10:11, 11 June 2013 diff hist 0 N File:Fig. 136.4.1 June 2013.docx
- 10:10, 11 June 2013 diff hist +6 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated incorrect references to "consultant" and replaced with "engineer"
- 09:56, 11 June 2013 diff hist +536 m Main Page EPG 616
- 09:13, 11 June 2013 diff hist +408 m 616.18 Construction Inspection Guidelines for Sec 616 Per Traffic and Design, additional guidance was provided for signing for side roads when a pilot car is being used in a one-lane two-way operation, the use of bump signs in work zones and the expectat
- 09:04, 11 June 2013 diff hist -7 m 616.23 Traffic Control for Field Operations
- 08:45, 11 June 2013 diff hist 0 N File:616.3.2 JSP.docx
- 08:44, 11 June 2013 diff hist +3,164 m 616.16 Law Enforcement Services Per Traffic and Design, additional guidance was provided for signing for side roads when a pilot car is being used in a one-lane two-way operation, the use of bump signs in work zones and the expectat