User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:58, 28 October 2013 diff hist +43 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: inserted link
- 12:51, 28 October 2013 diff hist +232 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Per Bridge, new note pertaining to end treatment with thrie beam rail
- 12:47, 28 October 2013 diff hist 0 m 751.40 LFD Widening and Repair →751.40.4.4 End Treatment Using Thrie Beam Rail
- 12:44, 28 October 2013 diff hist 0 N File:751.40.4.4 clearance.jpg current
- 12:43, 28 October 2013 diff hist 0 N File:751.40.4.4.jpg current
- 12:41, 28 October 2013 diff hist +360 m 751.40 LFD Widening and Repair Per Bridge, EPG 751.40.4.4 added to show details on thrie beam end treatment attached to old concrete parapet curbs. This guidance was not previously in the EPG.
- 10:40, 28 October 2013 diff hist +45 m Main Page
- 10:39, 28 October 2013 diff hist +1 m Main Page
- 10:34, 28 October 2013 diff hist +63 m Main Page EPG 620.3 and EPG 101
- 09:58, 28 October 2013 diff hist 0 N File:Adobe Final Plans Stamp.docx
- 09:58, 28 October 2013 diff hist +67 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, new QRG, Adobe Final Plans Stamp
- 08:21, 28 October 2013 diff hist +319 m 620.3 Roundabout Markings (MUTCD Chapter 3C) →620.3.6 Word, Symbol and Arrow Pavement Markings for Roundabouts (MUTCD Section 3C.6): Per Traffic, clarification of the use of the fishhook arrow
- 12:01, 25 October 2013 diff hist -9 m 642.8 Sidewalk Design Criteria
- 11:29, 25 October 2013 diff hist +80 m 642.8 Sidewalk Design Criteria updated link
- 11:08, 25 October 2013 diff hist +156 m 642.8 Sidewalk Design Criteria updated several links, removed PROWAG links
- 10:41, 25 October 2013 diff hist +2 m 616.23 Traffic Control for Field Operations minor clarification
- 10:40, 25 October 2013 diff hist +1 m 616.8 Typical Applications (MUTCD 6H) minor clarification
- 08:13, 25 October 2013 diff hist -66 m Main Page EPG 903.9
- 07:22, 25 October 2013 diff hist -2,905 m 903.9 General Information Signs →903.9.2 General Information Signs (I Series) (MUTCD Section 2H.02): Per Traffic, guidance clarified by removing MUTCD verbiage that conflicted with other MoDOT policies
- 07:19, 25 October 2013 diff hist -54 m 903.9 General Information Signs →903.9.7 Airport Sign (D4-10): Per Traffic, first order signing for general aviation airports is now provided at no charge
- 15:26, 24 October 2013 diff hist 0 m Main Page
- 13:44, 24 October 2013 diff hist 0 m 640.2 Median Drainage →640.1.3 Design Discharge: Per Bridge, minor correction
- 12:19, 24 October 2013 diff hist +28 m Main Page
- 10:43, 24 October 2013 diff hist 0 N File:Main Page Oct 24, 2013.jpg current
- 10:43, 24 October 2013 diff hist -29 m Main Page new photo
- 14:51, 23 October 2013 diff hist -6 m 103.1 Bid Opening and Award Process updated links
- 11:16, 23 October 2013 diff hist 0 m Main Page
- 07:11, 23 October 2013 diff hist +88 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: Per CM, guidance was further clarified for the payment of the relocation of Logo signs
- 13:16, 22 October 2013 diff hist -51 m Category:1052 Mechanically Stabilized Earth Wall (MSE) and Sound Wall System Components →1052.2.3.10 Identification Marking: Per CM, identification marking guidance brought into compliance with Sec 1052
- 09:39, 22 October 2013 diff hist -260 m Main Page EPG 106.3.2.59.3
- 09:35, 22 October 2013 diff hist +33 m 106.3.2.59 TM-59, Determination of the International Roughness Index →106.3.2.59.3 Construction Acceptance Procedures: Per CM, the naming convention for the lane numbers was revised
- 08:37, 22 October 2013 diff hist 0 N File:Main Page Oct 22, 2013.jpg current
- 08:37, 22 October 2013 diff hist +666 m Main Page Unit Pricing table
- 07:50, 22 October 2013 diff hist 0 N File:823.7.jpg current
- 07:50, 22 October 2013 diff hist +75 m 823.7 All in a Day’s Work – Handling the Crew added photo
- 07:20, 22 October 2013 diff hist +152 m 903.11 Specific Service Signs - Logos →903.11.3 Logos and Logo Sign Panels (MUTCD Section 2J.03): Per Traffic, added link to Unit Pricing chart
- 07:17, 22 October 2013 diff hist +96 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: added link
- 14:32, 21 October 2013 diff hist -110 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.9 Detours and Diversions (MUTCD 6C.09): Per Traffic, minor clarification
- 12:51, 21 October 2013 diff hist 0 N File:Main Page Oct 21, 2013.jpg current
- 12:50, 21 October 2013 diff hist +207 m Main Page new photo
- 10:22, 21 October 2013 diff hist -1 m 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers Per CM, replaced the superseded ASTM reference with the current one
- 10:15, 21 October 2013 diff hist -14 m 751.50 Standard Detailing Notes →H3. Bearings: Per Bridge, minor corrections
- 09:53, 21 October 2013 diff hist +34 m 230.2 Vertical Alignment →230.2.4 Sight Distance: new photo
- 09:52, 21 October 2013 diff hist 0 N File:230.2.4.jpg current
- 14:20, 18 October 2013 diff hist +209 m Main Page EPG 130.1.3
- 14:01, 18 October 2013 diff hist +90 m Category:130 Value Engineering Per Design, in order to comply with MAP-21, NHS projects costing at least $50M and NHS bridge projects costing at least $40M require a VE
- 13:35, 18 October 2013 diff hist +550 m LPA:136.13 LPA Policy Changes EPG 136.7.2.10
- 13:28, 18 October 2013 diff hist -1 m LPA:136.7 Design →136.7.2.10 Value Engineering: Per Design, in order to comply with MAP-21, NHS projects costing at least $50M and NHS bridge projects costing at least $40M require a VE
- 13:19, 18 October 2013 diff hist -155 m Main Page EPG 806 and 134
- 11:23, 18 October 2013 diff hist -135 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per Design, the invoicing requirements were updated. Design no longer gets the letters; only Finc'l Services.