User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:59, 26 November 2013 diff hist +240 m Main Page EPG 236.5.28
- 12:29, 26 November 2013 diff hist +1,739 m 236.5 Property Management →236.5.28.3 Compensation for Changes in Access: Per RW, reflects 11/7/13 change in Comm. Policy outlining when appraisals are required for a break in access and a noncontiguous access shift
- 10:32, 26 November 2013 diff hist 0 N File:Main Page Nov 26, 2013.jpg current
- 10:32, 26 November 2013 diff hist +87 m Main Page EPG 147.3
- 10:27, 26 November 2013 diff hist -5 m 147.3 Job Order Contracting (JOC)
- 10:11, 26 November 2013 diff hist 0 N File:147 asphalt pavement repair 2014.doc current
- 10:11, 26 November 2013 diff hist 0 N File:147 bridge 2014.doc current
- 10:10, 26 November 2013 diff hist 0 N File:147 concrete pavement repair 2014.doc current
- 10:10, 26 November 2013 diff hist 0 N File:147 fence 2014.doc current
- 10:10, 26 November 2013 diff hist -210 m 147.3 Job Order Contracting (JOC) Per Design, updated four JSPs. Guardrail and Guard Cable JSPs temporarily removed.
- 14:48, 25 November 2013 diff hist +995 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications: Per Traffic, added guidance for stationary and mobile operations as well as guidance for operations on roadways with and without edgelines
- 14:48, 25 November 2013 diff hist -3 m 616.23 Traffic Control for Field Operations
- 13:50, 25 November 2013 diff hist -103 m Main Page EPG 941
- 13:25, 25 November 2013 diff hist 0 N File:EPG 941 Summary.docx current
- 13:25, 25 November 2013 diff hist +304 m Category:941 Permits and Access Requests Added Traffic's "talking points" summarizing the many changes to EPG 941.
- 13:21, 25 November 2013 diff hist -2,645 Category:941 Permitting Process for Access Management current
- 12:28, 25 November 2013 diff hist 0 N File:616.23.2.5.7 Type 2.jpg current
- 12:28, 25 November 2013 diff hist 0 N File:616.23.2.5.7.jpg current
- 12:28, 25 November 2013 diff hist 0 m 616.23 Traffic Control for Field Operations →616.23.2.5.7 Pavement Markings
- 12:27, 25 November 2013 diff hist +116 m 616.23 Traffic Control for Field Operations Per Traffic, added photo
- 12:26, 25 November 2013 diff hist +107 m 616.23 Traffic Control for Field Operations Per traffic, added photo
- 12:20, 25 November 2013 diff hist -43 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.47 NO CENTER LINE Sign (WO8-12) (MUTCD 6F.47): Per Traffic, minor clarification about the old NO PASSING ZONES UNMARKED signs (that have been replaced by the NO CENTER STIPE sign)
- 12:19, 25 November 2013 diff hist -240 m 616.23 Traffic Control for Field Operations Per Traffic, minor clarification about the old NO PASSING ZONES UNMARKED signs (that have been replaced by the NO CENTER STIPE sign)
- 11:39, 25 November 2013 diff hist +571 m 236.6 Appraisal and Appraisal Review Replaced link to former EPG 941.1 with the brief content of the former EPG 941.1.
- 11:37, 25 November 2013 diff hist -26 m 171.4 Shoulders and Approaches Updated link to EPG 941
- 11:29, 25 November 2013 diff hist -13 m Category:900 TRAFFIC CONTROL Per Traffic, EPG 941 has been almost entirely re-written to reflect the Commission Policies.
- 11:28, 25 November 2013 diff hist +84,370 Nm Category:941 Permits and Access Requests Per Traffic, EPG 941 has been almost entirely re-written to reflect the Commission Policies.
- 11:13, 25 November 2013 diff hist +135 903.9 General Information Signs Per Traffic, updated links
- 11:06, 25 November 2013 diff hist +45 m 171.4 Shoulders and Approaches Per Traffic, updated link
- 11:05, 25 November 2013 diff hist +45 m 750.7 Non-Hydraulic Considerations Per Traffic, updated link
- 11:04, 25 November 2013 diff hist +84 m 233.2 At-Grade Intersections with Stop and Yield Control Per Traffic, updated links
- 11:02, 25 November 2013 diff hist -2 m 905.1 Traffic Data Collection
- 10:59, 25 November 2013 diff hist +42 m 905.1 Traffic Data Collection Per Traffic, updated link
- 10:58, 25 November 2013 diff hist +41 m Category:240 Maintenance and Emergency Crossovers Per Traffic, updated link
- 10:53, 25 November 2013 diff hist 0 N File:941 Value.pdf current
- 10:52, 25 November 2013 diff hist -51 m 236.5 Property Management Per Traffic, updated link
- 16:05, 22 November 2013 diff hist -4 m Category:503 Bridge Approach Slabs →503.1 Major Roads: updated link
- 16:04, 22 November 2013 diff hist -16 m Category:144 Practical Operations updated link
- 14:47, 21 November 2013 diff hist +265 m Main Page EPG 620.12 revision re-instated
- 14:46, 21 November 2013 diff hist +148 m 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4): CM's revision re-instated
- 14:11, 21 November 2013 diff hist -149 m 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4): Per Traffic, CM's revision from a few minutes ago replaced with previous guidance.
- 14:05, 21 November 2013 diff hist -265 m Main Page EPG 620.12 revision removed
- 13:45, 21 November 2013 diff hist +33 m Main Page EPG 6320.12.2.4
- 13:42, 21 November 2013 diff hist +49 m 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4): inserted link
- 13:41, 21 November 2013 diff hist +98 m 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4): Per CM, clarification of guidance for retroreflectivity readings following seal coats as opposed to readings following UBAWS or other treatments.
- 12:27, 21 November 2013 diff hist 0 File:Main Page Nov 21, 2013.jpg uploaded a new version of "Image:Main Page Nov 21, 2013.jpg" current
- 12:27, 21 November 2013 diff hist 0 N File:Main Page Nov 21, 2013.jpg
- 12:27, 21 November 2013 diff hist +218 m Main Page EPG 748.7.6
- 12:05, 21 November 2013 diff hist +68 m 104.7 Scoping Estimates Per Planning, updated two links
- 11:50, 21 November 2013 diff hist +224 m 104.7 Scoping Estimates Added historical engineering factor reports, per Planning