User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 15:46, 5 December 2013 diff hist 0 N File:147 concrete pavement repair Dec 5, 2013.doc current
- 15:46, 5 December 2013 diff hist 0 N File:147 fence Dec 5, 2013.doc current
- 15:46, 5 December 2013 diff hist 0 N File:147 guard cable Dec 5, 2013.doc current
- 15:46, 5 December 2013 diff hist 0 N File:147 guardrail Dec 5, 2013.doc current
- 15:45, 5 December 2013 diff hist +34 m 147.3 Job Order Contracting (JOC) Per Bidding & Contracts, minor corrections in JSPs
- 13:34, 5 December 2013 diff hist 0 N File:Main Page 2 Dec 5, 2013.jpg current
- 13:34, 5 December 2013 diff hist 0 N File:Main Page Dec 5, 2013.jpg current
- 13:34, 5 December 2013 diff hist +53 m Main Page new photos
- 09:25, 5 December 2013 diff hist -189 m Main Page EPG 133.4.6
- 09:23, 5 December 2013 diff hist +1 m 133.4 Snow and Ice Control Operations →133.4.6 Statewide Winter Road Condition Report: Per Maintenance, clarification of road condition terminology
- 09:13, 5 December 2013 diff hist +140 m 751.1 Preliminary Design →751.1.2.21 Types of Piling: Per Bridge, added link and clarification
- 09:12, 5 December 2013 diff hist -30 751.0 State Map
- 09:11, 5 December 2013 diff hist 0 m 751.0 State Map →751.0.1 State Outline Map – County Code and District Numbers
- 14:08, 4 December 2013 diff hist 0 N File:Main Page 2 Dec 4, 2013.jpg current
- 14:08, 4 December 2013 diff hist 0 N File:Main Page Dec 4, 2013.jpg current
- 14:07, 4 December 2013 diff hist -274 m Main Page
- 14:15, 3 December 2013 diff hist -54 m Main Page EPG 147.3
- 14:10, 3 December 2013 diff hist 0 N File:147 guard cable Dec 2013.doc current
- 14:10, 3 December 2013 diff hist 0 N File:147 guardrail Dec 2013.doc current
- 14:09, 3 December 2013 diff hist +191 m 147.3 Job Order Contracting (JOC) Per Design, brought back updated Guardrail and Guard Cable JSPs.
- 11:25, 3 December 2013 diff hist +34 m Main Page EPG 643.2
- 11:04, 3 December 2013 diff hist -1,500 m 643.2 Local Utility Adjustments - Public and Private Per Design, pre-audits are no longer conducted for consultant or utility contracts. Also, other minor clarifications.
- 10:28, 3 December 2013 diff hist +2 m 616.25 MoDOT Work Zone Guidelines →District Work Zone Coordinators
- 15:38, 2 December 2013 diff hist -67 m Main Page EPG 701
- 15:35, 2 December 2013 diff hist +135 m Category:701 Drilled Shafts Per Bridge, clarified useage of limestone and other rock. Compressive strengths were identified.
- 15:21, 2 December 2013 diff hist +3 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:20, 2 December 2013 diff hist 0 N File:750 E2.1.jpg current
- 15:19, 2 December 2013 diff hist -2,258 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge, switched from a table to a picture of a Microstation drawing so that format in EPG matches that of the CEL file.
- 15:16, 2 December 2013 diff hist +124 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge,E2.1: Correcting format to match office practice, adding abbreviations of driving verification methods and updating terminology from "shale" to "weak rock".
- 11:00, 2 December 2013 diff hist +1 m Category:941 Permits and Access Requests →941.2.2 Evluation Guidelines and Considerations
- 10:13, 2 December 2013 diff hist 0 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications
- 10:09, 2 December 2013 diff hist +145 m Main Page EPG 101
- 09:35, 2 December 2013 diff hist -2 m Category:239 Construction Inspection Guidelines for Final Plans Per CM, "Cognos 8" replaced with more generic "Cognos"
- 09:35, 2 December 2013 diff hist -2 m Category:123 Federal-Aid Highway Program →123.3.1.3.1 Report Review: Per CM, "Cognos 8" replaced with more generic "Cognos"
- 09:34, 2 December 2013 diff hist -10 m 106.21 Summary of Materials Inspected Per CM, "Cognos 8" replaced with more generic "Cognos"
- 09:32, 2 December 2013 diff hist -8 m Category:109 Measurement and Payment Per CM, six QRG were updated. An additional QRG was retitled "Cognos Access for SM".
- 09:25, 2 December 2013 diff hist 0 N File:Cognos Access for SM.doc current
- 09:25, 2 December 2013 diff hist 0 N File:Change Orders – Value Engineering Dec 2013.doc current
- 09:24, 2 December 2013 diff hist 0 N File:Change Orders – Time Adjustment Dec 2013.docx
- 09:24, 2 December 2013 diff hist 0 N File:Change Orders – Mobilization and Contract Bond 2013.docx
- 09:24, 2 December 2013 diff hist 0 N File:Change Orders Dec 2013.docx
- 09:24, 2 December 2013 diff hist 0 File:Change orders zero dollar 2013.docx uploaded a new version of "Image:Change orders zero dollar 2013.docx"
- 09:24, 2 December 2013 diff hist 0 N File:Change orders zero dollar 2013.docx
- 09:23, 2 December 2013 diff hist 0 N File:Change order reports 2013.docx current
- 09:23, 2 December 2013 diff hist -7 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, six QRG were updated. An additional QRG was retitled "Cognos Access for SM".
- 15:22, 26 November 2013 diff hist -336 m Main Page
- 15:19, 26 November 2013 diff hist -1,513 m Category:109 Measurement and Payment Per CM, updated two QRGs (Contractor Payment Estimates and Stockpile Materials) reflecting the move from Lotus Notes and the upgrade to Cognos 10
- 15:06, 26 November 2013 diff hist 0 N File:Stockpiled Materials 2013.doc current
- 15:05, 26 November 2013 diff hist 0 N File:Contractor Pay Estimates 2013.docx
- 15:05, 26 November 2013 diff hist +10 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, two updated QRGs (Contractor Pay Estimates and Stockpiled Materials) reflecting the move from Lotus Notes and the upgrade to Cognos 10