User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 15:45, 24 January 2014 diff hist +1,186 m 751.1 Preliminary Design Per Bridge, expanded and clarified Bridge Memo guidance
- 15:32, 24 January 2014 diff hist +112 m 751.40 LFD Widening and Repair Per Bridge, replaced all references to Design Layout with Bridge Memo. EPG 751.40's rehab work requires only a Bridge Memo, not a Design Layout (except rarely, as for a special widening project)
- 10:44, 24 January 2014 diff hist +12 m 643.2 Local Utility Adjustments - Public and Private Updated link to MHTC Contract Submittal Form, per Commission Secr
- 10:28, 24 January 2014 diff hist 0 N File:643.2 Contract Submittal Form.docx
- 10:28, 24 January 2014 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private Updated link to MHTC Contract Submittal Form, per Commission Secr
- 10:25, 24 January 2014 diff hist -2 m 902.17 Execution of Contracts for Signal or Flasher Installation →902.17.3 Transmittal Letter
- 10:23, 24 January 2014 diff hist +6 m 902.17 Execution of Contracts for Signal or Flasher Installation Updated link to MHTC Contract Submittal Form, per Commission Secr
- 12:07, 23 January 2014 diff hist 0 N File:Main Page Jan 23, 2014.jpg current
- 12:07, 23 January 2014 diff hist +289 m Main Page
- 14:38, 22 January 2014 diff hist 0 N File:Main Page Jan 22, 2014.jpg current
- 14:38, 22 January 2014 diff hist -127 m Main Page
- 09:45, 22 January 2014 diff hist -107 m Main Page EPG 101
- 08:15, 22 January 2014 diff hist +5 m Category:501 Concrete →501.2.1 Scope: Per CM, Concrete Mix Design Creation QRG updated to reflect previous spec and organization changes
- 08:12, 22 January 2014 diff hist 0 N File:Concrete mix design creation 2014.doc current
- 08:10, 22 January 2014 diff hist +5 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, Concrete Mix Design Creation QRG updated to reflect previous spec and organization changes
- 13:46, 21 January 2014 diff hist 0 N File:238.1 Survey Code Sheet 2014.pdf current
- 13:45, 21 January 2014 diff hist +5 m 238.1 Aerial Mapping and LiDAR Surveys Per Photogrammetry, updated Survey Code Sheet with minor correction
- 12:19, 21 January 2014 diff hist 0 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.8.1 Taper Length: corrected ink
- 11:35, 21 January 2014 diff hist 0 N File:Main Page Jan 21, 2014.jpg current
- 11:34, 21 January 2014 diff hist -120 m Main Page EPG 134.2.4
- 11:05, 21 January 2014 diff hist +342 m 606.1 Guardrail Per Bridge, added link
- 10:34, 21 January 2014 diff hist 0 File:751.5.11.6.jpg uploaded a new version of "Image:751.5.11.6.jpg" current
- 09:51, 21 January 2014 diff hist +209 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: Per Design, MOU process updates
- 15:00, 17 January 2014 diff hist 0 N File:Main Page 3 Jan 17, 2014.jpg current
- 15:00, 17 January 2014 diff hist 0 N File:Main Page 2 Jan 17, 2014.jpg current
- 14:59, 17 January 2014 diff hist 0 N File:Main Page Jan 17, 2014.jpg current
- 14:59, 17 January 2014 diff hist +73 m Main Page
- 11:29, 17 January 2014 diff hist 0 N File:127.14.3.5 Partnering Agreement 2014.pdf current
- 11:29, 17 January 2014 diff hist +10 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents Per Environmental, provided 2014 FHWA/MoDOT partnering agreement
- 10:31, 17 January 2014 diff hist 0 N File:134.2.2.2 2014.doc current
- 10:30, 17 January 2014 diff hist -16 m Category:134 Engineering Professional Services Per Design, updated Solicitation and Request Letter for FY 2014
- 10:20, 17 January 2014 diff hist 0 N File:751.5.11.7.jpg current
- 10:20, 17 January 2014 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.11.6 Development of non-epoxy Grade 40 deformed bars in tension, \,L_d (LRFD 5.11.2.1)
- 10:19, 17 January 2014 diff hist 0 N File:751.5.11.6.jpg
- 10:19, 17 January 2014 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.11.5 Development of Standard Hooks in Tension, \,L_{dh} (\,F_y = 60 ksi)
- 10:18, 17 January 2014 diff hist 0 N File:751.5.11.5.jpg current
- 10:18, 17 January 2014 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.11.4 Development and Lap Splice Lengths - Bars in Compression (\,F_y = 60 ksi)
- 10:17, 17 January 2014 diff hist 0 N File:751.5.11.4.jpg current
- 10:17, 17 January 2014 diff hist 0 N File:751.5.11.3.jpg current
- 10:17, 17 January 2014 diff hist +4 m 751.5 Structural Detailing Guidelines →751.5.11.3 Development and Tension Lap Splice Lengths – Other Than Top Bars (\,F_y = 60 ksi)
- 10:16, 17 January 2014 diff hist 0 N File:751.5.11.2.jpg current
- 10:15, 17 January 2014 diff hist -326 m 751.5 Structural Detailing Guidelines →751.5.11 Development and Splicing of Reinforcement: Per Bridges, minor clarifications and corrections in several charts
- 09:53, 17 January 2014 diff hist +5 m 616.23 Traffic Control for Field Operations →616.23.2.5.7 Pavement Markings: Per Traffic, clarification
- 09:49, 17 January 2014 diff hist -2 m 236.16 Outdoor Advertising Per RW, updated link to Outdoor Advertising Rules and Regulations pamphlet
- 08:56, 17 January 2014 diff hist -6 m Category:612 Impact Attenuators
- 08:51, 17 January 2014 diff hist +62 m Category:612 Impact Attenuators added latest TMA safety points video
- 13:14, 14 January 2014 diff hist 0 m Main Page
- 08:04, 14 January 2014 diff hist +3 m 751.6 General Quantities →751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel): Per Bridge, corrected misspelling
- 13:16, 13 January 2014 diff hist +73 m Main Page EPG m806.8
- 12:26, 13 January 2014 diff hist -1 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP)