User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:31, 28 March 2014 diff hist 0 N File:139 I 64 RFP.pdf current
- 08:31, 28 March 2014 diff hist 0 N File:139 Industry Meeting Sign in Sheet.docx current
- 08:31, 28 March 2014 diff hist 0 N File:139 Industry Meeting Name Tag Key.pdf current
- 08:30, 28 March 2014 diff hist 0 N File:139 Industry Meeting Agenda Example.pdf current
- 08:30, 28 March 2014 diff hist 0 N File:139 I 64 RFQ.pdf current
- 08:30, 28 March 2014 diff hist 0 N File:139 Project Advertisement Example.pdf current
- 08:30, 28 March 2014 diff hist 0 N File:139 Acronyms.pdf current
- 08:30, 28 March 2014 diff hist 0 N File:139 Design Build Process Checklist.pdf current
- 08:29, 28 March 2014 diff hist 0 N File:139 FHWA Design Build Program Agreement.pdf current
- 08:29, 28 March 2014 diff hist 0 N File:139 Sample Project Goals.pdf current
- 08:29, 28 March 2014 diff hist 0 N File:139 Commission Chief Engineer Authority Example.pdf current
- 08:29, 28 March 2014 diff hist 0 N File:139 DB Values.pdf current
- 08:28, 28 March 2014 diff hist 0 N File:139.jpg current
- 08:28, 28 March 2014 diff hist +18,979 m Category:139 Design - Build Per Design (led by SL District), EPG 139 generally re-written to provide additional guidance for existing practices.
- 14:03, 27 March 2014 diff hist -8 m 643.2 Local Utility Adjustments - Public and Private →643.2.2.9 Payment To Utility Companies For Reimbursable Work: Per Design, clarification of federal money used in utility contracts
- 13:07, 27 March 2014 diff hist 0 N File:Main Page Mar 27, 2014.jpg current
- 13:06, 27 March 2014 diff hist -380 m Main Page
- 08:06, 26 March 2014 diff hist +480 m Main Page EPG 643.2
- 07:08, 26 March 2014 diff hist 0 N File:643.2.1.35.pdf current
- 15:26, 25 March 2014 diff hist -1 m 643.2 Local Utility Adjustments - Public and Private →643.2.1.35 Lightcore, a Centurytel Company, Agreement
- 15:11, 25 March 2014 diff hist -4 m 236.13 Designing Right of Way Plans →236.13.2.1 Major Routes: updated link
- 15:11, 25 March 2014 diff hist -4 m 616.14 Work Zone Safety and Mobility Policy →616.14.8 Significant Projects: updated link
- 15:08, 25 March 2014 diff hist -4 m Category:643 Utility Procedures updated link
- 15:06, 25 March 2014 diff hist 0 m 643.3 Policy, Standards and Regulations →643.3.3 Definitions and General Information
- 15:03, 25 March 2014 diff hist 0 N File:643.2 Example of PreAudit approval.pdf current
- 14:56, 25 March 2014 diff hist 0 m 643.2 Local Utility Adjustments - Public and Private →643.2.1.35 Lightcore, a Centurytel Company, Agreement
- 14:54, 25 March 2014 diff hist +1,239 m 643.2 Local Utility Adjustments - Public and Private Per Design, clarification of "no utility impact" projects.
- 09:19, 25 March 2014 diff hist +417 m Talk:230.2 Vertical Alignment current
- 09:16, 25 March 2014 diff hist 0 m 230.2 Vertical Alignment
- 09:15, 25 March 2014 diff hist 0 N File:Green Book Table 3-34.pdf current
- 09:15, 25 March 2014 diff hist +292 m 230.2 Vertical Alignment Added AASHTO's Table 3-34 for crest vertical curves
- 08:14, 25 March 2014 diff hist 0 N File:Main Page Mar 25, 2014.jpg current
- 08:14, 25 March 2014 diff hist -219 m Main Page QRG
- 08:14, 25 March 2014 diff hist 0 N File:Emergency Contacts.docx
- 07:37, 25 March 2014 diff hist +57 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, new Emergency Contacts QRG tells how to enter direct contact & after-hour emergency phone #s for both contractor and project office personnel
- 10:15, 24 March 2014 diff hist +5 m LPA:136.11 Local Public Agency Construction Updated old bulletin checklist
- 14:40, 21 March 2014 diff hist -2 m Main Page EPG 751.50
- 14:37, 21 March 2014 diff hist +642 m 751.50 Standard Detailing Notes Per Bridge, added notes to new EPG 751.50 H2C4 section on Prestressed Concrete Box Beams since Bridge is incorporating prestressed concrete spread box beam details into Bridge Standard Drawings.
- 07:48, 21 March 2014 diff hist 0 N File:Main Page Mar 21, 2014.jpg current
- 07:47, 21 March 2014 diff hist -342 m Main Page EPG 134.5.2
- 07:17, 21 March 2014 diff hist +172 m Category:134 Engineering Professional Services →134.5.2 Supplemental Agreements: Per Design, it is no longer required to send an electronic copy of a supplemental agreement to Audits Division
- 12:51, 20 March 2014 diff hist -191 m Main Page EPG 110.2
- 12:34, 20 March 2014 diff hist +89 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, guidance about the display of notices and posters was clarified
- 12:05, 20 March 2014 diff hist -216 m 121.2 The Planning Framework for Transportation Decision-Making deleted linkto 2007 LRTP
- 11:08, 20 March 2014 diff hist +200 m 121.2 The Planning Framework for Transportation Decision-Making Per Planning, added link to 2014 LRTP and removed references to LRTP policies that are fiscally constrained or having an agreed upon timeframe.
- 10:56, 20 March 2014 diff hist +453 m 141.1 Cost Share Program Per Design, a temporary note added to inform readers of recent MHTC action affecting the Cost Share Program
- 09:09, 20 March 2014 diff hist 0 N File:236.3 Form A419 Mar 20 2014.docx
- 09:09, 20 March 2014 diff hist 0 m 236.3 Administration Per RW, again updated Form A419
- 09:04, 20 March 2014 diff hist 0 N File:236.16 Billboard Controlled Routes.pdf
- 09:04, 20 March 2014 diff hist -38 m 236.16 Outdoor Advertising Per RW, updated Fig. 236.16 Billboard Controlled Routes